Chautauqua County, New York
Town of Ripley is a town in Chautauqua County, New York. Town of Ripley adopts its own zoning, so inside its limits Town of Ripley’s rules apply, not the county’s. Septic permits inside Town of Ripley come from Chautauqua County (Chautauqua County Health Department (Environmental Health Division) · 716-753-4312). 19 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Chautauqua County page.
New construction and uses listed in the Ripley land use matrix, inside Ripley town limits
“r = zoning permit required - by right n = yes allowed, abide by rules”
All land inside Ripley town limits
“town of ripley zoning february 9, 2017 town of ripley zoning law article i: title, enacting clause and purpose”
Zoning districts of Ripley town
“town of ripley - zoning districts area standards summary table setbacks district / type of use”
Single-family dwellings in the rural and agricultural district inside Ripley town
minimum floor space, single-family (primary use), rural district: >= 900 sq ft
“12,000 (s) 5,000 (ns) 30% 200 50 20 25 (s) 5 (ns) 900 2.5 (s) 2 (ns)”
Single-family dwellings in the R-1 residential (smaller lot) district inside Ripley town
minimum lot size, sewered: >= 12000 sq ft (sewered lots (s)) · minimum lot size, no sewer: >= 20000 sq ft (lots without sewer (ns))
“12,000 (s) 20,000 (ns) 20% ----- 50% structure front yard (feet)”
“12,000 (s) 5,000 (ns) 30% 200 50 20 25 (s) 5 (ns) 900 2.5 (s) 2 (ns)”
Single-family dwellings in the rural and agricultural district inside Ripley town
minimum front yard: >= 50 feet · minimum side yard: >= 20 feet · minimum rear yard, sewered: >= 25 feet (sewered lots (s)) · minimum rear yard, no sewer: >= 5 feet (lots without sewer (ns))
“12,000 (s) 5,000 (ns) 30% 200 50 20 25 (s) 5 (ns) 900 2.5 (s) 2 (ns)”
Single-family dwellings in the R-1 residential (smaller lot) district inside Ripley town
maximum lot coverage: <= 20 percent
“12,000 (s) 20,000 (ns) 20% ----- 50% structure front yard (feet)”
“12,000 (s) 5,000 (ns) 30% 200 50 20 25 (s) 5 (ns) 900 2.5 (s) 2 (ns)”
Single-family dwellings in the rural and agricultural district inside Ripley town
maximum building height, sewered: <= 2.5 stories (sewered lots (s)) · maximum building height, no sewer: <= 2 stories (lots without sewer (ns))
“12,000 (s) 5,000 (ns) 30% 200 50 20 25 (s) 5 (ns) 900 2.5 (s) 2 (ns)”
Travel trailer (RV) occupancy in travel trailer campgrounds inside Ripley town
“d. occupancy - travel trailers shall be used for seasonal occupancy only. travel trailers shall not be utilized as permanent residence.”
Seasonal private camps on land inside Ripley town
minimum lot size for seasonal camp: >= 2 acres (parcels of 2 to 10 acres) · maximum lot size for seasonal camp: <= 10 acres · minimum structure setback: >= 200 feet
“a. size of lot - seasonal camps shall be allowed on 2 to 10 acre parcels.”
“travel trailer campgrounds shall be allowed by special use permit in accordance with the following conditions”
Single-family mobile homes placed on individual private lots inside Ripley town
“minimum area requirements for the placement of individual mobile homes on private property shall be in accordance with the requirements for single family dwellings.”
Private sanitation systems on land inside Ripley town
“a. no cesspools shall be permitted. b. all septic tank installations shall conform to the requirements of the chautauqua county health department.”
Division of land that already has a building on it inside Ripley town
“b. division of zoning lots - no zoning lot improved with a building or buildings shall hereafter be divided into two (2) or more zoning lots”
New buildings inside Ripley town
private road or drive right-of-way: >= 50 feet (new private road or drive connecting to a public street)
“all new buildings must be built on lots that either: a. abut an existing road, or b. have a legal easement for permanent public access dated prior to the enactment of this law, or c. have access created for such building(s) by a new private road or drive with a 50-foot right of way connecting to a public street”
Parcels inside the FEMA-mapped flood plain in Ripley town
“it shall be the responsibility of the applicant for a zoning/building permit to insure that the national flood insurance regulations in addition to zoning regulation shall be complied with for those parcels located within the flood plain as shown on official flood insurance administration maps.”
Town of Ripley does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
We looked and could not find an official answer yet. Silence is not permission; ask Town of Ripley or Chautauqua County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Ripley publishes no rule on the point, not that none exists. Chautauqua County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Ripley means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.