Rules another office applies inside Town of North Harmony
Town of North Harmony does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Who permits septicCounty (with conditions)
New onsite wastewater treatment system (OWTS / septic) installed or corrected on land inside North Harmony town, Chautauqua County, NY. The Chautauqua County Health Department (Chautauqua County Health District) administers it under its Sanitary Code; the town's role is limited to receiving copies of permits and approvals.
- The packet states the application is made under article iv, section 4 of the sanitary code of the chautauqua county health district.
- The packet says copies of permits and approval letters go to the town code enforcement officer, but it does not assign the town any permit-issuing role for septic.
- The packet does not name North Harmony town specifically; the county handling of septic inside the town rests on the county packet's Sanitary Code application.
“under the provisions of article iv, section 4 of the sanitary code of the chautauqua county health district, application to install or correct an onsite wastewater treatment system (owts) is made by:”
Septic permitRequired
New onsite wastewater treatment system (OWTS) inside North Harmony town, Chautauqua County, NY, issued by the Chautauqua County Health Department
- Construction may not begin until the county health department issues the OWTS permit (or gives verbal approval, per the packet's process steps).
- Changes to permitted plans require approval from the county environmental health staff or the permit may be voided.
- The contractor submits the application with a fee and a site drawing; the packet does not state the fee amount in the opened text.
“i understand that owts construction must not occur before a permit is issued”
Septic inspectionRequired
New onsite wastewater treatment system (OWTS) inside North Harmony town, Chautauqua County, NY, inspected by the Chautauqua County Health Department
- The contractor requests the final inspection with 48 hour notice, and all components of the system must be complete at the time of the requested inspection.
- The county inspector either approves the system or requires correction.
- The system may not be put into service until inspected by the county health department.
final inspection notice: >= 48 hours
“after installation the system must not be put into service until it is inspected by a representative of the chautauqua county health department.”
Permit processPartial
Septic (OWTS) permit process only, for land inside North Harmony town. No general building-permit or zoning-permit process for the town was located.
- Steps: contractor and owner submit the application; county field staff meet the contractor at the site; contractor completes the application and returns it with fee; county reviews and issues the permit; construction begins after approval; final inspection; approval letter and as-built drawing sent to applicant with copies to the town code enforcement officer and contractor.
- The packet gives this process for OWTS only; the town's own permit process is not published in the opened pages.
“copies are sent to applicant, town code enforcement officer, and contractor.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Town of North Harmony or Chautauqua County directly.
- Building permit — Building permits for residential construction inside North Harmony town
- Owner-builder exemption — Owner-builder exemption for North Harmony town residents
- Building code adopted — Building code adoption inside North Harmony town
- Inspections — Building inspections for residential construction inside North Harmony town
- Certificate of occupancy — Certificate of occupancy for new homes inside North Harmony town
21 more unanswered
- Local zoning
- Zoning districts
- Minimum dwelling size
- Minimum lot size
- Setbacks
- Lot coverage
- Building height
- Living in an RV
- Camping on your land
- Tiny homes
- Manufactured homes
- Accessory dwellings
- Off-grid sanitation
- Well permit
- Mandatory utility hookup
- Agricultural exemption
- Subdividing land
- Driveway access
- Building in a floodplain
- Short-term rentals
- Permit fees
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.