Zoning, building permits and septic rules in Town of Ellery, New York

Town of Ellery is a town in Chautauqua County, New York. Septic permits inside Town of Ellery come from Chautauqua County (Chautauqua County Health Department (Environmental Health Division) · 716-753-4312). 5 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Chautauqua County page.

Answers from the rulebook for Town of Ellery

Rules another office applies inside Town of Ellery

Town of Ellery does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Private onsite wastewater treatment systems, including systems on Town/Village application forms, inside Ellery town.

    • The County Health District sanitary code applies; design depends on bedrooms, facility use, property size and shape, topography, soil characteristics, water-table levels, and required New York offsets.
    “The Chautauqua County Environmental Health Unit has received your request for a permit to install an onsite wastewater treatment system (OWTS).”
  • Septic permitRequired

    Construction of an onsite wastewater treatment system inside Ellery town.

    • OWTS construction must not occur before permit issuance.
    • The system must be installed and operated under the Chautauqua County Health District sanitary code.
    • The system may not be put into service before Environmental Health Unit inspection.
    “I understand that OWTS construction must not occur prior to the issuance of a permit”
  • Septic inspectionRequired

    New or corrected onsite wastewater treatment systems inside Ellery town.

    • The contractor requests final inspection with 24-hour notice.
    • All system components must be complete when inspection is requested.
    • The system cannot be used before inspection.

    advance notice for final inspection: >= 24 hours

    “Contractor requests final inspection with 24 hour notice. All components of the system must be complete at time of requested inspection.”
  • Permit feesPublished (with conditions)

    County OWTS permits for systems inside Ellery town.

    • The schedule states that it applies as of January 1, 2016.
    • The listed fees are $200 for correction or replacement on an existing home, $200 for a new OWTS at a newly constructed home, $75 for septic-tank replacement, $75 for distribution-box replacement, and $30 for an OWTS permit extension.

    new OWTS permit fee: 200 USD (newly constructed home) · OWTS permit extension fee: 30 USD

    “As of JANUARY 1, 2016 PERMIT FEES are as follows: Correction or replacement on an existing home $200 Newly constructed home (new OWTS) $200 Septic tank replacement permit $ 75 Distribution box replacement permit $ 75 OWTS Permit extension $ 30”
  • Permit processPublished (with conditions)

    County OWTS permit applications for systems inside Ellery town.

    • Applicant completes application, site plan, percolation testing, and soil-characteristics chart.
    • Applicant meets at the site with County Environmental Health staff.
    • The completed application and fee are submitted to the local district office.
    • Construction begins only after plans are approved by permit or verbal approval.
    • The owner or contractor must request final inspection with 24-hour notice.

    OWTS permit validity: 1 year (once issued)

    “Construction begins only after plans have been reviewed and approved (permit issued, or verbal approval given).”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Ellery or Chautauqua County directly.

  • Building permit — Residential construction inside Ellery town.
  • Owner-builder exemption — Owner-built homes inside Ellery town.
  • Building code adopted — Buildings inside Ellery town.
  • Inspections — Residential construction inside Ellery town.
  • Certificate of occupancy — Buildings inside Ellery town.
15 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Ellery publishes no rule on the point, not that none exists. Chautauqua County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Ellery means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Chautauqua County: county rules, score and offices