Cattaraugus County, New York
Town of New Albion is a town in Cattaraugus County, New York. Town of New Albion adopts its own zoning, so inside its limits Town of New Albion’s rules apply, not the county’s. Septic permits inside Town of New Albion come from Cattaraugus County (Cattaraugus County Health Department - Environmental Health Division · 716-373-8050). 11 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Cattaraugus County page.
Land inside the Town of New Albion, Cattaraugus County, New York.
“Town of New Albion Zoning Law Adopted by the Town Board June 17, 2002”
Zoning districts established by the Town of New Albion Zoning Law.
“A-F Agricultural-Forestry District A-R Agricultural-Residential District R-1 Rural Residential District B-1 General Business District I-1 General Industrial District I-2 Special Industrial District”
Land-use districts inside the Town of New Albion.
“Table 7.2, Table of Dimensional Regulations, contains the minimum lot size, minimum lot width, minimum yard requirements, maximum building height and maximum lot coverage for each land use district.”
Land-use districts inside the Town of New Albion.
“The minimum front yard for a lot shall be determined by measuring at right angles from the nearest street right-of-way line. The rear and side yards shall be determined by measuring at right angles from the rear and side property lines, respectively.”
Land-use districts inside the Town of New Albion.
“Table 7.2, Table of Dimensional Regulations, contains the minimum lot size, minimum lot width, minimum yard requirements, maximum building height and maximum lot coverage for each land use district.”
Land-use districts inside the Town of New Albion.
“The height limitations contained in Table 7.2, Table of Dimensional Regulations, do not apply to spires, belfries, cupolas, water tanks, ventilators, chimneys, silos, grain elevators, antennas, radio or television towers, or any appurtenances usually required to be placed above the roof level and not intended for human occupancy.”
Onsite wastewater systems inside the Town of New Albion, which is in Cattaraugus County.
“Onsite wastewater treatment systems in Cattaraugus County are regulated by the Environmental Health Division in accordance with NYS standards and specifications (10NYCRR Appendix 75-A: Wastewater Treatment Standards - Residential Onsite Systems) in effect at the time of their construction.”
Onsite wastewater treatment-system repairs or installations inside the Town of New Albion.
commercial-system-design-flow: >= 1000 gallons per day (Also requires NYS DEC SPDES permit and licensed Professional Engineer.)
“All onsite wastewater treatment system repairs or installations in Cattaraugus County require a permit issued by the Environmental Health Division prior to construction. Commercial systems and other large wastewater treatment systems (with a design flow of 1000 gallons per day or greater) also require a State Pollution Discharge Elimination System (SPDES) Permit issued by the NYS Department of Environmental Conservation and require the services of a licensed Professional Engineer.”
New onsite wastewater treatment systems inside the Town of New Albion.
“The contractor or owner must cause inspection of the onsite wastewater treatment system at completion, prior to backfill, and as may be deemed necessary by the Department.”
Properties inside the Town of New Albion served by public water or wastewater systems determined available and accessible by the Cattaraugus County Health Department.
“Where in the opinion of the Department, a public water system is available and accessible, the Department may direct the owner of any property whereon any other method of water supply is located, requiring such owner to abandon the use of such other method of water supply and to connect with such public water system. [...] Where in the opinion of the Department, a public wastewater treatment systems is available and accessible, the Department may direct the owner requiring abandonment of existing onsite wastewater treatment system(s) and connection to the public wastewater treatment system.”
Development in a Special Flood Hazard Area within the Town of New Albion.
“A Special Flood Hazard Area (SFHA) Development Permit shall be obtained from the Town Zoning Inspector before development of any of the above permitted uses may begin.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of New Albion or Cattaraugus County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of New Albion publishes no rule on the point, not that none exists. Cattaraugus County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of New Albion means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
← All of Cattaraugus County: county rules, score and offices