Allegany County, New York
Village of Alfred is a village in Allegany County, New York. Village of Alfred adopts its own zoning, so inside its limits Village of Alfred’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Allegany County page.
Construction inside the Village of Alfred
“you need a building permit for most new construction and for structural changes to the interior or exterior of an existing building.”
Land inside the Village of Alfred, Allegany County, NY
“this law is enacted pursuant to the authority and power granted by the municipal home rule law of the state of new york, article 2, §10 et seq., and article vii of the nys village law.”
Zoning districts inside the Village of Alfred
“the village of alfred is divided into several zoning districts. different rules apply in different zoning districts.”
Single-family dwelling in the R-1 One-Family Residence District, Village of Alfred
minimum lot area, single family: >= 12000 sq ft · minimum lot width: >= 100 ft
“single family 12,000 100 25 10 rear side rear principal accessory 30 10 10 35 16 35 25 r-2, r-3, b-1, b-2 churches”
Single-family principal building, R-1 district, Village of Alfred
front yard principal building: >= 25 ft · side yard principal building: >= 10 ft · rear yard principal building: >= 30 ft
“single family 12,000 100 25 10 rear side rear principal accessory 30 10 10 35 16 35 25 r-2, r-3, b-1, b-2 churches”
Tiny homes inside the Village of Alfred
“a manufactured home or a tiny home may be placed and/or constructed in an r-2 district, or e-1 district provided the conditions set forth in this subsection h are satisfied.”
Manufactured homes inside the Village of Alfred
“a manufactured home or tiny home may only be placed and/or constructed as a detached structure on a foundation and must comply with all set back requirements and minimum lot requirements set forth in section 105.00”
Building and zoning permit applications inside the Village of Alfred
“be sure to read the permit application process prior to completing and submitting your permit(s) to the village clerk.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Alfred or Allegany County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Alfred publishes no rule on the point, not that none exists. Allegany County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Alfred means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.