Building permits, zoning and land rules in Boulder City, Nevada

Boulder City, Nevada requires a building permit for construction and changes of use covered by its adopted building codes, and the city administers zoning inside city limits.123 Residential septic systems in Clark County are permitted and inspected by the Southern Nevada Health District.4 Tiny homes have a specific size exception in the ME district, but that exception does not establish permission to live in an RV on a residential lot.5

At a glance

Building permit
Required for covered construction and changes of use; apply to Boulder City126
Zoning
City zoning applies inside Boulder City limits3
Residential septic
Southern Nevada Health District permits and inspects residential systems in Clark County4
Tiny homes
ME excludes tiny homes from the 900-square-foot mobile-home minimum; confirm parcel eligibility with city planning5
Owner-builder
Conditional contractor-license exemption; city requires ownership and residence at the property78
Driveway approach
City Public Works excavation permit for a new, moved or width-adjusted approach in public right-of-way9
Occupancy
City certificate of occupancy required before using or occupying a building10

Who to call

Building permits

Boulder City Community Development — Building and Safety

City building applications, plan review, building inspections and certificates of occupancy

702-293-9282

401 California Avenue Boulder City , NV 89005

Zoning

Boulder City Planning and Zoning Division

City development-review applications and pre-submittal planning meetings

[email protected]

Septic permits

Southern Nevada Health District — ISDS Program

Residential septic permitting and inspections in Clark County

(702) 759-0660

[email protected]

280 S. Decatur Blvd. Las Vegas, NV 89107

Roads & driveways

Boulder City Public Works

City public right-of-way and excavation applications

702-293-9200

401 California Avenue Boulder City , NV 89005

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Boulder City means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Boulder City, NV?

Boulder City construction, alterations and changes of use need a building permit when covered by the adopted building code or zoning regulations; Nevada law requires the plans to comply with both.12 Boulder City Building and Safety inspects permitted buildings against approved plans, and buildings cannot be used or occupied before the Building Official issues a certificate of occupancy.1110 A temporary certificate may allow safe occupancy of a portion before all work is complete.10

Boulder City’s owner-builder provision applies to an owner who resides at the residential property and acts as the contractor; an unlicensed owner-builder cannot work in the public right-of-way.7 Nevada’s owner-builder exemption concerns contractor licensing, requires an application to the State Contractors’ Board and disclosure to the local building official, and is for the owner’s occupancy rather than sale or lease.8

Who issues building permits in Boulder City, and how do you apply?

Boulder City Community Development’s Building and Safety office is the city contact for building applications, plan review and building inspections.12 Call 702-293-9282 or visit 401 California Avenue Boulder City , NV 89005 for the building office.12 Boulder City building applications are completed online, and staff first review the submission for completeness.126

An accepted Boulder City building application triggers a non-refundable plan-review deposit; review starts after staff verify payment, and approval may leave a remaining building-permit fee balance.1312 Approved building permits are issued 1–2 business days after payment is received; that is the issuance interval after approval and payment, rather than the time needed for plan review.12 If plans are not approved, the city sends plan-review comments explaining what is needed.12

Does Boulder City have zoning, lot-size and setback rules?

Boulder City administers its own zoning inside city limits, so parcel-specific questions belong with the city Planning and Zoning Division.314 The city recommends a planning meeting before formal development submission; email development application materials to [email protected].14

Boulder City dimensional rules vary by district: A1 requires a front yard at least 20 feet deep, with side and rear requirements triggered by adjacency to R, ME or MP zoning.15 ME limits lot coverage to 50%, while R2 limits structure height to 25 feet and buildings to 2 stories.1617 Ask Planning and Zoning to identify the parcel’s district and confirm its minimum lot area and full setback schedule before selecting a house plan.143

How do residential septic permits and wells work in Boulder City?

Southern Nevada Health District permits, inspects and regulates residential septic systems in Clark County; Boulder City’s building office is a separate authority.412 Call the district’s ISDS Program at (702) 759-0660 to schedule a new septic-permit or modification appointment.18 Ask the district’s ISDS Program about septic approval and existing-system records for a Boulder City parcel, and ask city planning whether the proposed sanitation arrangement is acceptable for the property.414 We could not confirm whether an off-grid sanitation arrangement is acceptable where city utilities are available; resolve that with city planning and the ISDS Program before buying.144

Nevada generally exempts domestic wells from groundwater appropriation permits, but requires a waiver before drilling or specified work when a public provider’s water service is available; other permit triggers also apply.19 A domestic well is therefore not an automatic route around an available municipal supply.19

Can you live in an RV or tiny home on land in Boulder City?

We could not confirm a general allowance for living in an RV on a private Boulder City residential lot; ask Planning and Zoning about the parcel and any proposed stay during construction.14 Boulder City’s public-place camping prohibition covers public rights-of-way and specified public land and facilities, with limited exceptions; that rule does not establish a blanket private-property camping ban.20

In Boulder City’s ME Mobile Home Estate zone, mobile-home units ordinarily need 900 square feet, but tiny homes are expressly excluded from that minimum.5 The size exception does not establish permission on every residential parcel, and the R1 rule says accessory buildings cannot be inhabited.521 Manufactured homes in residential R zones must be permanently affixed and satisfy district living-area, setback and appearance conditions; the local rule excludes historic districts and preserves restrictive covenants.22

What are the steps to building a home in Boulder City?

  1. Meet Boulder City Planning and Zoning about the parcel’s district and the proposal before submitting a development application.14
  2. Resolve residential septic questions with Southern Nevada Health District and any domestic-well waiver or permit triggers under Nevada law before committing to the water and sanitation design.419
  3. Submit the city building application and supporting plans, then pay the non-refundable plan-review deposit after acceptance.613
  4. Complete plan-review corrections and pay the remaining building-permit balance after approval.1213
  5. Obtain a Public Works excavation permit if constructing, moving or changing the width of a driveway approach in public right-of-way.9
  6. Arrange required building inspections and obtain the city certificate of occupancy before moving in.1110

What should you check before buying land in Boulder City?

Ask Boulder City Planning and Zoning to confirm the parcel’s district, the proposed dwelling type and whether development review is needed; the city recommends discussing proposals before formal submission.314 We could not confirm an agricultural building-permit exemption or the operative floodplain development requirements for Boulder City parcels; ask Building and Safety and Planning and Zoning to resolve those questions for the site.1214

Boulder City prohibits short-term rentals of residential dwelling units or portions of units, defining short-term occupancy as less than 30 consecutive calendar days.23 Do not budget on that rental use funding the property.23 For property outside Boulder City limits, use the Clark County guide for the county’s unincorporated-area building and zoning answers.2425

Watch-outs

  • Boulder City’s ME tiny-home size exception does not override the R1 prohibition on inhabiting accessory buildings.521
  • Boulder City’s owner-builder exemption does not allow an unlicensed owner-builder to work in the public right-of-way.7
  • Boulder City short-term residential rentals can draw fines up to $500 per day.23
  • We could not confirm private-lot RV occupancy during construction in Boulder City; ask the city Planning and Zoning Division before relying on that arrangement.14

Sources

  1. NRS Chapter 278 — Planning and Zoning (Nevada statewide rule), quoted and re-checked
  2. Building and Safety (Boulder City), quoted and re-checked
  3. R1 Single-Family Residential Zone, Section 11-3-3 (Boulder City), quoted and re-checked
  4. Southern Nevada Health District - Sewage/Septic Disposal Systems (ISDS) (2026 county census)
  5. ME Mobile Home Estate Zone, Section 11-7-6 (Boulder City), quoted and re-checked
  6. Building and Safety (Boulder City), quoted and re-checked
  7. bcnv.org (Boulder City), quoted and re-checked
  8. NRS 624.031 — Applicability of chapter: Exemptions (Nevada statewide rule), quoted and re-checked
  9. Public Utility and Street Connections for Residential Development (Boulder City), quoted and re-checked
  10. 2026 Building and Safety Division Administrative Code (Boulder City), quoted and re-checked
  11. Building and Safety (Boulder City), quoted and re-checked
  12. Boulder City Community Development — Building and Safety (bcnv.org)
  13. Building and Safety (Boulder City), quoted and re-checked
  14. Boulder City Planning and Zoning Division (bcnv.org)
  15. A1 Special Agricultural Zone, Section 11-14-5 (Boulder City), quoted and re-checked
  16. library.municode.com (Boulder City), quoted and re-checked
  17. R2 Two-Family Residential Zone, Section 11-4-5 (Boulder City), quoted and re-checked
  18. Southern Nevada Health District — ISDS Program (southernnevadahealthdistrict.org)
  19. NAC Chapter 534 — Underground Water and Wells (Nevada statewide rule), quoted and re-checked
  20. Camping in a Public Place or on Public Right-of-Way Prohibited (Boulder City), quoted and re-checked
  21. R1 Single-Family Residential Zone, Section 11-3-3 (Boulder City), quoted and re-checked
  22. Manufactured Homes, Section 11-20-8 (Boulder City), quoted and re-checked
  23. Short Term Rentals Prohibited (Boulder City), quoted and re-checked
  24. Do I Need a Permit? (2026 county census)
  25. County Code: Title 30 - Unified Development Code (2026 county census)

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Boulder City

Boulder City’s own rules

  • Owner-builder exemptionConditional

    Owner-builders applying for residential work inside Boulder City city limits.

    • The city page says the exemption applies only if the applicant owns and resides at the residential property and acts as the own contractor.
    • An owner-builder who is not a licensed contractor may not perform work in the public right-of-way.
    “Only applies if you are the owner and reside at the residential property and will act as your own contractor.”
  • Building code adoptedAdopted

    Building plans and construction inside Boulder City city limits.

    • The city reviews plans under applicable International Building Codes and locally adopted codes.
    • The city also lists the 2026 Building and Safety Division Administrative Code.
    “applicable International Building Codes and locally adopted codes”
  • InspectionsRequired

    Permitted buildings inside Boulder City city limits.

    • Inspections are tied to permitted buildings and approved plans.
    • The permit holder must notify the Building Official when work is ready and provide access and means for required inspections.
    “staff inspect all permitted buildings to ensure compliance with the approved plans”
  • Certificate of occupancyRequired

    Use or occupancy of buildings and structures inside Boulder City city limits.

    • No building or structure may be used or occupied before issuance by the Building Official.
    • A temporary certificate may be issued before all work is complete if the portion can be occupied safely.
    “until the Building Official has issued a Certificate of Occupancy therefore as provided herein.”
  • Local zoningPresent

    Land inside Boulder City city limits; Boulder City administers Title 11 zoning and subdivision districts.

    • The adopted code contains R1, R2, R3, ME, A1 and RV zoning chapters.
    “except in an RV recreational vehicle zone so established by this chapter.”
  • Minimum dwelling sizeSpecified

    Mobile-home units in the ME Mobile Home Estate Zone.

    • Tiny homes are expressly excluded from the 900-square-foot minimum.

    minimum mobile-home unit size: >= 900 square feet (Tiny homes are excluded.)

    “Mobile Home Unit Size: Minimum nine hundred (900) square feet. Tiny homes are excluded from this requirement.”
  • SetbacksSpecified

    Lots in A1.

    • No side or rear yard is required unless adjacent to an R, ME, or MP zone; then the adjacent residential-zone requirements apply.
    • A six-foot masonry wall is required along lot lines adjacent to R, ME, or MP zones, reduced to four feet within the required front or street-side setback of that residential zone.

    front setback: >= 20 feet

    “There shall be a front yard having a depth of not less than twenty feet (20').”
  • Lot coverageSpecified

    Lots in ME.

    maximum lot coverage: <= 50 percent

    “Maximum lot coverage shall be fifty percent (50%) of the lot area.”
  • Building heightSpecified

    Structures in R2.

    • The R2 table also limits buildings to two stories.

    maximum structure height: <= 25 feet

    “Structure height, maximum | 25 Number of stories, maximum 2 stories”
  • Camping on your landLimited

    Temporary camping inside Boulder City city limits.

    • Camping is unlawful in public rights-of-way, trails, parks, public buildings, bus stops, benches, gazebos, playground equipment, publicly owned parking lots, and publicly owned land.
    • Exceptions include emergencies, approved special events, and a special-use permit for specified city property.
    • The cited rule does not establish a general private-property camping prohibition.
    “it is unlawful for any person to engage in camping in any public right-of-way; any trail, public park, or park facility;”
  • Manufactured homesAllowed (with conditions)

    Manufactured homes on residential lots inside Boulder City city limits.

    • Manufactured homes are allowed in residential R zones only if permanently affixed to a residential lot.
    • The home must have been manufactured within six years before affixation.
    • It must have similar exterior siding and roofing, more than one section, comply with zone living-area and setback requirements, have at least five sides, mask elevated foundations and anchoring systems, and match nearby garages or carports when applicable.
    • The rule does not apply in historic districts and does not void recorded restrictive covenants.

    maximum age before affixation: <= 6 years

    “Manufactured homes are allowed in residential (R) zones provided such use complies with all of the following:”
  • Accessory dwellingsLimited

    Inhabitation of accessory buildings in the R1 Single-Family Residential Zone inside Boulder City city limits.

    • R1 permits accessory uses and structures customarily incidental to residential use, but the cited section states accessory buildings shall not be inhabited.
    • The source does not establish a separate citywide ADU program.
    “no accessory buildings shall be inhabited.”
  • Driveway accessRequired

    New, relocated, or width-adjusted driveway approaches in the public right-of-way inside Boulder City city limits.

    • A driveway approach is the portion in the public right-of-way connecting a private driveway to the adjacent street.
    • The design must follow RTC Uniform Standards.
    “If a driveway approach is to be constructed as new, moved, or the width adjusted, then an excavation permit from the Public Works Department is required.”
  • Short-term rentalsProhibited

    Short-term rentals of residential dwelling units or portions of units inside Boulder City city limits.

    • Short-term rental means occupancy for less than 30 consecutive calendar days.
    • The city page states fines may reach $500 per day.

    short-term rental duration: < 30 consecutive calendar days · maximum fine stated: 500 USD per day

    “The ordinance specifies that STRs are prohibited and sets fines for those who operate STRs.”
  • Permit feesPublished (with conditions)

    Building and development applications inside Boulder City city limits.

    • Building applications require a non-refundable plan-review deposit after acceptance and may require a remaining permit-fee balance after approval.
    • Development-review fees must be paid before processing begins.
    “After submittal is accepted, an automated email will be sent to applicant to pay non-refundable plan review deposit fee.”
  • Permit processPublished (with conditions)

    Building and development permit processing inside Boulder City city limits.

    • Applications are submitted online or, when electronic submission is not possible, at City Hall.
    • The city reviews completeness, requires payment before processing, and issues approved building permits one to two business days after permit payment.
    “Approved permits are issued 1-2 business days after permit payment is received.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Boulder City or Clark County directly.

  • Septic permit — Residential septic systems inside Boulder City city limits.
  • Septic inspection — Residential septic systems inside Boulder City city limits.
  • Off-grid sanitation — Off-grid sanitation for residences inside Boulder City city limits.
  • Well permit — Private wells inside Boulder City city limits.
  • Agricultural exemption — Agricultural structures and uses inside Boulder City city limits.
1 more unanswered
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Boulder City publishes no rule on the point, not that none exists. Clark County’s page lists the county offices to call.