San Juan County, New Mexico
Aztec is a city in San Juan County, New Mexico. Aztec adopts its own zoning, so inside its limits Aztec’s rules apply, not the county’s. Septic permits inside Aztec come from the county and state together. 22 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the San Juan County page.
Building improvements and construction inside Aztec city limits.
“All building improvements and construction require a permit from the Community Development Department before a building permit can be issued by the San Juan County Building Department.”
Buildings and construction inside Aztec city limits.
“All buildings and construction shall comply with the most current edition of the New Mexico Building Code (NMBC) and the New Mexico Residential Building Code (NMRBC)”
Building improvements and construction inside Aztec city limits; inspection service is administered by San Juan County Building Department.
“All inspections of building improvements and construction are overseen by the San Juan County Building Department.”
Construction inside Aztec city limits for which construction requirements are inspected and approved; San Juan County Building Department issues the certificate.
“The San Juan County Building Department is the agency that issues a Certificate of Occupancy when all construction requirements are inspected and approved.”
Land and parcels within Aztec city limits.
“Chapter 26 of the City Code which regulates the zoning and land use of parcels within the City limits of Aztec.”
Land inside Aztec city limits.
“All development of property is governed according to the district in which it is located.”
Travel trailers and motor homes used as dwellings on lots containing a dwelling in the R-1 single-family district.
temporary dwelling duration: <= 14 consecutive days (Travel trailer or motor home.) · construction trailer duration: <= 6 months (Period begins on issuance of building permit for construction of dwelling.)
“A travel trailer or motor home being used as for temporary dwelling purposes for a maximum of fourteen (14) consecutive days.”
Accessory dwelling units in the R-1 single-family district inside Aztec city limits.
maximum share of primary dwelling unit area: <= 40 percent · maximum share of rear yard area: <= 25 percent
“The following uses will be permitted in the R-1 District provided that the use has been reviewed by the Community Development Department and approved by the City Commission:”
Private sewage disposal systems inside Aztec city limits.
“Before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit endorsed by the state environmental improvement division and signed by the director.”
Construction of a private sewage disposal system inside Aztec city limits.
“Before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit endorsed by the state environmental improvement division and signed by the director.”
Private sewage disposal system installations inside Aztec city limits.
“the applicant for the permit shall notify the director when the work is ready for final inspection, and before any underground portions are covered.”
Private sewage disposal for properties inside Aztec city limits where public sanitary sewer is not available under City Code Sec. 25-112.
“Where a public sanitary sewer is not available under the provisions of Section 25-112, the building sewer shall be connected to a private sewage disposal system complying with the provisions of this division.”
Human-occupied houses, buildings, and properties inside Aztec city limits that abut a street, alley, or right-of-way containing a City public sanitary sewer within 100 feet of the property line.
public sewer distance from property line: <= 100 feet (Public sewer must be in the abutting street, alley, or right-of-way.) · connection deadline after official notice: <= 90 days
“within ninety (90) days after date of official notice to do so, provided that the public sewer is within one hundred (100) feet of the property line.”
Subdivisions of land within Aztec city limits.
“These regulations apply to all subdivision of land, as defined in Section 23-31, located within the corporate limits of the City of Aztec and all territory within three (3) miles of such present municipal boundary.”
Development in areas regulated by Aztec's flood-damage-prevention regulations inside city limits.
“A Floodplain Use Permit shall be required to ensure conformance with the provisions of these regulations.”
City land-use applications for development inside Aztec city limits.
land use application administrative fee: 10 USD (Each application submitted for City review.) · new single-family residential dwelling land-use permit fee: 25 USD (Includes an accessory dwelling unit.)
“The City shall collect an administrative fee of $ 10.00 for each land use application submitted to the City for review.”
Community Development Department permits inside Aztec city limits.
“All permits from the Community Development Department require an applicant to complete an application in order to obtain a permit. All applications require a site plan. Depending on the permit request, additional forms may be required.”
Aztec does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Single-family dwellings in Aztec R-1 single-family dwelling district.
minimum dwelling floor space: >= 800 square feet
“The dwelling unit must contain at least eight hundred (800) square feet of floor space on a permanent foundation.”
Lots in Aztec R-1 single-family dwelling district.
minimum lot area: >= 7000 square feet · minimum lot width: >= 65 feet (Measured at actual building setback.)
“Minimum lot area shall be seven thousand (7,000) square feet.”
Buildings, mobile homes, and dwelling structures in Aztec R-1 single-family dwelling district.
front yard setback: >= 25 feet (From established or future street right-of-way or property line.) · side yard setback for dwelling: >= 5 feet (15 feet on street side of corner lots.) · rear yard setback for dwelling: >= 30 feet (25 feet on double-frontage lots.)
“The front yard setback shall be a minimum of twenty-five (25) feet from the established or future street right-of-way or property line.”
Lots in Aztec R-1 single-family dwelling district.
maximum lot coverage: <= 50 percent (Main and accessory buildings combined.)
“Coverage of each lot by main and accessory buildings shall not exceed fifty percent (50%).”
Buildings and structures in Aztec R-1 single-family dwelling district.
maximum building height: <= 35 feet (Measured above natural adjacent ground level.)
“All buildings and structures in this district shall be limited to thirty-five (35) feet above natural adjacent ground level.”
We looked and could not find an official answer yet. Silence is not permission; ask Aztec or San Juan County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Aztec publishes no rule on the point, not that none exists. San Juan County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Aztec means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.