Union County, New Jersey
Linden is a city in Union County, New Jersey. Linden adopts its own zoning, so inside its limits Linden’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Union County page.
New buildings, plans, and premises subject to Linden zoning and construction enforcement.
“It shall be the duty of the Construction Official, or his representative, to cause any new buildings, plans or premises to be inspected or examined and to order in writing that any condition be remedied which is found to exist in violation of any provisions of this chapter and he shall have the right to enter any building or premises in the course of his duties.”
Any building or part of a building inside Linden city that is erected, altered, converted, or enlarged.
“It shall be unlawful for any owner to use or permit the use of any building or part thereof, hereafter erected, altered, converted or enlarged, wholly or in part, until a Certificate of Occupancy, applied for at the time of application for a building permit, shall have been issued by the Construction Official.”
Land inside Linden city.
“This chapter shall be known and may be cited as the "City of Linden Zoning Ordinance."”
Dwelling units inside Linden city, under the housing occupancy code.
minimum gross floor area for first occupant: >= 150 square feet · additional area for each of next two occupants: per 100 square feet · additional area for each later occupant: per 75 square feet
“Every dwelling unit shall contain a minimum gross floor area of at least one hundred fifty (150) square feet for the first occupant, at least one hundred (100) additional square feet for each of the next two (2) occupants, and at least seventy-five (75) square feet for each occupant thereafter.”
Homes, buildings, and structures inside Linden city situated within 200 feet of a public water distribution main.
distance from public water main: <= 200 feet (Existing private water supply may remain for non-potable uses subject to stated conditions.)
“All homes, buildings or structures situated within 200 feet of a public water distribution main must be connected to the public water system of the City of Linden.”
New dwellings on subdivided land inside Linden city.
“No building permit shall be issued for any new dwelling located in a subdivision unless that subdivision is duly approved by the Planning Board and Council in accordance with the provisions of the Land Development Regulations of Chapter 29.”
New construction and substantial improvements in Linden city flood hazard areas.
“All new construction and substantial improvement of any habitable building (as defined in Section 26-201) located in flood hazard areas shall have the lowest floor, including basement, together with the attendant utilities (including all electrical, heating, ventilating, air-conditioning and other service equipment) and sanitary facilities, elevated to or above the Local Design Flood Elevation as determined in Section 26-102.3, be in conformance with ASCE Chapter 7, and be confirmed by an Elevation Certificate.”
New or increased-flow sewer connections serving premises inside Linden city.
equivalent service unit assumed flow: 255 gallons per day · sewer connection fee: 1750 USD per equivalent service unit
“The connection fee shall be calculated as follows: one thousand seven hundred fifty ($1,750.00) dollars per each equivalent service unit.”
Construction and zoning-related permit applications inside Linden city.
“Paperwork may vary according to the type of work being performed. Applications must be filled out completely. All prior approvals from the Zoning Official must be obtained when applicable prior to submitting applications.”
Linden does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
A building inside Linden city using an individual onsite septic system.
“Prior to issuing a construction permit for a building using a subsurface sewage disposal (septic) system, the construction official shall require, as a prior approval, proof of certification or approval of the subsurface sewage disposal (septic) system plan from the health department having jurisdiction.”
We looked and could not find an official answer yet. Silence is not permission; ask Linden or Union County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Linden publishes no rule on the point, not that none exists. Union County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Linden means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.