Bolthole Index

Passaic County, New Jersey

Zoning, building permits and septic rules in Borough of Woodland Park, New Jersey

Borough of Woodland Park is a borough in Passaic County, New Jersey. Borough of Woodland Park adopts its own zoning, so inside its limits Borough of Woodland Park’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Passaic County page.

Answers from the rulebook for Borough of Woodland Park

Borough of Woodland Park’s own rules

  • Building code adoptedAdopted (with conditions)

    Construction in Woodland Park borough, enforced by the borough's own Department of Inspections

    • The borough's enforcing agency administers the New Jersey State Uniform Construction Code locally; the state code's technical content is not restated on the borough page.
    • Enforcement is by the borough's construction official and subcode officials.
    “it is hereby established in the borough of woodland park a state uniform construction code enforcing agency to be known as the department of inspections”
  • Certificate of occupancyRequired

    Residential units and dwellings in Woodland Park borough on change of ownership, occupancy or tenant

    • The certificate is tied to change of ownership, occupancy or tenant in residential units and dwellings, per the Chapter 17 heading.
    • A temporary certificate of occupancy is provided for in § 17-8.5; the fee schedule lists a certificate of occupancy fee (see permit_fees).
    “§ 17-8 certificate of occupancy and water meter requirements for change of ownership, occupancy or tenant in residential units and dwellings.”
  • Local zoningPresent (with conditions)

    Land inside the limits of Woodland Park borough, administered under the borough's own Chapter 22 Zoning

    • Borough adopted Chapter 22 Zoning (history: adopted 2-15-2017 by ord. no. 2017-02, amended several times, latest amendment ord. no. 26-14 dated 2026-05-06 per the page's amendment list).
    • Dimensional, use and parking rules are in the attachments (schedules), which were not fully opened in this run.
    “§ 22-5 r-a residence "a" district. a. permitted uses. see the schedule of permitted uses in subsection 22-4.4.”
  • Zoning districtsPublished (with conditions)

    Zoning districts of Woodland Park borough under Chapter 22 Zoning

    • Zone districts are listed in § 22-4.1 and the zoning map is listed as Attachment 1; the map image and schedules were not opened in this run.
    “attachment 1 - zoning map attachment 2 - schedule of permitted uses attachment 3 - schedule of bulk zoning requirements”
  • Subdividing landRegulated (with conditions)

    Division of land inside Woodland Park borough

    • Chapter 33 governs subdivision and site plan review; its substantive standards were not opened in this run.
    “chapter 33 subdivision and site plan (§ 33-1 – § 33-20.8)”
  • Permit feesPublished (with conditions)

    Construction and certificate fees charged by Woodland Park borough

    • Fees are listed in the Chapter 17 fee schedule; the schedule's adoption or effective date was not stated in the excerpt.
    • Some fees are per square foot or per $1,000 of estimated cost, per the schedule.

    certificate of occupancy letter fee: 25 USD · commercial/industrial certificate of occupancy fee: 0.04 USD per square foot ($100 minimum)

    “11. certificate of occupancy: (a) letter: $25. (b) commercial/industrial building: $0.04 per square foot; $100 minimum.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Woodland Park or Passaic County directly.

  • Owner-builder exemption — Owner-builder permit exemption for residences in Woodland Park borough
  • Inspections — Construction inspections inside Woodland Park borough
  • Minimum dwelling size — Dwellings in Woodland Park borough residence districts
  • Minimum lot size — Residence districts R-A (§ 22-5) and R-B (§ 22-6) in Woodland Park borough; the main single-family district was not confirmed
  • Setbacks — Residence districts R-A (§ 22-5) and R-B (§ 22-6) in Woodland Park borough
18 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Woodland Park publishes no rule on the point, not that none exists. Passaic County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Woodland Park means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Passaic County: county rules, score and offices