Bolthole Index

Morris County, New Jersey

Zoning, building permits and septic rules in Borough of Chester, New Jersey

Borough of Chester is a borough in Morris County, New Jersey. Borough of Chester adopts its own zoning, so inside its limits Borough of Chester’s rules apply, not the county’s. Septic permits inside Borough of Chester come from Borough of Chester. 8 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Morris County page.

Answers from the rulebook for Borough of Chester

Borough of Chester’s own rules

  • Building permitRequired

    Construction work inside Chester borough subject to the Uniform Construction Code.

    • The code states that work performed without the required permit is subject to penalties.
    • Permit fees must be paid before issuance.
    “who performs any work without the required permit, shall be subject to a penalty in accordance with N.J.A.C. 5:23-2.31.”
  • Local zoningPresent (with conditions)

    Land inside Chester borough governed by Chapter 163 Land Development and Procedures, including Article IX Zoning - Zone Requirements.

    • Specific permitted uses and dimensional controls depend on the applicable zoning district and any overlay or redevelopment plan.
    “Chapter 163 (Land Development Procedures) Article IX (Zoning – Zoning Requirements) Section 69 (Schedules) Schedule 1 - Part 1 (Schedule of Lot Area and Building Requirements) of the Borough code is in need of amendment to reduce the required setbacks for certain accessory buildings in the RHD and RLD residential zones in the Borough of Chester;”
  • Zoning districtsPublished (with conditions)

    Zoning districts and district-specific development controls inside Chester borough.

    • The code identifies a Zone Map and zoning schedules.
    • The 2023 amendment specifically refers to RHD and RLD residential zones and Schedule 1 Part 1.
    “Article IX Zoning - Zone Requirements [...] § 163-68 Zone Map. [...] § 163-69 Schedules. [...] § 163-70 General regulations and exceptions for all zones. [...] § 163-71 Residential zones.”
  • Who permits septicLocal (with conditions)

    Individual subsurface sewage disposal systems inside Chester borough.

    • The Chester Board of Health administers the state standards and may prescribe higher borough standards.
    • State standards remain the minimum requirements.
    “The provisions of this code are intended to effectuate the administration by the Board of Health of the Borough of Chester (the Board of Health) of the rules, regulations and requirements of the Standards for Individual Subsurface Sewage Disposal Systems, N.J.A.C. 7:9A-1 and following (the state standards) and to prescribe certain higher standards with respect to such systems in the Borough of Chester.”
  • Septic permitRequired

    Construction or alteration of an individual subsurface sewage disposal system inside Chester borough.

    • Applications to construct or alter an individual system are considered and acted upon by the Board of Health.
    • Repair applications that restore the existing system without changing location, design, construction, size, capacity, type, or number of components are reviewed by the Borough Sanitarian First Grade.
    “An application for a permit to construct an individual subsurface sewage disposal system;”
  • Subdividing landRegulated (with conditions)

    Subdivision applications inside Chester borough.

    • Applications are reviewed under Chapter 163 and the Municipal Land Use Law.
    • Additional county, state, wetlands, utility, and improvement requirements may apply.
    “Article VII Subdivision of Land [...] § 163-53 Approving agencies. [...] § 163-54 Subdivision approval requirements. [...] § 163-55 Conditions for approval of subdivision plans.”
  • Permit feesPublished (with conditions)

    Construction-permit fees administered by Chester borough.

    • The fee is the sum of subcode fees established in Chapter 127.
    • The minimum fee is provided in Chapter 127.
    • Fees must be paid before permit issuance.
    • A state surcharge is collected in addition to the stated fees.
    • A private on-site agency may be charged under its current contract, and a 15% administrative surcharge may apply when the borough uses such an agency.

    private on-site agency administrative surcharge: 15 percent (May be added when the borough utilizes a private on-site agency and has a contract with that agency.)

    “The fee for a construction permit shall be the sum of the subcode fees as established in Chapter 127, Fees, and shall be paid before the permit is issued. The minimum fee for all applications is as provided in Chapter 127, Fees.”
  • Permit processPartial

    Construction-permit process inside Chester borough.

    • The Building Department is the borough's Uniform Construction Code enforcing agency.
    • The public may do business with the enforcing agency at the municipal building except for emergencies and unforeseen or unavoidable circumstances.
    • Appeals from enforcing-agency decisions go to the Morris County Board of Appeals under the New Jersey Uniform Construction Code Regulations.
    • Fees are due before permit issuance.
    “The public shall have the right to do business with the enforcing agency at the municipal building except for emergencies and unforeseen or unavoidable circumstances.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Chester or Morris County directly.

  • Owner-builder exemption — Owner-builder work inside Chester borough.
  • Inspections — Building inspections inside Chester borough.
  • Minimum dwelling size — Minimum dwelling size inside Chester borough.
  • Minimum lot size — Minimum lot size inside Chester borough.
  • Setbacks — Principal-building setbacks inside Chester borough.
13 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Chester publishes no rule on the point, not that none exists. Morris County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Chester means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Morris County: county rules, score and offices