Monmouth County, New Jersey
Borough of Highlands is a borough in Monmouth County, New Jersey. 10 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Monmouth County page.
All new construction inside Highlands borough.
“A certificate of occupancy shall be required of all new construction.”
Zoning districts inside Highlands borough.
number of zone districts: 18 districts
“Borough of Highlands is hereby divided into the eighteen (18) zone districts”
Parking or occupying a trailer coach on land inside Highlands borough outside a licensed trailer camp.
“The parking of a trailer coach or coaches in other than a licensed trailer camp is hereby prohibited.”
Trailer camping inside Highlands borough.
maximum number of trailer camps: 2 camps
“It shall be unlawful for any person to maintain or operate a trailer camp within the borough limits without obtaining a license therefor from the mayor and council.”
Manufactured or mobile homes inside Highlands borough.
“applicable to mobile homes and mobile home parks.”
Property inside Highlands borough located within 600 feet of borough sewer and/or water service.
distance to sewer and/or water: <= 600 feet · connection deadline: 30 days (from providing the structure with available and required service)
“All property owners whose property is within 600 feet of sewer and/or water shall connect to same within 30 days”
Borough of Highlands does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction and covered work on existing buildings inside Highlands borough.
“A construction permit is required for any new construction”
Construction inside Highlands borough under the New Jersey Uniform Construction Code, administered locally by the borough enforcing agency.
“adopt and enforce rules pertaining to construction codes”
Construction governed by the UCC inside Highlands borough.
“The code requires construction work to stop so that certain inspections can be performed at particular points in construction”
Construction-permit applications submitted for work inside Highlands borough.
application decision deadline: 20 business days (after submission of a complete application)
“Not later than 20 business days after the submission of a complete application, the permit application must be approved or denied, by the local enforcing agency.”
We looked and could not find an official answer yet. Silence is not permission; ask Borough of Highlands or Monmouth County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Borough of Highlands publishes no rule on the point, not that none exists. Monmouth County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Borough of Highlands means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.