Bolthole Index

Monmouth County, New Jersey

Building permits and zoning in Borough of Atlantic Highlands, New Jersey

Borough of Atlantic Highlands, New Jersey requires building permits for construction regulated by the Uniform Construction Code, with borough zoning approval first.1 The borough Building Department handles construction-code enforcement in Atlantic Highlands, in Monmouth County.1 Septic approval belongs to the board of health having jurisdiction; we could not confirm the borough’s specific septic permitting authority, so ask the Building Department to identify that office before designing an on-site system.2

At a glance

Building permits
Required for UCC-regulated construction; apply to the borough1
Zoning approval
Required before building permits1
Septic approval
Health-board certification required for a realty improvement needing septic facilities3
Owner-builder
Personal-use builder-registration exception; building permits still apply4
Occupancy
Certificate of occupancy required for dwellings and commercial buildings5
Private wells
NJDEP drilling permit plus local health approvals6

Who to call

Building permits

Atlantic Highlands Building Department

Borough construction permits, construction inspections and occupancy approvals; starting contact for zoning approval

(732) 291-1444 Ext 3106

[email protected]

100 First Ave. Atlantic Highlands, NJ 07716

Planning & zoning

Atlantic Highlands Planning Board

Borough subdivision and site-plan application intake

732-291-1444 ext 3108

[email protected]

100 First Avenue, Atlantic Highlands, NJ 07716

Health department

Monmouth County Office of Public Health

Septic and well approvals for member municipalities; ask whether Atlantic Highlands is within its septic jurisdiction

732-431-7456 x 8580

[email protected]

Planning & zoning

Monmouth County Division of Planning — Development Review Section

County review of subdivisions and site plans affecting county roads, drainage or county property

732-431-7460

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Borough of Atlantic Highlands means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Borough of Atlantic Highlands, NJ?

Atlantic Highlands requires a construction permit before work regulated by the Uniform Construction Code begins, including construction, enlargement, alteration and demolition.1 New Jersey’s statewide building-code rules exempt ordinary maintenance, including routine repair, from the general construction-permit requirement.7 Ask the borough Building Department to classify the exact work before hiring a contractor.

An Atlantic Highlands owner building a new home for personal use can qualify for the builder-registration exception, but that exception does not remove construction permits, inspections or code compliance.4 An owner-built new home also requires the prescribed owner affidavit before a certificate of occupancy can issue.8

Who issues building permits in Borough of Atlantic Highlands?

The Atlantic Highlands Building Department enforces the State Uniform Construction Code for borough construction.1 Contact the department at (732) 291-1444 Ext 3106 or [email protected]; the office is at 100 First Ave., Atlantic Highlands, NJ 07716.1 Building, electrical, plumbing and fire permit forms are available at Borough Hall.1

Atlantic Highlands requires a property survey showing existing and proposed work for new construction and additions.1 Ask the department for the application package and current fee schedule for your project. Construction-permit and plan-review fees follow municipal fee ordinances under New Jersey’s UCC rules.9

Does Borough of Atlantic Highlands have zoning and setback rules?

Atlantic Highlands requires zoning approval before building permits are obtained; contact the Building Department if you do not know the property’s zone.1 Ask for the parcel’s district, permitted residential use and applicable dimensional schedule before deciding whether a proposed home fits. New Jersey allows municipal zoning ordinances to regulate building height and lot coverage, while exact setbacks depend on the applicable municipal regulations and district.101112

Atlantic Highlands’ development regulations contain minor- and major-subdivision and site-plan procedures and Planning Board review provisions.13 Planning Board applications are accepted at Borough Hall and are not processed until all required documents have been submitted.14

How do septic permits and wells work inside Borough of Atlantic Highlands?

For an Atlantic Highlands realty improvement needing septic facilities, New Jersey requires the board of health having jurisdiction to certify the proposed water supply and sewerage facilities before a building permit issues or construction begins.3 Septic facilities must be inspected and receive permission to be covered before they are concealed.15

Monmouth County’s Office of Public Health oversees septic and well approvals for its member municipalities; that statement does not establish coverage for every borough.16 We could not confirm Atlantic Highlands’ specific septic permitting authority; ask the Building Department and county health office to identify the responsible board of health. A proposed private well requires a NJDEP drilling permit and municipal or county health construction approvals.6

Can you live in an RV or tiny home in Borough of Atlantic Highlands?

We could not confirm whether Atlantic Highlands permits an RV as a dwelling on private land, a tiny home, a manufactured home or an accessory dwelling. Before buying a lot for any of those uses, ask the borough Building Department to identify the zoning official who can give a parcel-specific answer. Atlantic Highlands requires zoning approval before building permits, so construction-code compliance alone does not resolve permission for the proposed use.1

Atlantic Highlands requires certificates of occupancy for dwellings and commercial buildings.5 New Jersey also requires a construction official’s certificate of occupancy before a new building or structure is used or occupied.17 Ask about both the permanent dwelling and any proposed temporary living arrangement during construction.

Building a home in Borough of Atlantic Highlands: what comes first?

  1. Identify the lot’s zoning district with the Building Department and obtain zoning approval before building permits.1
  2. Resolve water and sewage service; when an improvement needs septic facilities, obtain the required health-board certification before the building permit or construction.3
  3. Prepare the survey and proposed drawings for new construction, and ask the Planning Board about any subdivision or site-plan application.113
  4. Secure all required state, county and local approvals before the construction permit issues.18
  5. Obtain the construction permit before starting regulated work, arrange construction inspections and complete final inspections and occupancy approval.119

What stays with Monmouth County when building in Atlantic Highlands?

Monmouth County’s Development Review Section reviews development applications for county Planning Board action on subdivisions and site plans affecting county roads, drainage facilities or county-owned or maintained property.20 County development review is a separate question from Atlantic Highlands’ zoning approval and construction permits.201 Ask the county review office whether the proposed development needs county approval.

The county review office announces new procedural regulations, application forms and a fee schedule effective August 1, 2026; request the current package before applying.20 For land outside the borough, consult the Monmouth County guide; the type and intensity of land use remain controlled by municipal zoning.21

Watch-outs

  • An Atlantic Highlands owner-builder’s registration exception does not waive building permits or inspections.4
  • Do not cover a new septic system before the responsible health board’s inspection and permission.15
  • Monmouth County development-review procedures and fees changed effective August 1, 2026.20

Sources

  1. Atlantic Highlands Building Department (ahnj.com)
  2. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  3. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  4. Construction Code FAQs for New Home Buyers (Borough of Atlantic Highlands), quoted and re-checked
  5. Chapter 128 Certificates of Occupancy and Inspections (Borough of Atlantic Highlands), quoted and re-checked
  6. Bulletin 88-10: Private On-Site Water Supply Systems (New Jersey statewide rule), quoted and re-checked
  7. The New Jersey State Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  8. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  9. New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
  10. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  11. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  12. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  13. Chapter 150 Development Regulations (Borough of Atlantic Highlands), quoted and re-checked
  14. Atlantic Highlands Planning Board (ahnj.com)
  15. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  16. Monmouth County Office of Public Health (co.monmouth.nj.us)
  17. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  18. New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
  19. Construction Code FAQs for New Home Buyers (Borough of Atlantic Highlands), quoted and re-checked
  20. Monmouth County Division of Planning — Development Review Section (co.monmouth.nj.us)
  21. Monmouth County Development Regulations, Volume I, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Atlantic Highlands

Borough of Atlantic Highlands’s own rules

  • Certificate of occupancyRequired

    Dwellings and commercial buildings inside Atlantic Highlands borough.

    • Temporary certificates of occupancy are separately addressed in Chapter 128.
    “§ 128-1 Certificate of occupancy required for dwellings and commercial buildings.”
  • Subdividing landRegulated (with conditions)

    Subdivision and site-plan activity inside Atlantic Highlands borough.

    • Chapter 150 contains separate minor-subdivision and major-subdivision procedures and Planning Board review provisions.
    “§ 150-25 Minor subdivision and minor site plan procedure. § 150-26 Major subdivision and major site plan procedure. § 150-27 Planning Board review.”

Rules another office applies inside Borough of Atlantic Highlands

Borough of Atlantic Highlands does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Owner-builder exemptionAvailable (with conditions)

    A person constructing a new home inside Atlantic Highlands borough for that person's own personal use.

    • The exemption concerns builder registration; construction still must comply with the UCC and permit requirements.
    “The only exception is a person who constructs a new home for his or her own personal use.”
  • InspectionsRequired

    Construction projects inside Atlantic Highlands borough governed by the UCC.

    • Inspections occur periodically at required construction stages; inspectors need not be continuously present.
    “During construction, the code official or inspector conducts regular inspections to ensure that the work performed complies with the UCC.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Atlantic Highlands or Monmouth County directly.

  • Living in an RV — Occupancy of recreational vehicles as dwellings on private land inside Atlantic Highlands borough.
  • Tiny homes — Tiny-home occupancy inside Atlantic Highlands borough.
  • Manufactured homes — Manufactured-home occupancy inside Atlantic Highlands borough.
  • Accessory dwellings — Accessory dwelling units inside Atlantic Highlands borough.
  • Who permits septic — Septic systems inside Atlantic Highlands borough.
7 more unanswered
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Atlantic Highlands publishes no rule on the point, not that none exists. Monmouth County’s page lists the county offices to call.

← All of Monmouth County: county rules, score and offices