Cumberland County, New Jersey
Maurice River Township is a township in Cumberland County, New Jersey. Maurice River Township adopts its own zoning, so inside its limits Maurice River Township’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Cumberland County page.
Construction in Maurice River township: premanufactured accessory structures over 200 square feet, and building subcode fees on new construction and additions under section 11-1.3
building permit flat fee, premanufactured accessory structure over 200 sq ft: 100 USD (plus zoning permit)
“premanufactured accessory structures over 200 square feet require a zoning permit ($25.00) with drawings to determine set back requirements, a building permit with a flat fee of $100.00 and as per current ordinance”
Residential storage buildings over 200 square feet in Maurice River township
certificate of occupancy fee, residential storage building over 200 sq ft: 60 USD (residential storage buildings only)
“residential storage buildings over 200 square feet require a $60.00 co fee”
Land inside Maurice River township limits: the township adopts and administers its own zoning ordinance, Chapter 35 Land Development Regulations, which divides the township into zone districts.
“for the purposes of this chapter, the township of maurice river is divided into the following zone districts:”
Land inside Maurice River township limits: zone district list and district regulations adopted in Chapter 35.
“outside the pinelands area of the township: c conservation c-15 conservation r-5 residential r-10 residential mh mobile home”
Construction permit fees inside Maurice River township under section 11-1.3 as amended by Ordinance 763
building subcode fee, new construction with finished interior: 0.3 USD per cubic foot of volume (minimum fee $100.00) · zoning permit fee, premanufactured accessory structures: 25 USD (structures under 200 sq ft and over 200 sq ft)
“new construction, including additions, with finished interior, the fee shall be $0.30 per cubic foot of volume; provided the minimum fee shall be $100.00.”
Zoning permit step for premanufactured accessory structures inside Maurice River township
“require a zoning permit ($25.00) with drawings to determine set back requirements”
We looked and could not find an official answer yet. Silence is not permission; ask Maurice River Township or Cumberland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Maurice River Township publishes no rule on the point, not that none exists. Cumberland County’s page lists the county offices to call.