Riverside Township is a township in Burlington County, New Jersey. Riverside Township adopts its own zoning, so inside its limits Riverside Township’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Burlington County page.

Answers from the rulebook for Riverside Township

Riverside Township’s own rules

  • Building permitRequired

    Construction work inside Riverside township's limits

    • Work must be permitted; work done without proper permits is a violation and may be penalized.
    • Whether a construction or zoning permit is needed is determined by contacting the construction office.
    • Construction may proceed after the permit is issued; fee schedule not located.
    “any and all work done without the proper permits is a violation of the ucc and the codes of the township of riverside, and, as such, may result in the issuance of penalties.”
  • InspectionsRequired

    Permitted construction inside Riverside township's limits

    • Inspections are by township building, electric, plumbing/mechanical and fire subcode officials on set days and hours.
    • Inspections must be requested at least 48 hours in advance by email to the construction office.

    minimum scheduling notice: >= 48 hours

    “all inspections must be scheduled a minimum of 48 hours in advance.”
  • Local zoningPresent

    Land inside Riverside township's limits: the township administers its own zoning under its Land Use Ordinance (2016) and zoning map, with a township zoning officer issuing zoning approvals

    • The township's zoning page states that zoning approval may be required even if the work does not require a construction permit.
    • The district-by-district dimensional standards in the ordinance were not opened in this research pass.
    “land use ordinance & zoning map land use ordinance 2016 full version (with zoning map)”
  • Permit processPublished (with conditions)

    Construction and zoning permits for work inside Riverside township's limits

    • Contact the construction office first to determine whether a construction or zoning permit is needed.
    • Zoning forms include application for zoning approval, zoning use permit (rental and business), and construction forms including plan review report and application for certificate.
    • Inspections are scheduled at least 48 hours ahead.
    “before you begin any construction project, whether big or small, contact the construction office at 856-461-1460 extension 5”

Rules another office applies inside Riverside Township

Riverside Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted

    Building construction inside Riverside township's limits

    • Adopted through the New Jersey Uniform Construction Code, applied in accordance with the state code and the township's own codes.
    • The eCode360 index lists Chapter 174, Construction Codes, Uniform; its text was not opened.
    “in accordance with the new jersey state uniform construction code (ucc) and/or the codes of the township”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Riverside Township or Burlington County directly.

  • Owner-builder exemption — Owner-builder work inside Riverside township's limits
  • Certificate of occupancy — Certificate of occupancy for buildings inside Riverside township's limits
  • Minimum dwelling size — Single-family residential district inside Riverside township's limits
  • Minimum lot size — Main single-family residential district inside Riverside township's limits
  • Setbacks — Main single-family residential district inside Riverside township's limits
19 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Riverside Township publishes no rule on the point, not that none exists. Burlington County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Riverside Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.