Bolthole Index

Bergen County, New Jersey

Zoning, building permits and septic rules in Borough of Ridgefield, New Jersey

Borough of Ridgefield is a borough in Bergen County, New Jersey. 9 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.

Answers from the rulebook for Borough of Ridgefield

Borough of Ridgefield’s own rules

  • Building code adoptedAdopted

    Construction inside Ridgefield borough under the State Uniform Construction Code administered by the Borough's enforcing agency.

    • The Borough established a State Uniform Construction Code enforcing agency and Department of Building Inspection.
    “There is hereby established in the Borough of Ridgefield a State Uniform Construction Code enforcing agency, to be known as the "Department of Building Inspection,"”
  • Zoning districtsPublished

    Zoning districts inside Ridgefield borough.

    • The published district list includes District A Single-Family Residence, District B Two-Family, District C Multiple-Family, R-TH Townhouse Residential, R-SR and TH Senior Citizens Housing and Townhouse Residential, O-TH Office and Townhouse, District D Retail Business/Commercial/Office, O-LR, O-C, C, O-5-MR, O-7-MR, C-H, OMH, NB, MF, District E, District F, District G, District H, District I and OAR-A.
    “Single-Family Residence Zone - District A Two-Family Zone - District B Multiple-Family Zone - District C R-TH Townhouse Residential Zone R-SR and TH Senior Citizens Housing and Townhouse Residential Zone O-TH Office and Townhouse Zone Retail Business, Commercial or Office Zone - District D O-LR Office Low-Rise Zone O-C Office Commercial Zone C Commercial Zone O-5-MR Office Mid-Rise Zone O-7-MR Office Mid-Rise Zone C-H Commercial and Hotel Zone OMH Office/Mid-Rise Hotel Zone NB Neighborhood Business Zone MF Medium Density Multifamily Zone Light Manufacturing Zone - District E Heavy Manufacturing Zone - District F Public Use Zone - District G Marshland Zone - District H Public Utility Zone - District I A – Overlay Residential One (OAR – A) Zoning District”
  • Building in a floodplainRequired

    Construction or development, including manufactured-home placement, within any Ridgefield borough area of special flood hazard established in § 390-211.

    • A development permit must be obtained before construction or development begins.
    • Applications may require scaled duplicate plans, elevations, floodproofing information, professional certification for nonresidential floodproofing, and watercourse-alteration information.
    • The Zoning Officer or designee administers the article.
    “A development permit (as a form of a zoning permit) shall be obtained before construction or development begins, including placement of manufactured homes, within any area of special flood hazard established in § 390-211.”
  • Short-term rentalsProhibited

    Renting or leasing a dwelling unit for residential occupancy for 30 days or less inside Ridgefield borough.

    • The provision was added September 21, 2016 by Ordinance No. 2310 and incorporates Ordinance No. 2310-2016.

    maximum permitted residential rental period: > 30 days (Renting or leasing for 30 days or less is not a permitted use)

    “Notwithstanding any other contrary provisions as contained in this chapter, the renting or leasing of a dwelling unit for residential occupancy for a period of 30 days or less is not a permitted use by or within the Borough of Ridgefield as more specifically provided in Ordinance No. 2310-2016, as appears in the Ridgefield Code, the terms and provisions of which are incorporated into this provision of the Zoning Ordinance.”
  • Permit feesPublished

    Building permits and related certificates inside Ridgefield borough.

    • The fee section was amended through Ordinance No. 2540 on 2026-06-08.
    • Residential UCC certificates of occupancy are charged $125; nonresidential certificates are 10% of the permit fee.
    • Temporary certificate initial issuance has no fee; subsequent renewals are $50.
    • Plan review is 20% of the permit fee and nonrefundable.

    residential certificate of occupancy fee: 125 USD (New construction or rehabilitation) · nonresidential certificate of occupancy fee: 10 percent of permit fee · plan review fee: 20 percent of permit fee (Nonrefundable) · temporary certificate initial issuance: 0 USD · temporary certificate renewal: 50 USD (Each subsequent renewal)

    “Certificate of occupancy, UCC Residential (new construction or rehabilitation) $125 Nonresidential $10% of permit fee Certificate of Continued Occupancy, UCC, applicant requested $125 Temporary certificate of occupancy Initial issuance No fee Subsequent renewals, each $50 Plan review: none refundable, percentage of permit fee 20%”
  • Permit processPartial

    Construction and flood-hazard development permit administration inside Ridgefield borough.

    • The Department of Building Inspection administers the State Uniform Construction Code.
    • Flood-hazard development permits are obtained before construction or development in special flood-hazard areas.
    • Flood permit applications may require scaled plans, elevations, floodproofing certification and watercourse-alteration information.
    “A development permit (as a form of a zoning permit) shall be obtained before construction or development begins, including placement of manufactured homes, within any area of special flood hazard established in § 390-211.”

Rules another office applies inside Borough of Ridgefield

Borough of Ridgefield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    District A Single-Family Residence Zone inside Ridgefield borough.

    • The source identifies District A as the Single-Family Residence Zone.

    minimum lot size: >= 5000 square feet

    “The following regulations apply to District A: Minimum lot size: 5,000 square feet.”
  • SetbacksSpecified

    District A Single-Family Residence Zone inside Ridgefield borough.

    • Corner lots may use a minimum total side-yard width of seven feet only if a minimum thirteen-foot setback is maintained on any side yard facing a street.
    • Minimum one-side-yard width is seven feet.

    minimum front yard setback: >= 25 feet · minimum total width of side yard: >= 15 feet (Corner lots may have seven feet if a thirteen-foot street-side setback is maintained.) · minimum width of one side yard: >= 7 feet

    “Minimum front yard setback: 25 feet. Minimum total width of side yard: 15 feet. Corner lots shall be permitted a minimum total side yard width of seven feet, so long as a minimum thirteen-foot setback is maintained on any side yard facing a street. Minimum width of one side yard: seven feet.”
  • Building heightSpecified

    District A Single-Family Residence Zone inside Ridgefield borough.

    • Accessory buildings have a separate maximum height.
    • Basement height and roof-height provisions also apply.

    maximum principal building height: <= 32 feet (Two and one-half stories maximum) · maximum accessory building height: <= 15 feet

    “Maximum height of buildings: two and one-half (2 1/2) stories, but not to exceed 32 feet. Maximum height of accessory buildings: 15 feet.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Ridgefield or Bergen County directly.

  • Building permit — General building-permit requirement for construction inside Ridgefield borough.
  • Owner-builder exemption — Owner-builder exemption inside Ridgefield borough.
  • Inspections — Building inspections inside Ridgefield borough.
  • Minimum dwelling size — Minimum dwelling size in Ridgefield borough residential districts.
  • Living in an RV — RV occupancy on land inside Ridgefield borough.
11 more unanswered
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Ridgefield publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Ridgefield means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Bergen County: county rules, score and offices