Bergen County, New Jersey
Borough of Palisades Park is a borough in Bergen County, New Jersey. Borough of Palisades Park adopts its own zoning, so inside its limits Borough of Palisades Park’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.
Construction inside Palisades Park borough under the State Uniform Construction Code administered by the borough's Department of Building Inspection.
“There is hereby established in the Borough of Palisades Park a State Uniform Construction Code enforcing agency, to be known as the "Department of Building Inspection,"”
Any building or area created, erected, changed, converted, altered or enlarged inside Palisades Park borough.
“It shall be unlawful to use or permit the use of any building or area hereafter created, erected, changed, converted, altered or enlarged, wholly or in part, unless and until a certificate of occupancy shall have been applied for and issued by the Building Inspector.”
Land inside Palisades Park borough; Chapter 300 is the borough's zoning ordinance.
“HISTORY: Adopted by the Mayor and Council of the Borough of Palisades Park 9-20-1994 by Ord. No. 1190. Amendments noted where applicable.”
AA Residential District.
minimum front yard: 20-35 feet (Average of existing same-block residences; no less than 20 feet and no more than 35 feet.) · side yard, one: >= 5 feet · side yards, both: >= 14 feet · minimum rear yard: >= 25 feet
“AA 5,000 50 Note 1 5 14 25 2½/25 40 -- [...] Note 1: The setback shall be the average of the existing setback of residences on the same side of the street within the same block, except that the setback in no case need exceed 35 feet nor shall be less than 20 feet.”
A side yard used as access to off-street parking in any district governed by Schedule II Note 3.
minimum driveway width: >= 12 feet (Applies when the side yard is used as access to off-street parking.)
“If such side yard is used as access to off-street parking, such driveway shall not be less than twelve (12) feet in width.”
Construction permits and related subcode permits inside Palisades Park borough.
minimum building fee: 70 USD · residential new/addition fee: 0.04 USD per cubic foot · plan review fee: 20 percent of permit fee (Nonrefundable) · UCC certificate of occupancy: 100 USD
“Minimum Building Fee | $70 Plan review fee (nonrefundable) | 20% of permit fee New/Addition | Residential | $0.040 per cubic foot [...] Certificate of occupancy (UCC) | $100”
Zoning-permit process for development inside Palisades Park borough.
commencement deadline: 6 months from issuance (Permit is void if work is not commenced.) · automatic expiration: 12 months from issuance (Additional six-month renewal may be granted.)
“The permit shall be void and of no force and effect should the person to whom such permit was issued fail or neglect to commence building or improvement within a period of six months from the date of issuance, and provided further that such permit shall automatically expire 12 months from the date of issuance.”
We looked and could not find an official answer yet. Silence is not permission; ask Borough of Palisades Park or Bergen County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Borough of Palisades Park publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Borough of Palisades Park means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.