Zoning, building permits and septic rules in Borough of Oradell, New Jersey

Borough of Oradell is a borough in Bergen County, New Jersey. Borough of Oradell adopts its own zoning, so inside its limits Borough of Oradell’s rules apply, not the county’s. 16 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.

Answers from the rulebook for Borough of Oradell

Borough of Oradell’s own rules

  • Building permitRequired

    Construction-related building projects inside Oradell borough.

    • All applicable prior approvals must be obtained before applying for a building permit.
    • A zoning review/permit application is listed as a construction-permit requirement.
    • Permit issuance is subject to the applicable construction codes and approvals.
    “The Building Department, which is located on the first floor in Room 102 of Borough Hall, is responsible for the approval and processing of construction-related permit applications and the issuance of the required permits for building projects.”
  • Owner-builder exemptionConditional

    An owner performing construction work personally inside Oradell borough.

    • The construction requirements document calls for a Certificate in Lieu of Oath when the owner performs the work.
    • The cited document does not define the full scope of exemption or identify work that remains permit-required.
    “If work is for a single-family, owner occupied residence, the owners may perform their own electrical and/or plumbing work.”
  • InspectionsRequired

    Permitted building projects inside Oradell borough.

    • Inspection types vary by project and applicable subcode area.
    • The official procedure lists footings, foundation/backfill, slab, rough, framing, insulation, final subcode inspections, and engineering inspection if applicable.
    “Required inspections may include: Footings (prior to pouring concrete), foundation/backfill, interior slab, rough inspections (electric, plumbing) framing, insulation, and final inspections for each applicable subcode area (electric, fire, plumbing, and then building) and engineering, if applicable.”
  • Certificate of occupancyRequired

    Projects requiring final inspections inside Oradell borough.

    • All final inspections must be performed and approved before applying.
    • The application is obtained from the Construction Office and the certificate is mailed to the applicant.
    “You shall not occupy the structure (under the permit) until you have obtained a Certificate of Occupancy or Approval.”
  • Local zoningPresent

    Land inside Oradell borough; the borough establishes and applies its own zoning districts and regulations.

    • The zoning map is adopted by reference and is on file in the Borough offices.
    • Uses and structures must conform to the regulations of the applicable zone.
    “For the purpose of this chapter, the following zones are hereby created, and the following regulations governing the height, number of buildings and size of buildings and other structures, their construction, reconstruction, alteration or repair, the percentage of lot that may be occupied, the size of yards, courts and other open spaces, the density of population and the location, use and extent of use of buildings, structures and lands for trade, commerce, residence and other purposes are hereby approved and shall hereafter apply in the Borough of Oradell.”
  • Zoning districtsPublished

    Zoning districts inside Oradell borough.

    • The zoning map is adopted by reference; the code states that the map is on file in Borough offices.
    • The chapter lists 13 zones, including R-1 through R-5, A-1, business districts, CR, MX, AHO, AH-1, AH-2, and R-2A.
    “For the purposes of this chapter, the Borough of Oradell is divided into 13 zones, which are as follows:”
  • Building heightSpecified

    Buildings inside Oradell borough, except CR, B-1, and B-2 districts and subject to the stated slope and facade exceptions.

    • Maximum facade height including parapet may not exceed 40 feet.
    • For one- and two-family residences where slope exceeds two feet for each 10 feet, building height is limited to 31 feet.
    • B-2 has a special possible 40-foot, three-story rule under the stated curb-elevation condition.
    • Height is calculated using the ordinance methods and existing or historic grade, whichever gives the greatest height.
    • CR is excepted from the general 32-foot rule.

    maximum building height: <= 32 feet (except CR and B-1/B-2 and as otherwise provided) · maximum facade height including parapet: <= 40 feet · sloped one- or two-family residence maximum height: <= 31 feet (slope exceeds two feet for each 10 feet)

    “Except in a CR Zone and as set forth in Subsection C below, the maximum height of buildings in all districts within the Borough of Oradell, except in B-1 and B-2, shall be 32 feet.”
  • Living in an RVLimited

    Outdoor parking and potential occupancy-related use of recreational vehicles on property inside Oradell borough.

    • Only vehicles registered to the building occupant may be parked as permitted.
    • No recreational vehicle may be parked outside from 7:00 p.m. to 7:00 a.m. unless it is behind the building and at least 10 feet from the building and each side or rear lot line.
    • Corner lots must maintain the applicable front-yard clearance.
    • A recreational vehicle parking permit from the Construction Code Official is required.
    • The permit expires upon transfer of ownership of the recreational vehicle.

    building setback: >= 10 feet (distance from building) · side or rear lot-line setback: >= 10 feet (distance from each side or rear lot line) · overnight period: 7:00 p.m. to 7:00 a.m.

    “No recreational vehicle shall be occupied or used for human habitation.”
  • Driveway accessRequired

    Buildings requiring a zoning permit inside Oradell borough.

    • A zoning permit cannot be issued for construction or alteration of a building on a lot without access to a street.
    • Other driveway permits may also be required depending on the project.
    “No zoning permit shall be issued for the construction or alteration of any building upon a lot without access to a street.”
  • Permit feesPublished (with conditions)

    Construction permits inside Oradell borough.

    • Construction fees are paid before permit issuance.
    • Unlisted items are calculated under N.J.A.C. 5:23-4.20.
    • Minimum fee is $85 for Use Groups R-3 and R-5 and $125 for all other use groups, per subcode; fees are rounded up to the nearest dollar.

    minimum construction fee for R-3 and R-5: >= 85 USD per subcode · minimum construction fee for other use groups: >= 125 USD per subcode

    “The fee for a construction permit shall be the sum of the subcode fees listed hereafter and shall be paid before the permit is issued.”
  • Permit processPublished (with conditions)

    Building and zoning permit processing inside Oradell borough.

    • All prior approvals are required before applying for a building permit.
    • Completed building permit applications have a 20-business-day processing period.
    • Completed zoning applications have a 10-business-day review period.
    • After approval, the applicant is called with permit costs and may pick up permits during the stated office hours.
    • Required inspections must be requested with permit number, block and lot number, address, and owner name.

    building permit processing period: 20 business days (completed application) · zoning application review period: 10 business days (completed application)

    “The building department has 20 business days to process a completed building permit application. There is a 10-business day review period for completed zoning applications.”

Rules another office applies inside Borough of Oradell

Borough of Oradell does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Building construction inside Oradell borough is inspected for compliance with the State Uniform Construction Code Regulations.

    • The Borough Building Department administers construction permits and inspections locally.
    • The cited municipal page does not state an adoption date.
    “The Building Department performs the subsequent inspections of permitted building projects to insure compliance with the State Uniform Construction Code Regulations and with the approved plans.”
  • Minimum dwelling sizeSpecified

    Dwelling units in the AHO Affordable Housing Overlay District inside Oradell borough.

    • The minimum is calculated as 500 square feet plus 150 square feet for each habitable room exclusive of living room, dining room or dinette, kitchen, and bathrooms.
    • The cited rule applies to the AHO overlay development standards.

    base minimum floor area: 500 square feet (plus 150 square feet for each qualifying habitable room)

    “Minimum floor area. Each dwelling unit shall have a minimum floor area of 500 square feet plus 150 square feet for each habitable room exclusive of living room, dining room or dinette, kitchen and bathrooms.”
  • Minimum lot sizeSpecified

    R-2 One-Family Residential Zone inside Oradell borough.

    • The ordinance also specifies a minimum lot width of 100 feet.

    minimum lot area: >= 12000 square feet · minimum lot width: >= 100 feet

    “The minimum lot dimensions are as follows: Total area: 12,000 square feet. Width: 100 feet.”
  • SetbacksSpecified

    Principal buildings in the R-2 One-Family Residential Zone inside Oradell borough.

    • Rear setback is 25 feet or 25% of property depth, whichever is greater.
    • Minimum side yard is 15 feet and minimum total of both side yards is 35 feet.

    front setback: >= 30 feet · rear setback: 25 feet or 25% of property depth, whichever is greater · minimum side setback: >= 15 feet · combined side setbacks: >= 35 feet

    “The minimum yard requirements of a principal building are as follows: Front yard setback: 30 feet. Rear yard setbacks: 25 feet or 25% of the property depth, whichever is greater. Side yard setback. The minimum side yard shall be 15 feet; the minimum total of both side yards shall be 35 feet.”
  • Lot coverageSpecified

    R-2 One-Family Residential Zone inside Oradell borough.

    • Maximum lot coverage includes buildings and impervious material but excludes the water surface area of a swimming pool or pond.
    • Maximum building coverage is separately limited to 25%.

    maximum building coverage: <= 25 percent of total lot area · maximum lot coverage: <= 40 percent of total lot area (excluding water surface area of any swimming pool or pond)

    “Maximum building coverage: 25% of the total lot area. Maximum lot coverage, including buildings and impervious material, but excluding the water surface area of any swimming pool or pond: 40% of the total lot area.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Oradell or Bergen County directly.

  • Camping on your land — Temporary camping on land inside Oradell borough.
  • Tiny homes — Tiny-home occupancy inside Oradell borough.
  • Manufactured homes — Manufactured-home occupancy inside Oradell borough.
  • Accessory dwellings — Accessory dwelling units inside Oradell borough.
  • Who permits septic — Septic regulation inside Oradell borough.
9 more unanswered
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Oradell publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Oradell means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Bergen County: county rules, score and offices