Bergen County, New Jersey
Borough of Oradell is a borough in Bergen County, New Jersey. Borough of Oradell adopts its own zoning, so inside its limits Borough of Oradell’s rules apply, not the county’s. 16 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.
Construction-related building projects inside Oradell borough.
“The Building Department, which is located on the first floor in Room 102 of Borough Hall, is responsible for the approval and processing of construction-related permit applications and the issuance of the required permits for building projects.”
An owner performing construction work personally inside Oradell borough.
“If work is for a single-family, owner occupied residence, the owners may perform their own electrical and/or plumbing work.”
Permitted building projects inside Oradell borough.
“Required inspections may include: Footings (prior to pouring concrete), foundation/backfill, interior slab, rough inspections (electric, plumbing) framing, insulation, and final inspections for each applicable subcode area (electric, fire, plumbing, and then building) and engineering, if applicable.”
Projects requiring final inspections inside Oradell borough.
“You shall not occupy the structure (under the permit) until you have obtained a Certificate of Occupancy or Approval.”
Land inside Oradell borough; the borough establishes and applies its own zoning districts and regulations.
“For the purpose of this chapter, the following zones are hereby created, and the following regulations governing the height, number of buildings and size of buildings and other structures, their construction, reconstruction, alteration or repair, the percentage of lot that may be occupied, the size of yards, courts and other open spaces, the density of population and the location, use and extent of use of buildings, structures and lands for trade, commerce, residence and other purposes are hereby approved and shall hereafter apply in the Borough of Oradell.”
Zoning districts inside Oradell borough.
“For the purposes of this chapter, the Borough of Oradell is divided into 13 zones, which are as follows:”
Buildings inside Oradell borough, except CR, B-1, and B-2 districts and subject to the stated slope and facade exceptions.
maximum building height: <= 32 feet (except CR and B-1/B-2 and as otherwise provided) · maximum facade height including parapet: <= 40 feet · sloped one- or two-family residence maximum height: <= 31 feet (slope exceeds two feet for each 10 feet)
“Except in a CR Zone and as set forth in Subsection C below, the maximum height of buildings in all districts within the Borough of Oradell, except in B-1 and B-2, shall be 32 feet.”
Outdoor parking and potential occupancy-related use of recreational vehicles on property inside Oradell borough.
building setback: >= 10 feet (distance from building) · side or rear lot-line setback: >= 10 feet (distance from each side or rear lot line) · overnight period: 7:00 p.m. to 7:00 a.m.
“No recreational vehicle shall be occupied or used for human habitation.”
Buildings requiring a zoning permit inside Oradell borough.
“No zoning permit shall be issued for the construction or alteration of any building upon a lot without access to a street.”
Construction permits inside Oradell borough.
minimum construction fee for R-3 and R-5: >= 85 USD per subcode · minimum construction fee for other use groups: >= 125 USD per subcode
“The fee for a construction permit shall be the sum of the subcode fees listed hereafter and shall be paid before the permit is issued.”
Building and zoning permit processing inside Oradell borough.
building permit processing period: 20 business days (completed application) · zoning application review period: 10 business days (completed application)
“The building department has 20 business days to process a completed building permit application. There is a 10-business day review period for completed zoning applications.”
Borough of Oradell does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building construction inside Oradell borough is inspected for compliance with the State Uniform Construction Code Regulations.
“The Building Department performs the subsequent inspections of permitted building projects to insure compliance with the State Uniform Construction Code Regulations and with the approved plans.”
Dwelling units in the AHO Affordable Housing Overlay District inside Oradell borough.
base minimum floor area: 500 square feet (plus 150 square feet for each qualifying habitable room)
“Minimum floor area. Each dwelling unit shall have a minimum floor area of 500 square feet plus 150 square feet for each habitable room exclusive of living room, dining room or dinette, kitchen and bathrooms.”
R-2 One-Family Residential Zone inside Oradell borough.
minimum lot area: >= 12000 square feet · minimum lot width: >= 100 feet
“The minimum lot dimensions are as follows: Total area: 12,000 square feet. Width: 100 feet.”
Principal buildings in the R-2 One-Family Residential Zone inside Oradell borough.
front setback: >= 30 feet · rear setback: 25 feet or 25% of property depth, whichever is greater · minimum side setback: >= 15 feet · combined side setbacks: >= 35 feet
“The minimum yard requirements of a principal building are as follows: Front yard setback: 30 feet. Rear yard setbacks: 25 feet or 25% of the property depth, whichever is greater. Side yard setback. The minimum side yard shall be 15 feet; the minimum total of both side yards shall be 35 feet.”
R-2 One-Family Residential Zone inside Oradell borough.
maximum building coverage: <= 25 percent of total lot area · maximum lot coverage: <= 40 percent of total lot area (excluding water surface area of any swimming pool or pond)
“Maximum building coverage: 25% of the total lot area. Maximum lot coverage, including buildings and impervious material, but excluding the water surface area of any swimming pool or pond: 40% of the total lot area.”
We looked and could not find an official answer yet. Silence is not permission; ask Borough of Oradell or Bergen County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Borough of Oradell publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Borough of Oradell means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.