Bergen County, New Jersey
Borough of Oakland is a borough in Bergen County, New Jersey. Borough of Oakland adopts its own zoning, so inside its limits Borough of Oakland’s rules apply, not the county’s. Septic permits inside Borough of Oakland come from Borough of Oakland. 15 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.
Buildings and land uses controlled by Oakland Borough's land-use chapter.
“No building shall hereafter be erected, constructed, reconstructed, moved, extended, converted, modified, altered or demolished, nor shall any land be used for any non-building use controlled by the within chapter, unless in conformity with all the regulations herein specified for the district in which it is located, and furthermore, the owner, his agent or contractor shall first obtain a zoning permit from the Zoning Enforcement Official.”
Buildings and structures in Oakland flood-hazard areas authorized by permit.
“The Construction Official shall make or cause to be made, inspections for buildings and structures in flood hazard areas authorized by permit in accordance with the Uniform Construction Code, N.J.A.C. 5:23.”
Land inside Oakland Borough.
“This Article is intended to regulate the use of land within zoning districts, secure safety from fire, panic and other dangers, provide adequate light and air, promote orderly development, avoid undue concentration of population, prevent the overcrowding of lands or buildings, establish standards of development, limit congestion in the street, prohibit incompatible uses, regulate the alteration of existing buildings, protect against hazards, conserve the value of land, preserve open space and natural features and encourage the inclusion of aesthetics, amenities of living and a balance of public services.”
Land inside Oakland Borough.
“the Borough of Oakland, in the County of Bergen, is hereby divided into the following classes of zones, in accordance with the Zoning Map hereinafter adopted and referred to in § 59-46B here:”
Development in Oakland zoning districts governed by Schedule A.
“Yards; Area; Height. See Schedule A, Limiting Lot and Yard Sizes and Bulk Principal Building and Use.”
Residential zoning districts inside Oakland Borough.
front-yard minimum in specified short blocks: >= 30 feet (Blocks having less than 1,000 feet in frontage, subject to § 59-60A(3).)
“In any residential zone, a front yard is required on every lot which shall be at all points of a depth of not less than as specified in Schedule A: Limiting Lot and Yard Sizes and Bulk Principal Building and Use; provided, however, that where the existing front yards observed by the buildings within the same block are of a greater or lesser depth than specified in Schedule A: Limiting Lot and Yard Sizes and Bulk Principal Building and Use, the front yard shall be at least equal in depth to the average depth of such existing front yard within the same block, but in no case shall the depth of the front yard be less than 30 feet in blocks having less than 1,000 feet in frontage, subject to the provisions of § 59-60A(3).”
Development in Oakland zoning districts governed by Schedule A.
“Yards; Area; Height. See Schedule A, Limiting Lot and Yard Sizes and Bulk Principal Building and Use.”
Construction or alteration of individual subsurface sewage disposal systems inside Oakland Borough.
new-system permit fee: 525 USD · alteration permit fee: 350 USD
“The fee for a permit to construct a new individual subsurface sewage disposal system shall be $525. The fee for a permit to alter an existing individual subsurface sewage disposal system shall be $350. The permit to construct or alter any septic system which includes an alternative waste treatment unit shall require the payment of an additional fee of $100 for the monitoring by the Board of Health of the maintenance of service contracts thereon.”
Individual sewage-disposal systems requiring reinspection inside Oakland Borough.
reinspection fee: 100 USD per hour or portion thereof
“The fee for each reinspection of an individual sewage disposal system, or part thereof, caused by the failure of the permittee to locate, construct, alter, renovate, repair or extend the same in accordance with the requirements of the permit or any written order of a duly authorized agent of the Board of Health shall be $100 for each hour or portion thereof which may be spent at the site by the Board of Health or its designated representative.”
Subdivision of occupied lots inside Oakland Borough.
“Subdivision of occupied lots. Where a lot is formed from part of a lot already occupied by a building, such separation shall be effected in such a manner as not to violate any of the requirements of this chapter with respect to the existing building and all yards and other open spaces required therefor, and no permit shall be issued for the election of a building on the new lot thus formed unless the subdivision complies with all the provisions of all ordinances of the Borough of Oakland.”
Development in any Oakland flood-hazard area.
“Any development in any flood hazard area that is being performed without an issued permit or that is in conflict with an issued permit shall be deemed a violation.”
Individual sewage-disposal permits inside Oakland Borough.
new-system septic permit fee: 525 USD · alteration septic permit fee: 350 USD
“The fee for a permit to construct a new individual subsurface sewage disposal system shall be $525. The fee for a permit to alter an existing individual subsurface sewage disposal system shall be $350.”
Zoning-controlled building work and land uses inside Oakland Borough.
“No building shall hereafter be erected, constructed, reconstructed, moved, extended, converted, modified, altered or demolished, nor shall any land be used for any non-building use controlled by the within chapter, unless in conformity with all the regulations herein specified for the district in which it is located, and furthermore, the owner, his agent or contractor shall first obtain a zoning permit from the Zoning Enforcement Official.”
Borough of Oakland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Dwellings in Oakland residential zones.
“Compliance to schedule required. In a residential zone, no dwelling shall hereafter be erected unless it complies with the minimum floor area requirements set forth in Schedule D: Minimum Livable Floor Area in Residential Zones, which is hereby made a part of this chapter, fixing the minimum floor areas of residential buildings.”
We looked and could not find an official answer yet. Silence is not permission; ask Borough of Oakland or Bergen County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Borough of Oakland publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Borough of Oakland means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.