Zoning, building permits and septic rules in Borough of Harrington Park, New Jersey
Borough of Harrington Park is a borough in Bergen County, New Jersey. 7 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.
Answers from the rulebook for Borough of Harrington Park
Borough of Harrington Park’s own rules
Building code adoptedAdopted (with conditions)
Construction inside Harrington Park borough under the New Jersey Uniform Construction Code administered by the borough Construction Department.
The ordinance establishes the local enforcement agency; the substantive construction standards are the State Uniform Construction Code and its regulations.
“a State Uniform Construction Code enforcement agency”
Certificate of occupancyLimited
Commercial or industrial premises inside Harrington Park borough that are sold, re-let, re-rented, or thereafter occupied by a new owner, tenant, or subtenant.
The quoted rule applies to commercial or industrial premises, including nonconforming uses.
An application must be submitted to the Construction Code Official.
The official reviews the application with the Fire Protection Subcode Official, Health Officer, and other subcode officials as necessary.
“no commercial or industrial premises [...] shall be sold, re-let or re-rented and thereafter occupied [...] without [...] a certificate of continued occupancy.”
Zoning districtsPublished
Zoning districts and zoning-map administration inside Harrington Park borough.
The zoning chapter contains an article titled Zoning Districts; Zoning Map and a section designating districts and the zoning map.
“Article II Zoning Districts; Zoning Map § 350-4 Designation of districts; Zoning Map.”
Subdividing landRegulated (with conditions)
Subdivision and site-plan activity inside Harrington Park borough.
The chapter separately identifies approval requirements for subdivisions and site plans.
Detailed procedures, standards, and fees are contained in Chapter 303.
“Article II Approval Required § 303-7 Subdivisions.”
Building in a floodplainRequired
Development in designated flood-hazard areas inside Harrington Park borough.
Chapter 179 contains a dedicated permits article and a section titled permits required.
Applicability depends on whether the property is within a regulated flood-hazard area; the numeric flood-zone conditions were not extracted.
Construction-code permit fees for work inside Harrington Park borough.
The current fee schedule is maintained at the Borough Clerk's office and on the borough website.
No fee amount was stated in the opened code text.
“The current fee schedule is available [...] on the Borough's website”
Permit processPartial
Uniform Construction Code business and administration inside Harrington Park borough.
The borough may establish written day-to-day office procedures, but those procedures must comply with the Uniform Construction Code and related regulations.
The public generally has the right to conduct Uniform Construction Code business at one location in the borough, subject to emergencies or unforeseen or unavoidable circumstances.
“Irrespective of any dispersal of personnel as mentioned above, the public shall have the right, unless in the case of emergencies or unforeseen or unavoidable circumstances, to do business with respect to the Uniform Construction Code at one location in the Borough of Harrington Park.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Borough of Harrington Park or Bergen County directly.
Building permit — Building permits for land inside Harrington Park borough.
Owner-builder exemption — Owner-builders undertaking construction inside Harrington Park borough.
Inspections — Building inspections for land inside Harrington Park borough.
Minimum dwelling size — Minimum dwelling size in Harrington Park borough zoning districts.
Minimum lot size — Minimum lot size in Harrington Park borough zoning districts.
17 more unanswered
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Driveway access
Short-term rentals
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Borough of Harrington Park publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Borough of Harrington Park means bringing your own water and power. The kit we’d start with: