Bergen County, New Jersey
Garfield is a city in Bergen County, New Jersey. Garfield adopts its own zoning, so inside its limits Garfield’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.
Construction, erection, or alteration of buildings and specified land or building uses inside Garfield city.
construction cost threshold: > 100 USD (The code states construction or alteration costing more than $100.)
“prior to any construction, alteration, occupancy or use”
Building-code and dwelling inspections inside Garfield city.
recent inspection exception period: <= 11 months (The prior dwelling inspection must have been conducted within 11 months of the new occupancy and/or sale.)
“an inspection of the dwelling unit shall be required upon any change of occupancy”
Initial and continued occupancy and use of buildings or land inside Garfield city.
commencement deadline: 6 months (A longer period may be authorized in writing because of unforeseen conditions; an extension beyond 90 days requires Board of Adjustment approval.)
“required for both initial and continued occupancy and use”
Zoning administered inside Garfield city.
“HISTORY: Adopted by the City Council of the City of Garfield 12-20-1960 by Ord. No. 1266 (Ch. 247 of the 1979 Code). Amendments noted where applicable.”
Garfield zoning and building permit process.
zoning permit decision period: 10 days (Measured after receipt of the application.)
“Every application for a building permit shall be made in writing by the owner, his authorized agent or contractor and shall include a statement of the use or intended use of the structure or vacant land and shall be accompanied by a plan, drawn to scale, showing the proposed structure or use in its exact relation to lot and street lines. The Zoning Officer/Building Inspector shall grant or refuse a zoning permit within 10 days after receipt of the application. If the Zoning Officer/Building Inspector refuses to issue a permit hereunder, he shall state in writing the grounds of his refusal.”
Garfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential districts including R-1A and R-1 inside Garfield city; setbacks are controlled by the adopted district schedule.
“The regulations listed in said schedule for each district are hereby adopted and prescribed for such district and, unless otherwise indicated, shall be deemed to be the minimum requirements in every instance of their application, except as modified by the following special provisions: [...] Development near railroads. In the event that any side or rear yard of any residential premises within any zone is adjacent to an operating railroad right-of-way or siding or spur which provides railroad services within any twelve-month period at any one occasion, then and in that event the minimum yard dimensions of such side or rear yard shall be double the minimum yard dimensions required but not less than 25 feet as measured from the closest rail.”
We looked and could not find an official answer yet. Silence is not permission; ask Garfield or Bergen County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Garfield publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Garfield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.