Borough of Fairview is a borough in Bergen County, New Jersey. Borough of Fairview adopts its own zoning, so inside its limits Borough of Fairview’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.

Answers from the rulebook for Borough of Fairview

Borough of Fairview’s own rules

  • Certificate of occupancyRequired

    Occupancy, rental, lease, sale-related occupancy, or changed use of dwellings and structures inside Fairview borough.

    • The code provides exemptions for transfers between immediate family members and purchases specifically for demolition.
    • A temporary certificate may be issued for minor violations that are remedied within 45 days; it is unavailable when substantial violations exist.

    temporary certificate correction period: 45 days (minor violations only)

    “shall first obtain from the Borough of Fairview an occupancy permit”
  • Local zoningPresent

    Land inside Fairview borough; the Borough adopts and administers its own zoning districts and zoning map.

    • The zoning map is incorporated into Chapter 25 as Appendix C.
    “For the purpose of this chapter, the Borough of Fairview is hereby divided into 10 zone districts as follows: R-A | Low Density Single Family Residential District R-B | Moderate Density One and Two Family District R-C | Medium Density Three to Six Family District R-D | Medium Density Garden Apartment District R-E | Senior Housing R-F | High Density High Rise Residential District B | General Business B-1 | Central Business District B-2 | Business Residential I | Industry”
  • Zoning districtsPublished

    Zoning districts and district classifications inside Fairview borough.

    • The zoning map is incorporated into Chapter 25 Appendix C; district dimensional and use schedules are in Appendix D.
    “The location and boundaries of the districts are hereby established on the Zoning Map of the Borough of Fairview contained in Appendix C at the end of this chapter. The map or maps and all notations, reference and designations shown thereon shall be, as such, a part of this chapter as if the same were fully described and set forth herein.”
  • Driveway accessLimited

    Residential lots in Fairview borough's R-A and R-B zones.

    • Driveways that do not lead to a garage or carport are prohibited on residential lots in these zones.
    “Driveways that do not lead to a garage or carport on residential lots in the R-A and R-B zones are prohibited.”
  • Short-term rentalsProhibited

    Dwelling-unit rentals for 30 days or less inside Fairview borough.

    • Rentals for more than 30 days are not prohibited by this chapter.

    maximum prohibited rental period: <= 30 days (the chapter states that otherwise lawful occupancy for more than 30 days is not prevented)

    “Notwithstanding anything to the contrary contained in the Borough Code, it shall be unlawful for an owner, lessor, sublessor, any other person(s) or entity(ies) with possessory or use right(s) in a dwelling unit, their principals, partner or shareholders, or their agents, employees, representatives and other person(s) or entity(ies), acting in concert or a combination thereof, to receive or obtain actual or anticipated consideration for soliciting, advertising, offering, and/or permitting, allowing, or failing to discontinue the use or occupancy of any dwelling unit, as defined herein, for a period of 30 days or less.”
  • Permit feesPublished

    Construction permits and certificates of occupancy inside Fairview borough.

    • Fees are paid before issuance.
    • The Construction Official may require an escrow fee of up to $5,000 for Borough Engineer review of an application and plans.

    new construction fee: 0.025 USD per cubic foot of volume · renovation/alteration/repair fee: 25 USD per $1,000 estimated cost · minimum construction permit fee: 75 USD · one- or two-family residential certificate of occupancy fee: 75 USD · maximum possible Borough Engineer escrow: <= 5000 USD (application and plans review)

    “New construction (per cubic foot of volume) | $0.025”
  • Permit processPartial

    Zoning and construction-permit administration inside Fairview borough.

    • A zoning permit is required before specified uses, changes, construction, alteration, conversion, relocation, or installation.
    • The Zoning Officer generally issues or denies within seven days, unless site-plan approval is required.
    • Construction-permit fees must be paid before issuance.

    zoning permit decision period: 7 days (site-plan approval may extend timing)

    “Prior to the commencement of a use, change of use or change of occupancy, and prior to the erection, construction, reconstruction, alteration, conversion, relocation or installation of a building or structure, a zoning permit shall be obtained from the administrative officer.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Fairview or Bergen County directly.

  • Building permit — Building permit requirement for new residential construction inside Fairview borough.
  • Owner-builder exemption — Owner-builder exemption from construction permitting inside Fairview borough.
  • Inspections — Building inspections for construction inside Fairview borough.
  • Minimum dwelling size — Minimum dwelling size in Fairview borough residential districts.
  • Living in an RV — RV occupancy on land inside Fairview borough.
13 more unanswered
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Fairview publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Fairview means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Bergen County: county rules, score and offices