Zoning, building permits and septic rules in Englewood, New Jersey

Englewood is a city in Bergen County, New Jersey. 7 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.

Answers from the rulebook for Englewood

Englewood’s own rules

  • Building code adoptedAdopted

    Construction inside Englewood city.

    • The local enforcement agency administers the State Uniform Construction Code.
    • The City may retain a private on-site inspection or plan-review agency for a subcode.
    “There is hereby established in the City of Englewood a State Uniform Construction Code enforcement agency, to be known as the "Building Department,"”
  • Zoning districtsPublished

    Land inside Englewood city.

    • The zoning map is dated February 1, 2001 and last revised February 18, 2009, according to the code text.
    • The district list includes multiple one-family, multiple-residence, business, industrial, overlay, and redevelopment districts.
    “The City of Englewood is hereby divided into the following districts:”
  • Septic permitLimited

    Construction or installation of septic systems inside Englewood city.

    • Construction or installation is prohibited, so no ordinary septic-construction permit pathway was identified.
    “No person shall construct or install a cesspool, septic tank or privy in the City of Englewood.”
  • Off-grid sanitationProhibited

    New septic, cesspool, or privy sanitation systems inside Englewood city.

    “No person shall construct or install a cesspool, septic tank or privy in the City of Englewood.”
  • Mandatory utility hookupSewer (with conditions)

    Any building inside Englewood city when the public sewer is available and a connection can be made within 100 feet of the property boundary.

    • The owner pays the expense.
    • The owner must connect and discontinue private wastewater disposal within 90 days after receiving a City Engineer directive.
    • A connection permit is separately required by the sewer chapter.

    connection-distance: <= 100 feet (from the property boundary) · compliance-period: 90 days (from receipt of City Engineer directive)

    “The owner of any building shall, at his own expense, connect such building to the public sewer and discontinue use of any private wastewater disposal system within 90 days from his receipt of a directive from the City Engineer directing him to do so and stating that such public sewer is available and that a connection thereto can be made at a point not more than 100 feet distant from the boundary line of the property on which such building is located.”
  • Subdividing landRegulated (with conditions)

    Subdivision applications inside Englewood city.

    • Approval is administered by the Englewood Planning Board or Board of Adjustment when it has jurisdiction.
    • A subdivision application must also be filed with the Bergen County Planning Board for approval or waiver.
    “Concurrently with filing an application with the Englewood Board, a subdivision application shall be filed with the Bergen County Planning Board for either county subdivision approval or a waiver therefrom.”
  • Permit processPublished (with conditions)

    Applications for construction permits and certificates of occupancy inside Englewood city.

    • The Central Permit Office operates under the Construction Official.
    • The office receives applications, issues notices and orders, collects fees, and performs other functions assigned by the Construction Official.
    • Applications are processed during normal City business hours except emergencies and unforeseen or unavoidable circumstances.
    “The Central Permit Office shall receive all applications for construction permits and certificates of occupancy, issue notices and orders, collect fees, penalties and fines, and perform such other functions as may be determined by the Construction Official. Said office shall be open during normal business hours of the City.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Englewood or Bergen County directly.

  • Building permit — Building work inside Englewood city.
  • Owner-builder exemption — Owner-builders performing construction inside Englewood city.
  • Inspections — Building work inside Englewood city.
  • Minimum dwelling size — Dwellings inside Englewood city.
  • Camping on your land — Temporary camping on private land inside Englewood city.
7 more unanswered
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Englewood publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Englewood means bringing your own water and power. The kit we’d start with: