Borough of Cresskill is a borough in Bergen County, New Jersey. 15 rules below are quoted from official sources and independently re-checked, most recently on October 12, 2026. Rules for unincorporated land are on the Bergen County page.

Answers from the rulebook for Borough of Cresskill

Borough of Cresskill’s own rules

  • Building permitRequired

    Projects inside Cresskill borough that require a construction permit.

    • The Borough page describes projects that require a construction permit; the reviewed source does not enumerate every permit exemption.
    “NOTICE: Projects that require a construction permit are not complete until final inspections are made and a certificate of occupancy/approval is issued.”
  • Building code adoptedAdopted

    Construction inside Cresskill borough is administered through the Borough's State Uniform Construction Code enforcing agency.

    • The agency includes municipal construction and subcode officials.
    • Officials administer additional subcodes adopted as part of the State Uniform Construction Code.
    “There is hereby established in the Borough of Cresskill a State Uniform Construction Code enforcing agency to be known as the "Borough of Cresskill State Uniform Code Construction Agency," consisting of a Construction Official, Building Subcode Official, Plumbing Subcode Official, Electrical Subcode Official, Fire Protection Subcode Official and such other subcode officials for such additional subcodes as the Commissioner of the Department of Community Affairs, State of New Jersey, shall hereafter adopt as part of the State Uniform Construction Code.”
  • InspectionsRequired

    Permitted construction inside Cresskill borough.

    • Final inspections are required before the project is complete.
    • The Borough page lists separate building, fire, plumbing and electrical inspection schedules.
    “Projects that require a construction permit are not complete until final inspections are made and a certificate of occupancy/approval is issued.”
  • Certificate of occupancyRequired

    Buildings erected, renovated or altered inside Cresskill borough and permitted projects requiring a certificate.

    • A building may not be occupied or used in whole or part until the Construction Official issues a certificate of occupancy.
    • The zoning code separately requires a certificate for both initial and continued occupancy and use, and for nonconforming uses.
    “In accordance with nj state law, a building which has been erected, renovated or altered shall not be occupied or used in whole or part until a certificate of occupancy has been issued by the construction official.”
  • Zoning districtsPublished

    Zoning districts and dimensional schedules inside Cresskill borough.

    • The code identifies R-40, R-15 and R-10 One-Family Residence Zones and provides a zoning map and schedule of requirements.
    • Other published districts include P, DU, C, P and L, RA, R-SC, townhouse, PURD, PUD and affordable-housing zones.
    “Article III Zones and Zoning Map [...] § 275-5 Zoning Map and Schedule of Requirements. [...] Article IV R-40, R-15 and R-10 One-Family Residence Zones”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Cresskill borough.

    • The chapter provides approving-agency, classification, application, procedure, plat, improvement and design-standard sections.
    “§ 234-4 Approving agency. [...] § 234-9 Classification of subdivisions. [...] § 234-10 Application form. [...] § 234-12 Procedure charts for major subdivisions.”
  • Building in a floodplainRequired

    Development in flood hazard areas inside Cresskill borough.

    • Chapter 132 was adopted May 7, 2025 by Ordinance 25-09-1665.
    • The chapter has separate permit, site-plan, inspection, subdivision, manufactured-home and recreational-vehicle provisions.
    • The reviewed source does not provide the detailed permit exceptions or thresholds.
    “Article IV Permits [...] § 132-31 Permits required. [...] Article VI Inspections [...] § 132-41 Inspections of development.”
  • Permit feesPublished (with conditions)

    Construction permits and certificates inside Cresskill borough.

    • Construction permit fees are based on the applicable subcode fee schedule.
    • A permit started without prior Borough approval is charged double the permit fee.
    • A certificate of occupancy fee is 10% of the total construction-permit cost with a $100 minimum.
    • Additional and temporary certificate fees are separately listed.

    certificate of occupancy fee: 10 percent of total construction permit cost (Minimum CO fee is $100.) · unpermitted-start surcharge: 2 times permit fee (Applies when a Borough permit was not obtained before work started.)

    “The fee for not obtaining a Borough permit prior to the start of work shall be double the permit fee. [...] Certificate of occupancy (CO) indicating that construction authorized by a construction permit is completed in accordance with the approved plans and the Uniform Construction Code regulations. Prepayment at time of issuing the construction permit is required, and the fee shall be 10% of the total cost of the construction permit, provided that the minimum CO fees shall be $100.”
  • Permit processPublished (with conditions)

    Construction permit administration inside Cresskill borough.

    • The Borough Building Department administers construction-code compliance.
    • Construction permits are valid for one year from issuance and become invalid if work is suspended for six months.
    • Final inspections and a certificate of occupancy or approval are required for permit projects.

    permit validity: 1 year (Permit becomes invalid if work is suspended for six months.)

    “Our function is to insure that all new construction, additions, alterations/renovations conform to the State of New Jersey Uniform Construction Code and the New Jersey approved building codes. NOTICE: Projects that require a construction permit are not complete until final inspections are made and a certificate of occupancy/approval is issued. [...] Construction permits are valid for a period of “one” (1) year from the date of issuance and become invalid if the work is suspended for a period of “six” (6) months.”

Rules another office applies inside Borough of Cresskill

Borough of Cresskill does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum dwelling sizeSpecified

    Single-family dwellings in the R-10 One-Family Residence Zone inside Cresskill borough.

    • The dimensional table applies to one-family residence zones.

    livable floor area per dwelling unit: >= 1000 square feet

    “Livable floor area per dwelling unit | 1,200 square feet | 1,100 square feet | 1,000 square feet”
    2 more reviewed findings on this topic
  • SetbacksSpecified

    Single-family lots in the R-10 One-Family Residence Zone inside Cresskill borough.

    front yard: >= 25 feet · one side yard: >= 15 feet · total side yards: >= 35 feet · rear yard: >= 30 feet

    “Front yard | 50 feet | 40 feet | 25 feet [...] 1 side yard | 30 feet | 15 feet | 15 feet [...] Total, both side yards | 60 feet | 35 feet | 35 feet [...] Rear yard | 75 feet | 50 feet | 30 feet”
    2 more reviewed findings on this topic
    • Specified — Single-family lots in the R-40 One-Family Residence Zone inside Cresskill borough.
      “Front yard | 50 feet | 40 feet | 25 feet [...] 1 side yard | 30 feet | 15 feet | 15 feet [...] Total, both side yards | 60 feet | 35 feet | 35 feet [...] Rear yard | 75 feet | 50 feet | 30 feet”
    • Specified — Single-family lots in the R-15 One-Family Residence Zone inside Cresskill borough.
      “Front yard | 50 feet | 40 feet | 25 feet [...] 1 side yard | 30 feet | 15 feet | 15 feet [...] Total, both side yards | 60 feet | 35 feet | 35 feet [...] Rear yard | 75 feet | 50 feet | 30 feet”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Cresskill or Bergen County directly.

  • Owner-builder exemption — Owner-builder work inside Cresskill borough.
  • Living in an RV — RV occupancy or storage for living purposes inside Cresskill borough.
  • Camping on your land — Temporary camping on private land inside Cresskill borough.
  • Tiny homes — Tiny-home occupancy inside Cresskill borough.
  • Manufactured homes — Manufactured-home occupancy inside Cresskill borough.
8 more unanswered
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Cresskill publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Cresskill means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Bergen County: county rules, score and offices