Rockingham County, New Hampshire
Town of Atkinson is a town in Rockingham County, New Hampshire. Town of Atkinson adopts its own zoning, so inside its limits Town of Atkinson’s rules apply, not the county’s. Septic permits inside Town of Atkinson come from the county and state together. 19 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Rockingham County page.
Construction, alteration, or repairs other than ordinary repairs inside Atkinson town limits.
“Any person, persons, partnership, or corporation shall obtain a permit before beginning construction, alteration, or repairs, other than ordinary repairs, using application forms furnished by the Building Inspector.”
Conventionally constructed buildings inside Atkinson town limits.
“All conventionally constructed buildings shall conform to and comply with the New Hampshire State Building Codes.”
New construction inside Atkinson town limits.
“In new construction the following four inspections shall be made after the work has been completed:”
Land inside Atkinson town limits.
“For the purpose of this Ordinance, the Town of Atkinson is divided into districts as shown on the Zoning Map”
Every building used as a residence inside Atkinson town limits.
minimum ground-floor area: >= 800 square feet (Outside measurement.) · minimum area for each additional story: >= 600 square feet (Cellar excluded.)
“Every building to be used as a residence shall have a minimum ground floor area of eight hundred (800) square feet outside measurement, and a floor area, exclusive of cellar, of six hundred (600) square feet for each additional story.”
Use of a manufactured or mobile home or trailer for temporary residency during rebuilding after fire, flood, or acts of God inside Atkinson town limits.
temporary occupancy permit duration: 2 years (Temporary home or trailer during rebuilding after fire, flood, or acts of God.)
“A two-year occupancy permit for residency in the temporary home or trailer is required and shall be issued by the Building Inspector after all utility connections are determined to be in compliance with electrical and sanitary codes.”
Temporary manufactured/mobile-home occupancy while a residence is rebuilt or while a new residence is under construction inside Atkinson town limits.
new-residence temporary occupancy permit duration: 6 months (May be renewed for a further six months if substantial construction progress is shown.)
“The Board of Selectmen may issue a six-month occupancy permit for residency in a manufactured or mobile home or trailer on property where a new residence is under construction.”
Construction, repair, or alteration of a waste disposal system inside Atkinson town limits.
“No waste disposal system shall be constructed, repaired, or altered within the Town of Atkinson without prior approval of plans and specifications by the Town of Atkinson and the New Hampshire Department of Environmental Services.”
Accessory-dwelling-unit applications inside Atkinson town limits.
“Proof of adequacy shall include a septic inspection by a licensed inspector or submission of the plan on record for the existing system indicating adequacy and proper function.”
Private sewage disposal where public sewer is unavailable inside Atkinson town limits.
minimum replacement holding-tank size: >= 2500 gallons (Only where a holding tank may be permitted as a replacement system.)
“Holding Tanks shall be prohibited in all cases of new building construction and expanded use.”
Dwelling and commercial or public buildings inside Atkinson town limits where public sewer is available.
“All dwelling and all commercial or public buildings shall be connected to the public sewer system when available. When a public system is not available, a private sewage disposal system is required.”
Construction or substantial alteration of a driveway, entrance, exit, or approach in the right-of-way of an Atkinson town highway.
“It shall be unlawful to construct, alter in any way that substantially affects the size or grade of any driveway, entrance, exit, or approach within the limits of the right-of-way of any town highway without a written construction permit or driveway permit”
Town building permits inside Atkinson town limits.
minimum building permit charge: >= 100 USD
“The minimum Building Permit charge is $100.”
Town of Atkinson does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential and non-residential lots in Atkinson's RR2 rural-residential district.
minimum lot area: >= 2 acres (RR2 residential/non-residential table entry, subject to the table's ## soil-condition footnote.)
“## 3 acres required if High Intensity Soils Map designates more than 50% of a two-acre lot as having less than 2 feet depth to seasonal water table”
“a Lot area minimum (acres) 3**/3** 2##/2## 2/2 2/2 1 2/1 2 2/250[9]”
Residential development in Atkinson's RR3 rural-residential district.
minimum front yard: >= 70 feet · minimum rear yard: >= 75 feet · minimum side yard: >= 50 feet (RR3 table contains a 100-foot total/50-foot minimum side-yard notation.)
“d Front yard minimum (ft) 70/70 70/70 50/50 50/50[3] 50[3] 50/50[3] 50[8] [9]”
“e Rear yard minimum (ft) 75[1]/75 75[1]/50 50[1]/50 50[1]/50 25[7] 50[1]/25[4] 25[7] [9]”
Residential buildings in Atkinson's RR2 rural-residential district.
maximum building height: <= 35 feet (Two stories or 35 feet, whichever is less; RR2/SCR alternative design exception applies.)
“In RR2, the SCR Subdistrict permits alternative design residential buildings that shall be no more than 55 feet in height.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Atkinson or Rockingham County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Atkinson publishes no rule on the point, not that none exists. Rockingham County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Atkinson means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.