Grafton County, New Hampshire
Town of Haverhill is a town in Grafton County, New Hampshire. Town of Haverhill adopts its own zoning, so inside its limits Town of Haverhill’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Grafton County page.
Applicants and contractors using Haverhill's building-permit application.
“The Contractor/Builder certifies that he/she is aware of and will comply with the State Building Codes (RSA 155-A:2) as related to the property and proposed use.”
Buildings covered by Life Safety and Fire Codes inside Haverhill town limits.
“The contractor/builder must contact the Town Office at 787-6800 to schedule the necessary inspections. (Applies to buildings covered by Life Safety and Fire Codes)”
New construction, additions, repair or replacement, alteration, demolition, or relocation covered by Life Safety and Fire Codes inside Haverhill town limits.
inspection-request lead time: >= 2 weeks (Town Inspector inspections for certificate of compliance) · certificate fee: 0 USD (failure to comply may result in additional fees)
“A Certificate of Compliance will be issued upon completion of new construction, addition, repair/replacement, alteration, demolition, or relocation.”
Land inside Haverhill town limits subject to the town's existing zoning regulations.
“COMPLIANCE WITH EXISTING ZONING REGULATIONS”
Town-recognized zoning areas identified in the building-permit application.
“WETLAND AND AQUIFER PROTECTION ORDINANCE: Is property within the Aquifer or Wetland District?”
Subdivision of land and boundary-line changes inside Haverhill town limits.
complete application filing lead time: >= 21 days (before scheduled Planning Board public meeting) · Planning Board action period: <= 65 days (after acceptance of complete final application)
“before any permit for the erection of a structure within such proposed subdivision shall be granted, all property transference or construction is prohibited until approval of the proposed subdivision by the planning board.”
Woodsville Fire District applicants inside Haverhill town limits.
“Woodsville Fire District applicants MUST receive driveway approval from the Woodsville Fire District Commissioners.”
A building-permit project located in a Haverhill flood-prone area.
“If yes, applicant will be required to provide flood zone determination, building elevation and certification that construction will conform to the Ordinance.”
Town building-permit applications inside Haverhill town limits.
single- or two-family residence building permit application fee: 25 USD · multi-unit dwelling new-construction base fee: 150 USD (more than two units, plus $75 per dwelling unit)
“The building permit application fee for single- or two-family residences is $25.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Haverhill or Grafton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Haverhill publishes no rule on the point, not that none exists. Grafton County’s page lists the county offices to call.