Grafton County, New Hampshire
Town of Bridgewater is a town in Grafton County, New Hampshire. Town of Bridgewater adopts its own zoning, so inside its limits Town of Bridgewater’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Grafton County page.
Structures over 100 square feet, exterior alterations or additions, pools of any size, and conversions inside Bridgewater town limits.
structure area threshold: > 100 square feet (Permit also required for exterior alterations or additions, pools of any size, and conversions.)
“No structure construction shall be commenced without the issuance of a Building Permit if the structure exceeds one hundred (100) square feet. No alterations or additions to the exterior of the structure shall be commenced without the issuance of a Building Permit. Swimming pools of any size, above or below the ground, require the issuance of a Building Permit. A Building Permit shall be required for conversions.”
Construction and alterations regulated by Bridgewater Building Regulations.
“Periodic inspections of all construction and alterations shall be made by the Building Inspector to see that all appropriate ordinances of the Town are being fulfilled.”
Structures inside Bridgewater town limits.
“No structure shall be occupied until an occupancy permit has been issued by the Building Inspector certifying that all terms of all appropriate ordinances of the Town of Bridgewater have been fulfilled.”
Land inside Bridgewater town limits.
“This ordinance shall be known and may be cited as the "Zoning Ordinance of the Town of Bridgewater."”
Zoning districts inside Bridgewater town limits.
districts: GR General Residential (Lake District and River Road District); RR Mountain District; C Commercial; CI Commercial/Industrial
“The Town of Bridgewater is divided into the following districts as shown on the official Zoning Map: GR - General Residential 1a. Lake District 1b. River Road District RR - Mountain District C - Commercial CI - Commercial/Industrial”
Single-family dwelling units inside Bridgewater town limits.
minimum ground floor area: >= 500 square feet (Does not apply to seasonal property.)
“Every dwelling unit to be used by a single family shall have a minimum ground floor area of five hundred (500) square feet. The foregoing does not apply to seasonal property.”
Mountain District inside Bridgewater town limits.
minimum lot area: >= 5 acres (Subject to stated state-standard, suitable-site, and slope conditions.) · minimum contiguous suitable site: >= 30000 square feet (Must meet current New Hampshire Water Supply and Pollution Control Division standards.)
“lot size: the minimum area of any lot shall be at least five (5) acres, depending on soil and slope conditions, as may be suitable to sustain development according the state standards. each lot shall contain within the required lot size a minimum suitable site of thirty thousand (30,000) contiguous square feet which meets current new hampshire water supply and pollution control division standards.”
“lot size: the minimum area of any lot shall be at least two (2) acres in size, depending on soil and slope conditions, as may be suitable to sustain development according to state standards. wetland soils and slope areas of an incline of greater than fifteen percent (15%) may not be included in the minimum lot size.”
Structures inside Bridgewater town limits.
road/right-of-way setback: >= 35 feet (Measured between any structure and the edge of a public or private highway, street, road, or road right-of-way.) · lot-boundary setback: >= 20 feet (Applies to any lot boundary.) · waterbody setback: >= 50 feet (Applies to lakes, rivers, and listed brooks.)
“shall be a minimum distance of thirty-five (35)’ feet between any structure and the edge of any highway, street, road or road right-of-way whether public or private. no structure shall be located within twenty feet (20') of any boundary of the lot on which it is located. no structure shall exist with in fifty feet (50') of any lake, river, or the following brooks: dick brown, woodman, clay, whittemore, great, fogg, able and tilton.”
General Residential District, including Lake District and River Road District, inside Bridgewater town limits.
maximum building/parking/driveway coverage: <= 30 percent (Includes parking and driveway areas.)
“Lot Coverage: The building coverage on any lot, including parking and driveway areas, shall not exceed thirty percent (30%) of any lot with the open area devoted to landscaping or natural growth.”
“Lot coverage: The building coverage on any lot including parking and driveway shall not exceed percent (15%) of any lot, with the open space area devoted to landscaping or natural growth.”
Mountain District inside Bridgewater town limits.
“a. permitted uses: (1) one and two-family dwelling units. (2) home business. (3) manufactured housing. (4) agricultural uses. (5) accessory buildings and uses.”
Land subdivisions inside Bridgewater town limits.
potential reserved area for qualifying developments: >= 5 percent (Tracts exceeding 20 acres or involving more than 10 lots, as determined by the Board.)
“For the development of tracts of land in excess of twenty (20) acres, or involving in excess of ten (10) individual lots whether planned or completed at one time or in stages, not less than five percent (5%) of the area may be required to be reserved for suitable recreational or other non-residential use or purpose as may be determined by the Board.”
Development subject to Town Site Plan Review inside Bridgewater town limits.
sight-distance measurement point: 10 feet (Measured off edge of pavement at entrance.)
“For on-lot sewage systems: New Hampshire Water Supply and Pollution Control Division approval for construction. 2. Approved driveway permit from State Highway Department and/or the Town of Bridgewater. 3. Sight distance at entrance from ten feet (10') off edge of pavement.”
Proposed development in special flood hazard areas inside Bridgewater town limits.
“ITEM II: PERMIT REQUIRED All proposed development in any such flood hazard areas shall require a permit. ITEM III: PERMIT APPLICATION REVIEW The Building Inspector shall review all building permit applications for new construction or substantial improvements to determine whether proposed building sites will be reasonably safe from flooding.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Bridgewater or Grafton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Bridgewater publishes no rule on the point, not that none exists. Grafton County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Bridgewater means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.