Cheshire County, New Hampshire
Town of Troy is a town in Cheshire County, New Hampshire. Town of Troy adopts its own zoning, so inside its limits Town of Troy’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Cheshire County page.
New construction of homes, additions, garages and barns inside Troy town.
inspection rate: 50 USD per hour (plus mileage at IRS reimbursement rate) · minimum inspections for new construction: >= 4 inspections
“permits for new construction of homes, additions, garages and barns require at least 4 inspections”
Occupancy or use of land or any building erected, altered or moved in Troy town, including any change or extension of use.
fine for violation: <= 100 USD per day
“no land shall be occupied or used and no building hereafter erected or altered or moved shall be occupied or used on whole or part for any purpose until a certificate of occupancy has been issued by the board of selectmen, stating that the land or building complies with all the provisions of these regulations.”
Land inside Troy town limits (Town of Troy zoning districts and dimensional rules); not the unincorporated county area.
“this ordinance shall be known, and may be cited as, the "town of troy zoning ordinance"”
Land inside Troy town limits.
“for the purpose of this ordinance, the town of troy is divided into the following districts, as shown on the official zoning map filed with the town clerk:”
Residential District (Article VI) inside Troy town: one- and two-family dwellings.
minimum lot area: >= 1 acre · minimum contiguous frontage: >= 100 feet
“each lot shall have a minimum area of one (1) acre, with at least one hundred (100) feet of contiguous frontage.”
“each lot shall have a minimum area of two (2) acres, with at least two hundred (200) feet of contiguous frontage.”
Residential District (Article VI) inside Troy town.
front setback from approved right-of-way: >= 35 feet · side and rear setback: >= 20 feet
“no structure or parking area shall be located closer than 35 feet from the edge of an approved right-of-way, nor closer than twenty 20 feet from the side and rear property lines.”
“no structure or parking area shall be located closer than 35 feet from the edge of an approved right-of-way, nor closer than 20 feet from the side and rear property lines.”
Any building or structure inside Troy town, all districts (general provisions, Article III).
maximum building height: <= 3 stories
“no building or structure shall be built to a height of more than three (3) stories.”
Recreational vehicle used as an auxiliary temporary living unit on an occupied residential lot inside Troy town, any district.
maximum auxiliary occupancy period: <= 180 consecutive days per calendar year (requires special permit of the selectmen)
“recreational vehicles may, by special permit of the selectmen, be used as an auxiliary temporary living unit on any occupied residential lot in any district for a period not to exceed 180 consecutive days in a calendar year, provided that adequate sewage disposal and all applicable setback requirements for the district can be met.”
Manufactured housing on individual lots or in parks inside Troy town.
“manufactured housing is permitted in manufactured housing parks or in subdivisions created specifically for manufactured housing in the rural district, subject to the provisions of the troy manufactured housing park ordinance and the troy subdivision and/or site plan review regulations, as applicable; and on individual lots in the rural district.”
Accessory dwelling units on lots where residential uses are allowed inside Troy town.
maximum ADU size: <= 1000 square feet
“accessory dwelling units (adu’s) are permitted by right in all districts where residential uses are allowed, subject to the following:”
Building permits for lots inside Troy town; access is tied to street frontage, not a driveway permit.
“no building permit shall be issued for any building unless the street upon which the lot has actual frontage corresponds with the requirements of rsa 674:41.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Troy or Cheshire County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Troy publishes no rule on the point, not that none exists. Cheshire County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Troy means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.