Carroll County, New Hampshire
Town of Ossipee is a town in Carroll County, New Hampshire. Town of Ossipee adopts its own zoning, so inside its limits Town of Ossipee’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Carroll County page.
Placement, commencement of construction, or modification of structures within the Town of Ossipee.
detached accessory-structure exemption area: <= 120 square feet (Maximum height must be 12 feet.) · fence exemption height: <= 7 feet · permit validity: 1 year (One additional year only may be granted at zoning officer discretion.)
“The issuance of a permit by the Town Authority (Zoning Enforcement Officer or Building Inspector) is required prior to the placement, commencement of construction or modification of any structure within the Town of Ossipee except for detached accessory structures of 120 Sq ft or less, and a maximum height of 12 ft, fences 7ft and under, general repairs that do not involve structural repairs or changes.”
Inspections under the Ossipee Zoning Ordinance within town limits.
“The Board of Selectmen or its Zoning Enforcement Officer shall make inspections, as appropriate to ensure conformity with the provisions of this Ordinance.”
Land within the Town of Ossipee, New Hampshire.
“The Town of Ossipee is divided into multiple Zoning Districts, hereinafter referred to as “Districts”.”
Zoning districts in the Town of Ossipee.
“The Town of Ossipee is divided into multiple Zoning Districts, hereinafter referred to as “Districts”.”
Recreational vehicles on private property that is not a recreational camping park within Ossipee town limits.
season: May 1 to October 31 (One private campsite per parcel.) · permit threshold: > 14 consecutive days (Building Department permit required.)
“One private campsite per parcel of land is allowed from May1 to October 31 each year. [...] If a campsite is occupied or planned to be occupied for more than fourteen (14) consecutive days, the property owner shall obtain a permit from the Building Department [...] No campsite shall be used as a permanent residence.”
Accessory dwelling units where permitted within Ossipee town limits.
maximum ADUs per property: <= 1 ADU · maximum ADU area: <= 1200 square feet · dedicated off-street parking: >= 1 space per ADU
“A maximum of one (1) Accessory Dwelling Unit (“ADU”) per property is permitted either attached or detached. An ADU shall be permitted on a property where two primary dwelling units exist.”
Private campsites with recreational vehicles or tents within Ossipee town limits.
“Solid waste and sewerage shall be disposed of in a lawful manner. A recreational vehicle connected to a water supply shall be hooked to a sewage disposal system approved by the NH Department of Environmental Services or proper proof of disposal of septic waste at a State licensed facility must be available on site and presented to the Code Enforcement Officer upon request.”
Detached accessory structures within Ossipee town limits.
maximum exempt accessory-structure area: <= 120 square feet (Detached structure only; maximum height 12 feet.) · maximum exempt accessory-structure height: <= 12 feet (Detached structure only; maximum area 120 square feet.)
“The issuance of a permit by the Town Authority (Zoning Enforcement Officer or Building Inspector) is required prior to the placement, commencement of construction or modification of any structure within the Town of Ossipee except for detached accessory structures of 120 Sq ft or less, and a maximum height of 12 ft, fences 7ft and under, general repairs that do not involve structural repairs or changes.”
Development in special flood hazard areas within Ossipee town limits.
“all new construction or substantial improvement of residential structures have the lowest floor (including basement) elevated to or above the one hundred (100) year flood elevation;”
Town of Ossipee does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential District within the Town of Ossipee.
maximum lot coverage: <= 25 percent (Residential District; Table 2 footnote (*4) applies.)
“The maximum lot coverage in Table 2 may be increased by not more than twenty-five percent (25%) of said coverage when adequate systems for on-site storm water drainage are designed by a qualified professional engineer. Such increase shall not reduce the setback areas or buffer strips.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Ossipee or Carroll County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Ossipee publishes no rule on the point, not that none exists. Carroll County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Ossipee means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.