Carroll County, New Hampshire
Town of Madison is a town in Carroll County, New Hampshire. Town of Madison adopts its own zoning, so inside its limits Town of Madison’s rules apply, not the county’s. Septic permits inside Town of Madison come from the state health agency. 12 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Carroll County page.
Construction, substantial improvements, and mechanical installations inside Madison town.
substantial-improvement value threshold: > 8500 USD (Based on contractor's rate and material costs; in-kind non-mechanical repair/replacement with no footprint or floorplan change is exempt from the definition.)
“Upon the effective date of this Ordinance, it shall be unlawful to start any construction, substantial improvement or mechanical installation in the Town of Madison when a permit is required without first obtaining, from the Building Inspector/Code Enforcement Officer, a building and/or mechanical permit according to the following procedure.”
Projects subject to Madison's building and mechanical permit ordinance.
reinspection fee: 50 USD (Charged for each inspection after two attempts at final-inspection approval.)
“The property owner and/or contractor(s) are responsible for scheduling the following inspections with the CEO (if applicable): Foundation, Framing, Mechanical (electrical, plumbing, gas), Insulation and Final*”
All projects subject to the final-inspection provision inside Madison town.
“Final Inspection – ALL PROJECTS – Use and/or occupancy shall not occur until the Certificate of Compliance is issued”
Land inside Madison town, Carroll County, New Hampshire.
“This ordinance shall be known and may be cited as The Zoning Ordinance, Madison, New Hampshire and is hereinafter referred to as “This Ordinance.””
Zoning districts inside Madison town.
“The Groundwater Protection District is an overlay district and includes within its boundaries the Wellhead Protection Areas and Stratified Drift Aquifers shown on the map entitled “Drinking Water Resources and Potential Contamination Sources for the Town of Madison” dated April 8, 1999, by NHDES.”
Manufactured housing and mobile homes inside Madison town.
maximum mobile-home or trailer age at application: <= 10 years
“In Madison mobile homes and trailers are limited to the rural residential and commercial zone. Mobile homes and trailers which are to be placed on any lot, and mobile homes and trailers which are intended to replace older mobile homes will be no more than 10 years old from the date of application”
Accessory dwelling units inside Madison town.
maximum ADU size: <= 800 square feet · minimum ADU off-street parking: >= 2 spaces · maximum ADUs per lot: <= 1 ADU
“11.2 Applicability Accessory Dwelling Units shall be permitted within all zoning districts, provided they comply with Section 11.4 of this Ordinance.”
Subdivision applications inside Madison town.
“Currently, all site plan and subdivision applications require a preliminary non-binding hearing prior to submission of a full application.”
Proposed development in any special flood-hazard area inside Madison town.
“All proposed development in any special flood hazard areas shall require a building permit.”
Building and mechanical permit applications inside Madison town.
minimum building permit fee: 50 USD · remodeling or renovation fee without footprint change: 50 USD · driveway permit fee for access onto Town roads: 40 USD
“The minimum building permit fee is $50.00. TOTAL PERMIT FEES $_____________”
Building and mechanical permit applications inside Madison town.
decision time after complete application: <= 20 business days · resubmission fee: 30 USD (In addition to the original permit application fee.)
“The Building Inspector/ Code Enforcement Officer shall, within twenty (20) business days of receipt of a completed building permit application, review such application and either issue or refuse to issue a building permit to the applicant.”
Town of Madison does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Septic-system approvals required for building-permit applications inside Madison town.
“An Approval for Construction from the State of New Hampshire for a septic system, if necessary.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Madison or Carroll County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Madison publishes no rule on the point, not that none exists. Carroll County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Madison means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.