The Village of Brady, Nebraska requires a building permit before erecting, moving, adding to or structurally altering a building, with limited exemptions.1 Brady sets its own zoning inside village limits, rather than applying Lincoln County’s unincorporated-land zoning.23 Private sewage disposal has village permit provisions where applicable, alongside Nebraska’s onsite wastewater requirements.45
At a glance
- Building permits
- Required for construction, moving, additions and structural alterations, with limited exemptions1
- Zoning
- Village zoning; district determines permitted uses2
- Septic
- Village private-disposal permit provisions plus state requirements45
- AGR lot size
- 3 acres, with a conditional rural-subdivision exception6
- Manufactured homes
- Outside mobile home parks: at least 900 square feet and 18 feet wide, plus other standards7
- Occupancy approval
- Certificate required except for primarily agricultural use8
- Owner-builders
- State contractor-registration exemption does not waive building permits9
Who to call
Building permits
Village of Brady Clerk’s Office
Contact the clerk for the village Zoning Administrator and building-permit submission instructions.
121 N. Main Street Brady, NE 69123
Zoning
Village of Brady Planning Resources
Published village zoning map and building-permit application.
Septic permits
Nebraska DWEE Onsite Wastewater Program
State onsite wastewater rules, permits, registration and professional certification
245 Fallbrook Blvd. Suite 100 Lincoln, NE 68521
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Brady means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Village of Brady, NE?
Brady requires a building permit before a building or structure is erected, moved, enlarged or structurally altered.1 The proposed construction and use must conform to village zoning, other applicable village requirements and lawful variances.1 Agricultural nonresidential buildings or structures in the AGR district and improvements valued at $1,000 or less are exempt from this building-permit requirement.1
A Brady house should not be treated as an exempt agricultural building: the village’s agricultural exemption is specifically nonresidential.10 Nebraska’s own-property contractor-registration exemption does not waive applicable building permits, inspections or codes.9
Who issues building permits in the Village of Brady?
Brady’s Zoning Administrator approves or disapproves building-permit applications within 30 days of receipt; approval and payment of required fees lead to issuance.11 The village planning page provides a building-permit application and official zoning map.12 Start with those resources, then contact the Village Clerk at 308-584-3316 for submission instructions and the current Zoning Administrator contact.13
The village office is at 121 N. Main Street, Brady, NE 69123.13 Ask the clerk for the current building-permit fee schedule before budgeting the application; we could not confirm the fee amount.11 An appeal of the administrator’s determination must be submitted in writing within 10 days after the determination is filed.11
Does the Village of Brady have zoning, lot sizes and setbacks?
Brady has village zoning, including agricultural-residential, residential, commercial and industrial districts.2 Use the village’s official zoning map to identify the parcel’s district before choosing a house location or use.12
In Brady’s AGR Agriculture Residential District, the minimum lot area is 3 acres; a stated rural-subdivision exception with shared or community drinking-water and sanitary-sewer systems may allow half-acre parcels under the specified state-regulation condition.6 AGR front yards must be at least 30 feet deep, measured from the existing roadway right-of-way line.14 AGR rear and side yards have no limitation unless the parcel abuts a Residential District, when the minimums are 15 feet at the rear and 10 feet at the side.14 These are AGR standards; ask the village Zoning Administrator for the requirements of the parcel’s actual district.14
How do septic permits work inside the Village of Brady?
Brady’s private sewage disposal provisions include a local permit requirement where private disposal is applicable, along with inspection, specification and maintenance provisions.154 Ask the village office whether the parcel must connect to public sewer and whether private disposal is eligible before commissioning a septic design.1315
Nebraska requires wastewater-generating buildings to use a compliant onsite wastewater system or connect to public sewer or other wastewater works, with local requirements applying separately.16 The Nebraska DWEE Onsite Wastewater Program handles state requirements and site-specific permitting for systems with large size, non-domestic wastes or siting issues.17 Constructed, reconstructed, altered or otherwise changed onsite systems must be registered with the Department.17 In Brady’s AGR district, sewage disposal and water systems require a special permit, and waste disposal must comply with local and state rules.18
Can you live in an RV or tiny home in the Village of Brady?
We could not confirm permission for long-term RV living, temporary camping or tiny-home occupancy on a private Brady lot; ask the village Zoning Administrator about the proposed unit and use before buying.2 Nebraska classifies tiny houses as manufactured homes, modular housing units or recreational vehicles, and state classification does not establish local land-use approval.19
Brady requires manufactured homes outside mobile home parks to have at least 900 square feet of floor area and an exterior width of at least 18 feet, along with roof, material, transport-equipment and building-code requirements.7 The manufactured-home standard does not establish a general minimum size for every site-built house; we could not confirm that separate minimum.7 Brady also requires a certificate of occupancy for initial and continued occupancy or use, except primarily agricultural uses.8
Building a home in the Village of Brady: what are the steps?
First, locate the parcel on Brady’s official zoning map and discuss the intended residential use with the village Zoning Administrator.122 Next, settle the wastewater route with the village and, for an onsite system, the Nebraska DWEE Onsite Wastewater Program.1517 Submit the building-permit application with the required plot plan and information, and obtain approval before starting work.1
Before occupancy, Brady’s Zoning Administrator examines the buildings, structures or sites covered by a building-permit application, and a certificate of occupancy is required except for primarily agricultural use.208 A temporary partial certificate may last no more than 90 days and is conditional on safe occupancy of completed portions.8 For land outside village limits, consult the Lincoln County guide: county zoning authority excludes incorporated villages and areas under exercised municipal zoning jurisdiction.3
Watch-outs
- We could not confirm Brady’s private-well, sewer-hookup or building-permit fee details; ask the Village Clerk to route those questions before purchasing a lot.13
- Nebraska requires a permit for all floodplain development; ask the village office to identify the applicable local floodplain administrator before grading or construction.2113
- Brady’s manufactured-home rules do not supersede valid restrictive covenants of record.22
Sources
- § 154.136 Building Permits Required (Village of Brady), quoted and re-checked
- Chapter 154: Zoning Code (Village of Brady), quoted and re-checked
- Nebraska Revised Statute 23-114 (Nebraska statewide rule), quoted and re-checked
- Chapter 53: Sewers (Village of Brady), quoted and re-checked
- Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
- § 154.040 AGR Agriculture Residential District (Village of Brady), quoted and re-checked
- § 154.092 Manufactured Homes (Village of Brady), quoted and re-checked
- § 154.137 Certification of Occupancy Required (Village of Brady), quoted and re-checked
- Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule), quoted and re-checked
- § 154.136 Building Permits Required (Village of Brady), quoted and re-checked
- § 154.136 Building Permits Required (Village of Brady), quoted and re-checked
- Village of Brady Planning Resources (villageofbrady.org)
- Village of Brady Clerk’s Office (villageofbrady.org)
- § 154.040 AGR Agriculture Residential District (Village of Brady), quoted and re-checked
- Chapter 53: Sewers (Village of Brady), quoted and re-checked
- Onsite Wastewater Treatment Facilities: Just for Homeowners (Nebraska statewide rule), quoted and re-checked
- Nebraska DWEE Onsite Wastewater Program (dee.nebraska.gov)
- § 154.040 AGR Agriculture Residential District (Village of Brady), quoted and re-checked
- Housing and Recreational Vehicle (Nebraska statewide rule), quoted and re-checked
- § 154.137 Certification of Occupancy Required (Village of Brady), quoted and re-checked
- Floodplain Management Q&A: Permits (Nebraska statewide rule), quoted and re-checked
- § 154.092 Manufactured Homes (Village of Brady), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.