Keith County, Nebraska
Ogallala is a city in Keith County, Nebraska. Ogallala adopts its own zoning, so inside its limits Ogallala’s rules apply, not the county’s. Septic permits inside Ogallala come from Ogallala. 11 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Keith County page.
Erecting, constructing, repairing, relocating or demolishing structures inside Ogallala city
“any person desiring to commence or proceed to erect, construct, repair, relocate, or demolish any structure requiring a building permit under this code of ordinances or cause the same to”
Buildings erected, enlarged, altered, repaired, relocated or converted inside Ogallala city
adopted code: 2009 International Building Code
“the 2009 edition of the international building code, as printed in book or pamphlet form, is hereby incorporated by reference in addition to all amendments as though printed in full herein.”
Land inside Ogallala city limits
“the village zoning code is hereby adopted and incorporated as part of this code of ordinances as fully as if set out at length herein.”
Private sewage disposal systems inside Ogallala city
“before construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the plumbing inspector.”
Private sewage disposal systems inside Ogallala city where public sewer is not available
minimum lot area for subsurface absorption: >= 10000 sq ft
“no permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities when the area of the lot is less than 10,000 square feet.”
Private sewage disposal systems inside Ogallala city
“notify the plumbing inspector when the work is ready for final inspection, and before any underground portions are covered.”
Privies, septic tanks and cesspools inside Ogallala city
connection after sewer becomes available: <= 60 days
“except as hereinafter provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of sewage.”
Properties inside Ogallala city abutting a street, alley or right-of-way with a public sewer
distance to public sewer: <= 500 feet · connection deadline after notice: <= 90 days
“is hereby required at his or her expense to install suitable toilet facilities therein, and to connect such facilities directly with the proper public sewer in accordance with the provisions of this chapter within 90 days after the date of official notice to do so; provided, that said public sewer is within 500 feet of the property line.”
Subdivision of land inside Ogallala city
“the village subdivision code is hereby adopted and incorporated as part of this code of ordinances as fully as if set out at length herein.”
Building permits inside Ogallala city
“the amount of the fee shall be set by resolution of the council and a copy of the fee schedule shall be kept and made available in the office of the city clerk.”
Building permit applications inside Ogallala city
“said officials shall authorize the city clerk to issue the permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Ogallala or Keith County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Ogallala publishes no rule on the point, not that none exists. Keith County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Ogallala means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.