Hooker County, Nebraska

Building permits, zoning and septic in Village of Mullen, Nebraska

Village of Mullen, Nebraska requires a building permit for construction, repairs, enlargement, demolition or relocation of a building or dwelling.1 Mullen has village zoning, with the adopted regulations available through the Village Clerk-Treasurer.2 Private sewage disposal systems need a village permit signed by the Utilities Superintendent; Nebraska wastewater requirements also apply in Hooker County.34

At a glance

Building permits
Required; apply to the Village Clerk-Treasurer1
Zoning
Village regulations adopted by reference; ask the Clerk-Treasurer for the adopted document2
Building inspections
Building Inspector checks repaired, altered, built or moved buildings5
Private sewage disposal
Village permit before construction, signed by the Utilities Superintendent63
Building permit fees
Set by Board of Trustees resolution; request the current amount7
Owner-builder
State contractor-registration exemption for work on your own property; no building-permit exemption established8

Who to call

Building permits

Village of Mullen Clerk-Treasurer

Village building-permit applications and access to adopted zoning regulations

(308) 546-2625

111 NW 1st St.

Septic permits

Village of Mullen Utilities Superintendent

Written village permit for private sewage disposal systems

Septic permits

Nebraska Department of Water, Energy, and Environment Onsite Wastewater Program

State wastewater compliance, system registration and state construction-permit questions

(402) 471-4285

[email protected]

245 Fallbrook Blvd. Suite 100 Lincoln, NE 68521

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Village of Mullen means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Village of Mullen, NE?

Mullen requires a village building-permit application before erecting, constructing, repairing, enlarging, demolishing or relocating a building or dwelling.1 The requirement reaches repairs and moving an existing building, as well as a new home.1 Mullen’s Building Inspector inspects repaired, altered, built or moved buildings as often as necessary to ensure compliance with village ordinances.5 Nebraska exempts a person working on their own property from contractor registration, but that exemption does not establish a waiver of Mullen building permits or inspections.8

Who issues building permits in Village of Mullen?

File Mullen’s building-permit application with the Village Clerk-Treasurer on the village form.9 The Board of Trustees examines the application, plans and specifications and authorizes the Clerk-Treasurer to issue the building permit when the proposal conforms to applicable ordinances and the fee is paid.9 Mullen’s building-permit fee is set by Board resolution; ask the Clerk-Treasurer for the current amount before filing.7 Contact the village office at (308) 546-2625 to request the form and arrange access to the adopted regulations.10

Does Village of Mullen have zoning and setback rules?

Mullen adopts its village zoning regulations by reference, and the Village Clerk-Treasurer maintains the adopted document for public inspection.2 Ask the Clerk-Treasurer to identify the parcel’s district and provide the applicable lot-size, setback, height and lot-coverage standards before choosing a house footprint.2 We could not confirm Mullen’s district dimensional standards or minimum dwelling size; request the adopted zoning document rather than relying on a county setback answer.2 Mullen also adopts building, housing, plumbing and electrical codes by reference, with copies available at the Municipal Clerk-Treasurer’s office; ask which editions govern the proposed work.11

How do septic permits work inside Village of Mullen?

Before constructing a private sewage disposal system in Mullen, the owner must obtain a written village permit signed by the Utilities Superintendent.6 Apply on the municipal form, supply any requested plans and specifications, and pay the permit and inspection fee when filing.6 This village approval is separate from Nebraska’s wastewater requirements: most Hooker County onsite systems use Authorization by Rule, while systems with unsuitable site conditions or wastewater quantity or quality need a state construction permit.12 New or changed onsite wastewater systems must also be registered with the Nebraska Department of Water, Energy, and Environment.13 We could not confirm Mullen’s mandatory sewer-connection conditions; ask the Utilities Superintendent whether private sewage disposal is an option for the address.3

Can you live in an RV or tiny home in Village of Mullen?

We could not confirm permission for residential RV occupancy, temporary camping, tiny homes or accessory dwellings in Mullen; ask the Village Clerk-Treasurer about the proposed use under the adopted village zoning regulations.2 Describe whether the unit is on wheels, whether occupancy will be permanent, and whether the plan is temporary housing during construction.2 Nebraska recognizes tiny houses as manufactured homes, modular housing units or recreational vehicles, but state classification does not establish local occupancy approval.14 A dwelling generating wastewater must have a compliant onsite system or connect to public sewer or other wastewater works, so an RV or tiny-home proposal also needs a sanitation answer.15

What are the steps before building a home in Village of Mullen?

Start with the Village Clerk-Treasurer: request the adopted zoning document and confirm how the planned dwelling fits the parcel’s district.2 Next, establish the wastewater route with the Utilities Superintendent; private sewage construction requires the village’s written permit before work begins.6 Prepare the building application with the legal land description, intended use or occupancy, principal dimensions, estimated cost, owner, architect and contractor information, plus requested plans and specifications.9 Submit the application for Board review and ask for the current building-permit fee and inspection arrangements.95 For land outside village limits, consult the Hooker County guide and confirm jurisdiction: Nebraska county zoning powers exclude incorporated villages and areas where village zoning jurisdiction is being exercised.16

Watch-outs

  • We could not confirm Mullen’s mandatory water or sewer connection conditions; ask the Utilities Superintendent before committing to private sewage disposal.3
  • Mullen’s building-permit fee is set by Board resolution; obtain the current amount from the Village Clerk-Treasurer.7
  • We could not confirm Mullen’s certificate-of-occupancy requirements; ask the Village Clerk-Treasurer what is needed before moving in.9

Sources

  1. § 150.01 BUILDING PERMITS REQUIRED. (Village of Mullen), quoted and re-checked
  2. § 155.01 ZONING REGULATIONS ADOPTED BY REFERENCE. (Village of Mullen), quoted and re-checked
  3. § 53.021 PERMIT REQUIRED; FEE. (Village of Mullen), quoted and re-checked
  4. Nebraska Administrative Code Title 124 – Onsite Wastewater Treatment Systems, quoted and re-checked
  5. codelibrary.amlegal.com (Village of Mullen), quoted and re-checked
  6. § 53.021 PERMIT REQUIRED; FEE. (Village of Mullen), quoted and re-checked
  7. § 150.01 BUILDING PERMITS REQUIRED. (Village of Mullen), quoted and re-checked
  8. Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule), quoted and re-checked
  9. § 150.01 BUILDING PERMITS REQUIRED. (Village of Mullen), quoted and re-checked
  10. Village of Mullen Clerk-Treasurer (villageofmullen.gov)
  11. § 150.03 CODES ADOPTED BY REFERENCE. (Village of Mullen), quoted and re-checked
  12. Onsite Wastewater Treatment Facilities: Permits, quoted and re-checked
  13. Nebraska Department of Water, Energy, and Environment Onsite Wastewater Program (dwee.nebraska.gov)
  14. Housing and Recreational Vehicle (Nebraska statewide rule), quoted and re-checked
  15. Onsite Wastewater Treatment Facilities: Just for Homeowners (Nebraska statewide rule), quoted and re-checked
  16. Nebraska Revised Statute 23-114 (Nebraska statewide rule), quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of Mullen

Village of Mullen’s own rules

  • Building permitRequired

    Erecting, constructing, repairing, enlarging, demolishing, or relocating any building or dwelling inside Mullen village.

    • Application must be filed with the Village Clerk-Treasurer on the village form.
    • The application must include the legal land description, use or occupancy, principal dimensions, estimated cost, owner, architect, contractor, and other requested information.
    • The Board of Trustees checks the application, plans, and specifications.
    • Permit issuance requires conformity with the chapter and other applicable ordinances and payment of a permit fee set by Board resolution.
    • Where procedures differ from an adopted building code, this section governs.
    “Any person desiring to commence or proceed to erect, construct, repair, enlarge, demolish or relocate any building or dwelling, or cause the same to be done, shall file with the Village Clerk-Treasurer an application for a building permit.”
  • Building code adoptedAdopted

    Building, housing, plumbing, and electrical work throughout Mullen village and its zoning jurisdiction.

    • The cited ordinance adopts the B.O.C.A. Basic Building Code, Basic Housing Code, Uniform Plumbing Code, and National Electric Code by reference.
    • Copies are maintained at the Municipal Clerk-Treasurer's office for public inspection.
    • Plumbing adoption is subject to nonconflict with state statutes.
    “The provisions of the Building Code shall be controlling throughout the municipality and throughout its zoning jurisdiction.”
  • InspectionsRequired

    Buildings repaired, altered, built, or moved in Mullen village.

    • The Building Inspector inspects as often as necessary to ensure compliance.
    • If the village has building and housing regulations but the Board fails to appoint an inspector, the chief village law-enforcement officer serves ex officio.
    “He or she shall inspect all buildings repaired, altered, built or moved in the village as often as necessary to ensure compliance with all village ordinances.”
  • Local zoningPresent

    Land inside Mullen village limits; village zoning regulations are adopted and incorporated by reference.

    • The adopted zoning document itself is maintained for public inspection by the Village Clerk-Treasurer.
    • Ordinance 115 passed 10-13-1999; Ordinance 227 passed 3-11-2024.
    “The zoning regulations for the village are hereby adopted and incorporated by reference for this code of ordinances.”
  • Who permits septicLocal

    Private sewage disposal systems inside Mullen village.

    • The permit is signed by the Village Utilities Superintendent.
    • The available ordinance text does not establish whether another state or district approval is also required.
    “Before the commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the Utilities Superintendent.”
  • Septic permitRequired

    Construction of a private sewage disposal system inside Mullen village.

    • Written permit must be obtained before construction.
    • Application uses a municipal form and may require plans, specifications, and other information.
    • A permit and inspection fee is due when the application is filed.
    “Before the commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the Utilities Superintendent.”
  • Permit feesVariable (with conditions)

    Building permits inside Mullen village.

    • The amount is set by the Board of Trustees by resolution; no amount was published in the retrieved code section.

    building permit fee: set by Board resolution

    “The Board of Trustees shall authorize the Village Clerk-Treasurer to issue the applicant a permit upon payment of a permit fee set by the Board by resolution.”
  • Permit processPublished (with conditions)

    Village building-permit process inside Mullen village.

    • Applicant files a written application with the Village Clerk-Treasurer.
    • Application includes land description, use or occupancy, dimensions, estimated cost, owner, architect, contractor, and requested information.
    • Board of Trustees reviews conformity and authorizes issuance.
    • Fee is set by Board resolution.
    “The application, plans and specifications so filed with the Village Clerk-Treasurer shall be checked and examined by the Board of Trustees, and if they are found to be in conformity with the requirements of this chapter and all other ordinances applicable thereto, the Board of Trustees shall authorize the Village Clerk-Treasurer to issue the applicant a permit upon payment of a permit fee set by the Board by resolution.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Mullen or Hooker County directly.

  • Owner-builder exemption — Owner-builder exemption from building-permit or inspection requirements inside Mullen village.
  • Certificate of occupancy — Certificate of occupancy requirements inside Mullen village.
  • Minimum dwelling size — Minimum dwelling size inside Mullen village; district-specific zoning text was not available in the accessible code.
  • Minimum lot size — Minimum lot size inside Mullen village.
  • Setbacks — Building setbacks inside Mullen village.
15 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Mullen publishes no rule on the point, not that none exists. Hooker County’s page lists the county offices to call.

← All of Hooker County: county rules, score and offices