Lexington, Nebraska requires a residential construction application through the city Building Department, and the city administers zoning.12 Inside Lexington in Dawson County, private sewage disposal is subject to city approval and state wastewater requirements; qualifying properties must connect to public sewer.345
At a glance
- Building permits
- City residential application and plans required1
- Zoning
- City zoning; floodplain overlays add standards2
- Septic
- City private-system approval plus state requirements34
- Public sewer
- Connection required when the sewer rule applies5
- Electrical permits
- Nebraska State Electrical Division, per city residential instructions1
- Owner-builder
- Own-property contractor-registration exemption; city permit exemption unconfirmed6
Who to call
Building permits
Residential building applications, plan review and zoning questions; ask the city to route floodplain and private-sewage questions.
PO Box 70, Lexington, NE 68850
Septic permits
Nebraska Department of Water, Energy, and Environment - Onsite Wastewater Program
Statewide onsite wastewater standards, professional certification, subdivision review and permits for systems requiring site-specific evaluation
245 Fallbrook Blvd. Suite 100 Lincoln, NE 68521
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Lexington means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Lexington, NE?
Lexington’s residential construction instructions require a permit application and detailed plans, including a floor plan.1 The city’s instructions cover remodels, additions, attached garages, attached roofs and decks as well as new residential construction.1 Ask the Lexington Building Department to identify the application and inspection requirements for your specific project before work begins.1 Lexington building-department permit fees are set by city council resolution, with the fee schedule available for public inspection at the department.7 Nebraska’s own-property contractor-registration exemption does not establish an exemption from Lexington building permits or inspections.6
Who handles building applications and inspections in Lexington?
Start with the Lexington Building Department using the city’s residential application; the application lists the department’s phone and mailing address.1 Lexington’s residential instructions direct electrical permits to the Nebraska State Electrical Division and say a certificate of occupancy will not be issued until the state electrical inspector completes a final inspection.1 Ask the city which additional final inspections your project needs.1 Driveway, curb-cut, sidewalk and related work on public streets and alleys requires a permit from the city building official and plans, so include access work in your initial conversation.8
Does Lexington have zoning, and what does it mean for RVs and tiny homes?
Lexington administers zoning inside city limits, and floodplain overlay standards apply in addition to the underlying zoning district’s standards.2 Lexington’s floodplain districts include the FW Floodway Overlay District and FF Flood Fringe Overlay District; those overlays do not replace the underlying district.9 Ask the Lexington Building Department to confirm the parcel’s district and whether your proposed home fits the applicable setbacks before designing the site plan.1 We could not confirm Lexington’s rules for living in an RV, tiny-home occupancy or accessory dwelling units; ask the city about your intended dwelling and duration of occupancy before buying.
How do septic permits and sewer connections work inside Lexington?
Lexington requires public-sewer connection for covered buildings where a public sanitary sewer is in the abutting street, alley or right-of-way and within 100 feet of the property line; new buildings must connect at construction, while existing covered properties must connect within 90 days after official notice.5 Lexington will not issue a private sewage disposal permit where lot area or soil conditions are inadequate for the proposed use.3 Nebraska’s statewide wastewater requirements apply in addition to city requirements, and altered or newly constructed onsite systems must be registered with the state.410 Ask the city about sewer availability first, then contact the state Onsite Wastewater Program about any proposed private system.511
What are the steps to building a home in Lexington?
- Ask the Lexington Building Department to confirm zoning and whether the project fits the parcel’s setbacks.1
- Confirm sewer service before selecting a private wastewater system: Lexington requires connection when its public-sewer rule applies.5
- Prepare the residential application, floor plan and detailed measurements; ask the department what site and construction details to submit.1
- Resolve floodplain approval before development in covered floodplain areas; Lexington’s city manager or designated representative issues the floodplain development permit.12
- Arrange electrical permitting with the Nebraska State Electrical Division and confirm final inspection requirements with the city before occupancy.1
What should you check before buying land in Lexington?
Lexington’s floodplain chapter requires a development permit in covered mapped floodplain areas, with additional standards for construction, subdivisions, manufactured homes and utilities.12 The city’s residential instructions also require an elevation certificate in a high-hazard flood area.1 Lexington regulates subdivision and replatting, with an exemption when the smallest parcel created is more than 10 acres; that exemption is specific to the subdivision chapter.13 For land outside Lexington, use the Dawson County guide for the county’s unincorporated-area zoning answers.14 We could not confirm private-well requirements inside Lexington; ask the city before assuming a well can replace municipal water service.
Watch-outs
- Lexington’s residential instructions assign electrical permits to the Nebraska State Electrical Division; confirm the current electrical process with the city before installation.1
- A Lexington private sewage disposal system must be abandoned and filled when public sewer becomes available and the connection rule applies.5
- We could not confirm Lexington’s RV occupancy rules; ask the Building Department about residential use of an RV, including during construction.1
Sources
- Lexington Building Department (info.cityoflex.com)
- Sec. 105-68. - Floodplain districts established (Lexington), quoted and re-checked
- library.municode.com (Lexington), quoted and re-checked
- Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
- Sec. 28-311. - Use of public sewers required (Lexington), quoted and re-checked
- Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule), quoted and re-checked
- Sec. 103-20. - Building department permit fees (Lexington), quoted and re-checked
- Sec. 103-49. - Permit—Required (Lexington), quoted and re-checked
- Sec. 105-68. - Floodplain districts established (Lexington), quoted and re-checked
- Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
- Nebraska Department of Water, Energy, and Environment - Onsite Wastewater Program (dwee.nebraska.gov)
- Sec. 105-8. - Lands to which chapter applies (Lexington), quoted and re-checked
- library.municode.com (Lexington), quoted and re-checked
- Dawson County Planning & Zoning (2026 county census)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.