Ray, North Dakota requires city approval for building activity; the city’s published process also routes building-permit applications through Williams County for review and inspections.1 Ray decides zoning compliance before action on a building permit.2 Septic permits are handled by the Upper Missouri District Health Unit, rather than the city’s zoning office.3
At a glance
- Building permits
- City application plus Williams County building-permit review1
- Zoning
- City zoning conformance approval4
- Septic permits
- Upper Missouri District Health Unit; public sewer availability matters5
- Agricultural District lot size
- Minimum 10 acres6
- Agricultural District setbacks
- 50 feet from boundaries for non-farm work-related structures7
- Utility connections
- City water and sewer connections require a permit and inspection8
Who to call
Building permits
Ray City Hall / City Auditor’s Office
City building applications, zoning conformance and water/sewer connection applications
101 Main Street | Ray, ND 58849
Building permits
Ray City Auditor’s Office — published building-permit process
Published sequence for building permits within Ray city limits
Septic permits
Upper Missouri District Health Unit — Environmental Health
Individual septic-system permits and installer licensing
110 W. Bdwy, Suite 101 Williston, ND 58801
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Ray means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Ray, ND?
Ray’s published building guidelines require a city permit or zoning conformance when a structure will be built on the property.8 Ray also requires a property survey and City Commission approval before building.8 The city’s published building-permit sequence includes a separate Williams County building permit, county plan information and county inspections.1 Start with Ray City Hall to obtain the appropriate city application and confirm the approvals for your project.8
Who handles building-permit applications in Ray?
Ray City Hall is the starting contact for the city building application and zoning conformance questions; call 701-568-2204 or email [email protected].8 The city’s published process directs applicants to submit the city application and a $25 fee at the City Auditor’s Office before taking the application and receipt to Williams County Building Department.1 County building-permit fees are a separate step in that process, and the approved county permit returns to the city for City Commission approval.1
Does Ray have zoning, lot-size rules and setbacks?
Ray uses a zoning conformance permit to establish that routine building activity complies with city zoning.4 Ray can process zoning conformance alongside fire- and building-code permits, but zoning compliance must be determined before action on the building permit.2 In Ray’s Agricultural District, the minimum lot size is 10 acres.6 Ray’s Agricultural District requires non-farm work-related structures to sit at least 50 feet from every property boundary.7 Ask City Hall to identify the parcel’s district and the applicable application before designing the building footprint.8
How do septic permits and sewer connections work in Ray?
The Upper Missouri District Health Unit permits individual septic systems in Williams County, including the health district’s service area in Ray.3 UMDHU requires an individual-system permit before construction and refuses that permit where public sewer is available.5 UMDHU requires discharge into a public or non-community sewage system when the system is deemed available within 200 feet of premises used for human occupancy.9 Ray requires a city permit and inspection before connection to city water or sewer lines.8 For an approved private septic installation, notify UMDHU at least 2 working days before inspection and leave the installation uncovered until inspected unless prior approval is granted.10
Can you live in an RV or tiny home in Ray?
We could not confirm a general Ray rule allowing private-lot RV living or tiny-home occupancy; ask Ray City Hall for the zoning approval that would apply to your proposed dwelling.8 Ray’s manufactured-home definition requires a permanent foundation and connection to public water and sewer where available, alongside other construction and dimensional conditions.11 Ray’s temporary workforce-housing provisions require each dwelling to connect properly to the city sewer system with city-approved connections.12 A temporary workforce-housing space cannot be occupied until the building inspector issues a certificate of occupancy.13
Building a home in Ray: what are the steps?
- Obtain the appropriate application from Ray City Hall and arrange the property survey required for city building approval.8
- Submit the city building application and $25 fee at the City Auditor’s Office, then take the application and receipt to Williams County Building Department.1
- Apply for the county building permit, pay county application fees and provide the requested building plans.1
- Bring the granted county building permit back to Ray for City Commission approval before building.1
- Follow county inspection requirements; the published process sends the county certificate of occupancy through the city to the applicant.1
What should you check before buying land in Ray?
Ask Ray City Hall to identify the city applications for your proposed construction and water or sewer connections before committing to a design.8 If private septic is proposed, UMDHU’s minimum lot size is 1 acre, with smaller lots possible through an approved centralized system; zoning may require more land.14 That sanitation minimum does not replace Ray’s 10-acre Agricultural District minimum.146 For land outside Ray city limits, consult the Williams County guide for the county’s unincorporated-area zoning rules.15
Watch-outs
- Do not treat Ray’s city building application as the entire approval: the published process also requires Williams County building-permit review and Ray City Commission approval.1
- We could not confirm an owner-builder exemption for Ray; ask City Hall which building approvals apply to an owner-built home.8
- Ray’s building-sewer permit and inspection fee is set by City Commission resolution and paid when the application is filed; ask the city for the current amount.16
Sources
- Ray City Auditor’s Office — published building-permit process (cms2.revize.com)
- Ray Code of Ordinances § 34-70, Zoning conformance permits (Ray), quoted and re-checked
- Environmental Health, quoted and re-checked
- Ray Code of Ordinances § 34-70, Zoning conformance permits (Ray), quoted and re-checked
- Regulations for Individual Sewage Treatment Systems, quoted and re-checked
- Ray Code of Ordinances § 34-106, Agricultural District (AG) (Ray), quoted and re-checked
- Ray Code of Ordinances § 34-106, Agricultural District (AG) (Ray), quoted and re-checked
- Ray City Hall / City Auditor’s Office (raynd.com)
- Regulations for Individual Sewage Treatment Systems, quoted and re-checked
- Regulations for Individual Sewage Treatment Systems, quoted and re-checked
- Ray Code of Ordinances § 34-2, Definitions (Ray), quoted and re-checked
- Ray Code of Ordinances § 34-158, Temporary workforce housing facilities (Ray), quoted and re-checked
- Ray Code of Ordinances § 34-158, Temporary workforce housing facilities (Ray), quoted and re-checked
- Regulations for Individual Sewage Treatment Systems, quoted and re-checked
- Ordinance No. 2022-08-02.1, County-Wide Zoning District Map, quoted and re-checked
- Ray Code of Ordinances § 32-110, Building sewers and connections (Ray), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.