Zoning, building permits and septic rules in Fessenden, North Dakota
Fessenden is a city in Wells County, North Dakota. Septic permits inside Fessenden come from the county and state together. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Wells County page.
Answers from the rulebook for Fessenden
Fessenden’s own rules
Mandatory utility hookupWater and sewer (with conditions)
A new water and/or sewer connection to City of Fessenden utility service inside city limits.
The area served must be duly platted, the plan approved by the governing body, and recorded in the Wells County Register of Deeds Office.
The prohibition may be waived only in limited and extraordinary circumstances under section 7.0110.
For property not previously assessed for existing utility lines, payment or a written agreement to pay in monthly installments within a maximum of five years is required before a connection permit is issued.
“No application for water and/or sewer service shall be approved and no person shall hook up to or make connection with the city water and sewer system”
Subdividing landLimited
Land seeking City of Fessenden water or sewer service inside city limits.
The utility-service rule does not establish the complete municipal subdivision process.
The area must be duly platted, the plan approved by the governing body, and recorded in Wells County before utility service is approved, subject to a limited-and-extraordinary-circumstances waiver.
“been duly platted and the plan approved by the governing body and recorded in the Register or Deeds Office of Wells County, North Dakota.”
Permit feesPublished (with conditions)
City water and sewer utility service and connection activity inside Fessenden city limits.
The January 19, 2026 resolution states water and sewer rates, fees, and charges are on file with the city auditor.
Chapter 7 permits the City Council to change connection charges by resolution from time to time.
water shutoff charge: 50 USD · water turn-on charge: 50 USD · new-user water deposit: 100 USD
“All new users: $100.00 D. Connection $50.00 charge for shutting water off $50.00 charge for turning water on”
Permit processPartial
Application for a new City of Fessenden water and sewer service connection.
The application must state the exact premises description, general and special water uses, nature of sewage to be discharged, and estimated quarter-annual water use.
The applicant must pay a connection charge established by City Council resolution, which may change from time to time.
“shall apply for a connection on a form provided by the municipality.”
Rules another office applies inside Fessenden
Fessenden does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Who permits septicMixed (with conditions)
An onsite wastewater treatment system proposed inside Fessenden city limits when private sewage disposal is otherwise allowable under city law.
The state source requires a permit from the local public health unit before an installer begins work.
“The North Dakota Department of Environmental Quality oversees the licensing of onsite wastewater treatment system installers”
Septic permitRequired
Installation of an onsite wastewater treatment system inside Fessenden city limits when private sewage disposal is allowed.
An installer must secure a permit from the local public health unit before beginning work.
The installer must also obtain a department license.
“secure a permit from their local public health unit before beginning work on a system.”
Well permitLimited
Private water wells proposed inside Fessenden city limits.
A Department of Water Resources permit is required only if the well will draw over 12.5 acre-feet per year.
Hired construction, installation, or repair requires a licensed contractor; an individual may install or repair a well on the individual's own property without Board licensure.
annual withdrawal threshold: > 12.5 acre-feet per year (A Department of Water Resources permit is needed above this threshold.)
“If your well will draw over 12.5 acre-feet (4,073,000 gallons) of water per year, it needs to be permitted”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Fessenden or Wells County directly.
Building permit — New residential building construction inside Fessenden city limits.
Owner-builder exemption — Owner-built homes inside Fessenden city limits.
Building code adopted — Building construction inside Fessenden city limits.
Inspections — General residential building inspections inside Fessenden city limits.
Certificate of occupancy — Residential occupancy inside Fessenden city limits.
17 more unanswered
Local zoning
Zoning districts
Minimum dwelling size
Minimum lot size
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Septic inspection
Agricultural exemption
Driveway access
Building in a floodplain
Short-term rentals
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Fessenden publishes no rule on the point, not that none exists. Wells County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Fessenden means bringing your own water and power. The kit we’d start with: