Bolthole Index

Towner County, North Dakota

Zoning, building permits and septic rules in Bisbee, North Dakota

Bisbee is a city in Towner County, North Dakota. 5 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Towner County page.

Answers from the rulebook for Bisbee

Rules another office applies inside Bisbee

Bisbee does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Owner-builder exemptionConditional

    A person installing an onsite wastewater treatment system on that person's own premises inside Bisbee city.

    • The individual is exempt from installer-license requirements but must obtain a system permit.
    • The statewide onsite-wastewater rule became effective October 1, 2026.
    “An individual installing a system on the individual's premises is exempt from the requirements of this section. The individual shall obtain a permit for the system in accordance with section 33.1-21-01-06.”
  • Minimum lot sizeSpecified

    A parcel inside Bisbee city on which a new onsite wastewater treatment system is installed.

    • This is an onsite-wastewater-system standard, not evidence of a Bisbee zoning district or citywide lot-size standard.
    • The system must be installed in original natural soil; compacted fill and scraped areas are unsuitable soils.

    minimum lot size: >= 1 acre (for installation of a new onsite wastewater treatment system)

    “The minimum lot size in which a new system may be installed is one acre [.405 hectares].”
  • Septic permitRequired

    Construction, alteration, repair, or extension of an onsite wastewater treatment system inside Bisbee city.

    • Regular system maintenance does not require a permit.
    • The permit must be issued by the permitting authority having jurisdiction where the work occurs.
    • A permit may not be issued without a valid installer license, except for an individual installing on the individual's own premises.
    • A permit is valid for no more than 12 months from issuance.

    permit validity: <= 12 months

    “A person may not construct, alter, repair, or extend any system without first obtaining a permit from the permitting authority. Regular system maintenance does not require a permit.”
  • Septic inspectionRequired

    Installation of an onsite wastewater treatment system inside Bisbee city.

    • Installation inspection must be conducted by the permitting authority or its authorized representative.
    • Inspection must occur within one business day after a request for inspection.
    • Existing-equipment and operational inspections may occur at a reasonable time.

    inspection response: <= 1 business day (after receiving the request for inspection)

    “Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
  • Well permitLimited

    Groundwater withdrawal for a well serving land inside Bisbee city.

    • A water appropriation permit is required for industrial use, irrigation of five acres or more, and listed uses exceeding 12.5 acre-feet annually.
    • For domestic, livestock, fish and wildlife, and recreational uses under 12.5 acre-feet annually, no water appropriation permit is required, but constructed-works location and capacity must be reported to DWR.

    annual water-use threshold: > 12.5 acre-feet per year (domestic, municipal, public, livestock, fish and wildlife, and recreational water use) · irrigation threshold: >= 5 acres

    “A water appropriation permit is required for: Any industrial water use; Irrigation of 5 acres or more; or Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Bisbee or Towner County directly.

  • Building permit — Residential construction inside Bisbee city limits.
  • Building code adopted — Residential buildings inside Bisbee city limits.
  • Inspections — Residential building inspections inside Bisbee city limits.
  • Certificate of occupancy — Residential occupancy inside Bisbee city limits.
  • Local zoning — Land inside Bisbee city limits.
18 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Bisbee publishes no rule on the point, not that none exists. Towner County’s page lists the county offices to call.

← All of Towner County: county rules, score and offices