Ransom County, North Dakota
Lisbon is a city in Ransom County, North Dakota. Lisbon adopts its own zoning, so inside its limits Lisbon’s rules apply, not the county’s. 16 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Ransom County page.
Constructing, altering, repairing or moving a building inside Lisbon city
building permit fee: per 10 cents per $100 of estimated cost USD (minimum $1, maximum $10)
“any person desiring to construct, alter, repair or move a building or other heavy object into, within or through the city of lisbon must first make an application in writing for a permit”
Building construction inside Lisbon city
“the state building code as defined in n.d.c.c. 54-21.3-03 is hereby adopted in full as the minimum standard for building construction in the city of lisbon.”
Buildings under construction with a permit inside Lisbon city
“the building inspector, or fire warden, or other designated official, shall as often as practical, inspect all buildings or structures during construction for which a permit has been issued”
Land within Lisbon city limits (and a half-mile extraterritorial area if the city elects it)
“this ordinance shall be known, and may be cited and referred to as the lisbon zoning ordinance.”
Lisbon city zoning districts
“15.41.1 a-1 agricultural district 15.41.2 r-1 single family residential district 15.41.3 r-2 multi family residential district 15.41.4 c-1 general commercial district”
R-1 single family rural residential district inside Lisbon city
minimum lot area, single family: >= 8000 square feet
“the minimum lot area shall be no less than eight thousand (8,000) square feet for single family units and twelve thousand (12,000) square feet for two (2) family units.”
“15.53.41 the minimum lot area in r-2 residential district for residential uses shall be: (a) six thousand (6,000) square feet for single family units; (b) eight thousand (8,000) square feet for two family units; and (c) two thousand five hundred (2,500) square feet for each multi-family unit excluding the yard requirements.”
R-1 single family rural residential district inside Lisbon city
front yard: >= 20 feet · rear yard: >= 20 feet · side yard: >= 8 feet
“15.52.52 the minimum rear yard, measured from the rear lot line, shall be no less than twenty (20) feet.”
“15.51.52 the minimum rear yard, measured from the rear lot line, shall not be less than thirty (30) feet.”
R-1 single family rural residential district inside Lisbon city
maximum height: <= 35 feet (or 2.5 stories)
“no building shall be more than two and one-half (2½) stories or thirty-five (35) feet high except institutional buildings and church steeples approved by the planning commission.”
“15.51.61 the building height shall not exceed two and one-half (2½) stories or thirty-five (35) feet except for church steeples, farm related and communications structures.”
Manufactured homes in the R-2 multi-family district inside Lisbon city (R-1 allows them only as a conditional use, 15.52.34)
minimum width: >= 24 feet
“15.53.24 manufactured homes installed on permanent foundations or basements.”
Use of land and buildings for agriculture inside Lisbon city
“15.17 exceptions these regulations shall not apply to the use of land and buildings for agriculture as defined herein.”
Flood-prone land inside Lisbon city (F-1 floodplain district overlays all zoning districts)
“these regulations shall apply to all lands and structures prone to flooding in all zoning districts.”
Building permits inside Lisbon city
building permit fee: per 10 cents per $100 of estimated cost USD (minimum $1, maximum $10)
“together with a fee of ten cents per hundred dollars ($100.00) or fraction thereof of estimated cost of building to be constructed”
Building permits inside Lisbon city
“it shall be the duty of the city auditor to file such application and to present the same to the city council at its next regular or special meeting”
We looked and could not find an official answer yet. Silence is not permission; ask Lisbon or Ransom County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Lisbon publishes no rule on the point, not that none exists. Ransom County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Lisbon means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.