Ramsey County, North Dakota
Hampden is a city in Ramsey County, North Dakota. Septic permits inside Hampden come from Hampden. 5 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Ramsey County page.
Hampden does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite sewage treatment systems inside Hampden city limits, which are in Ramsey County.
“Environmental Health is responsible for health and safety education to enforce state public health laws, LRDHU regulations, and local ordinances in Benson, Cavalier, Eddy, Pierce, Ramsey, Rolette, and Towner counties. [...] LRDHU licenses and permits all new onsite sewage treatment systems (OSTS) and/or repairs to existing OSTS which include: septic tanks, drain fields, cesspools, and/or holding tanks.”
Construction, alteration, repair, or extension of an onsite wastewater system inside Hampden city limits.
permit validity: <= 12 months (from date of issuance) · engineering-review threshold: >= 2500 gallons per day (plans and specifications must be prepared by a North Dakota-registered professional engineer and submitted for state review)
“A person may not construct, alter, repair, or extend any system without first obtaining a permit from the permitting authority. Regular system maintenance does not require a permit.”
Installation of an onsite wastewater system inside Hampden city limits.
inspection timing after request: <= 1 business day (installation inspection)
“Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
Onsite wastewater sanitation for land inside Hampden city limits.
public-sewer availability distance: <= 200 feet (unless written documentation indicates denial of connection from the sewer authority)
“The permitting authority may deny a permit for the construction of a system if a public sewer system is available within two hundred feet [60.96 meters] of the property line unless written documentation indicates denial of connection from the sewer authority.”
Water wells inside Hampden city limits.
annual withdrawal threshold: > 12.5 acre-feet per year (a permit is needed above this amount)
“If your well will draw over 12.5 acre-feet (4,073,000 gallons) of water per year, it needs to be permitted by the North Dakota Department of Water Resources (swc.nd.gov | 701-328-2750). A permit is not needed for wells that draw less than 12.5 acre-feet per year.”
We looked and could not find an official answer yet. Silence is not permission; ask Hampden or Ramsey County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Hampden publishes no rule on the point, not that none exists. Ramsey County’s page lists the county offices to call.