Ramsey County, North Dakota
Crary is a city in Ramsey County, North Dakota. Septic permits inside Crary come from the county and state together. 5 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Ramsey County page.
Crary does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite wastewater systems statewide, including systems proposed inside Crary city limits.
“Except as otherwise provided by law, the department has the exclusive authority to adopt rules regarding licensing, permitting, and inspections of onsite wastewater treatment systems.”
Construction, alteration, repair, or extension of an onsite wastewater treatment system inside Crary city limits.
permit validity: <= 12 months · public sewer availability distance: <= 200 feet (unless written documentation indicates denial of connection from the sewer authority)
“A person may not construct, alter, repair, or extend any system without first obtaining a permit from the permitting authority. Regular system maintenance does not require a permit.”
Installation of an onsite wastewater treatment system inside Crary city limits.
inspection timing after request: <= 1 business day
“Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
Private onsite wastewater sanitation systems inside Crary city limits.
“A person may not construct, alter, repair, or extend any system without first obtaining a permit from the permitting authority.”
An onsite-wastewater-system proposal inside Crary city limits where public sewer is available.
public sewer availability distance: <= 200 feet (unless written documentation indicates denial of connection from the sewer authority)
“The permitting authority may deny a permit for the construction of a system if a public sewer system is available within two hundred feet [60.96 meters] of the property line unless written documentation indicates denial of connection from the sewer authority.”
We looked and could not find an official answer yet. Silence is not permission; ask Crary or Ramsey County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Crary publishes no rule on the point, not that none exists. Ramsey County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Crary means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.