Center is a city in Oliver County, North Dakota. Center adopts its own zoning, so inside its limits Center’s rules apply, not the county’s. Septic permits inside Center come from the county and state together. 10 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Oliver County page.
Erecting any structure, shingling, re-siding, installing new windows, or remodeling a home within Center.
“Building permits are required for erecting any structure, shingling, re-siding, new windows or remodeling your home.”
Buildings and structures in the City of Center.
“That code is hereby adopted and made a part of this chapter by reference”
Land within the City of Center, North Dakota.
“The zoning regulations in Center aim to promote the health, safety, and well-being of residents by guiding land use and city development.”
Construction of a private wastewater disposal system inside Center where public sewer is not available under section 7.0303(4).
private wastewater disposal permit and inspection fee: 20 USD (Paid to the City when the application is filed.)
“Before commencement of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the superintendent.”
Private wastewater disposal systems inside Center.
“Where a public sanitary or combined sewer is not available under the provisions of Section 7.0303 (4), the building sewer shall be connected to a private wastewater disposal system”
Houses, buildings, or properties used for human occupancy, employment, recreation, or other purposes in Center.
public sewer distance from property line: <= 200 feet (According to the North Dakota plumbing code.) · connection deadline after official notice: <= 30 days
“within thirty (30) days after date of official notice to do so, provided that said public sewer is within 200 feet (61 meters)”
Private wastewater disposal-system permit applications in Center.
private wastewater disposal permit and inspection fee: 20 USD (Payable to the City when the application is filed.)
“A permit and inspection fee of $20.00 shall be paid to the City at the time the application is filed.”
Private wastewater disposal-system permit applications in Center.
“The application for such permit shall be made on a form furnished by the City”
Center does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite wastewater treatment systems, including systems inside Center.
““Permitting authority” means a North Dakota local public health unit, other political subdivision, or their designees.”
Installation of an onsite wastewater treatment system, including in Center.
inspection timing after request: <= 1 business day (Applies to installation inspection under the cited statutory provision.)
“Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority”
We looked and could not find an official answer yet. Silence is not permission; ask Center or Oliver County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Center publishes no rule on the point, not that none exists. Oliver County’s page lists the county offices to call.