McLean County, North Dakota
Max is a city in McLean County, North Dakota. Max adopts its own zoning, so inside its limits Max’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the McLean County page.
Building, structural alteration or moving of structures on land within Max city's zoning limits
“no land within the zoning limits shall be built upon and no structure or building shall be structurally altered or moved until a permit has been obtained from the zoning administrator.”
Work in Max city requiring a building permit
“upon completion of any work requiring a building permit, the zoning administrator conducts an onsite inspection of the work specified on the building permit.”
Occupying or changing use of land or buildings erected, altered or extended in Max city
issuance deadline: <= 45 days · temporary certificate: <= 30 days (part of a building only)
“no land shall be occupied or used and no building hereafter erected, altered, or extended shall be used or changed in use until a certificate of occupancy shall have been issued by the zoning committee”
Land inside the city limits of Max city (McLean County), ND
“this ordinance is adopted under the authority of chapter 40-47 of the north dakota century code.”
Max city zoning districts: AG, R-1, R-3, MH, C, industrial, NB
“the city is hereby divided into use districts and area districts as shown on the district zoning map”
R-1 single-family residential district, Max city
minimum lot width: >= 75 feet · minimum lot area: >= 11250 square feet
“width =75 feet area- 11,250 square feet minimum setbacks”
“50 feet from any public right-of-way or property line corner lots must adhere to clear sight triangle setback lot size i. minimum two (2) acre for non-farm residences”
R-1 single-family residential district, Max city
front yard: >= 30 feet · rear yard: >= 25 feet (exclusive of 10 foot alley easement) · side yard: >= 10 feet
“minimum setbacks i) frontyard - depth of 30 feet ii) rearyard - depth of 25 feet, exclusive of a 10 foot alley easement iii) side yard -width of 10 feet”
“50 feet from any public right-of-way or property line corner lots must adhere to clear sight triangle setback lot size i. minimum two (2) acre for non-farm residences”
R-1 single-family residential district, Max city
max coverage inside lot: <= 30 percent · max coverage corner lot: <= 35 percent
“the principal building and all accessories shall not cover more than 30 percent of an inside lot, nor more than 35 percent of a corner lot”
R-1 single-family residential district, Max city (R-3 also 40 feet or 3 stories)
max building height: <= 40 feet or 3 stories (appurtenances exempt under 6.1201)
“no building shall exceed 40 feet or 3 stories in height”
Campers/RVs in the R-1 single-family residential district of Max city (same wording in R-3)
max consecutive occupancy: <= 15 days
“camper regulations i) no vehicle of this type may be actively occupied for more than 15 consecutive days.”
Manufactured homes in the R-1 single-family district of Max city (same wording in R-3)
“no single wide manufactured home is allowed outside of a mobile home park iii) pre-owned homes must be inspected before moving into city limits. iv) double wide manufactured home must be placed on concrete footings.”
Building permits issued by Max city zoning administrator
building permit: 10 USD · deck: 5 USD · demolition permit: 10 USD
“a) permit required - $10 b) deck - $5.00 c) demolition permit - $10”
Building permit applications in Max city
“the building permit process is outlined below: a) allapplicants who wish to build or alter any structure as defined in this ordinance must apply to the zoning administrator for a permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Max or McLean County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Max publishes no rule on the point, not that none exists. McLean County’s page lists the county offices to call.