LaMoure County, North Dakota
Jud is a city in LaMoure County, North Dakota. Septic permits inside Jud come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the LaMoure County page.
Jud does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Lots inside Jud city limits on which a new onsite wastewater system is installed.
minimum lot size: >= 1 acre (new onsite wastewater system)
“the minimum lot size in which a new system may be installed is one acre [.405 hectares].”
Onsite wastewater systems inside Jud city limits under statewide North Dakota law.
“Except as otherwise provided by law, the department has the exclusive authority to adopt rules regarding licensing, permitting, and inspections of onsite wastewater treatment systems.”
Construction, alteration, repair, or extension of an onsite wastewater system inside Jud city limits.
permit validity: <= 12 months
“any permit is valid for no more than twelve months from date of issuance.”
Installation of an onsite wastewater system inside Jud city limits.
inspection timing after request: <= 1 business day
“Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
Off-grid onsite wastewater disposal inside Jud city limits.
“water carried from bathrooms, kitchens, laundry fixtures, and other household plumbing must pass through a septic tank or higher level of treatment prior to its discharge into the soil. if underground dispersal for treatment is not feasible, the permitting authority may review alternative methods of collection and disposal.”
Water use from a private well inside Jud city limits.
domestic water use threshold: > 12.5 acre-feet per year (permit required when exceeded)
“A water appropriation permit is required for: Any industrial water use; Irrigation of 5 acres or more; or Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”
Proposed onsite wastewater systems inside Jud city limits where a public sewer is available.
public sewer distance from property line: <= 200 feet (written documentation indicates denial of connection from the sewer authority)
“the permitting authority may deny a permit for the construction of a system if a public sewer system is available within two hundred feet [60.96 meters] of the property line unless written documentation indicates denial of connection from the sewer authority.”
Onsite wastewater permits issued for work inside Jud city limits.
“The permit must be issued by the permitting authority within the jurisdictional limits where the work is being done. The fee for the permit must be set by the permitting authority. The permitting authority shall maintain records of all permits it has issued for the life of the system.”
We looked and could not find an official answer yet. Silence is not permission; ask Jud or LaMoure County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Jud publishes no rule on the point, not that none exists. LaMoure County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Jud means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.