Jud is a city in LaMoure County, North Dakota. Septic permits inside Jud come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the LaMoure County page.

Answers from the rulebook for Jud

Rules another office applies inside Jud

Jud does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    Lots inside Jud city limits on which a new onsite wastewater system is installed.

    • This is an onsite-wastewater-system minimum, not evidence of a general municipal zoning lot-size requirement.
    • The rules took effect October 1, 2026.

    minimum lot size: >= 1 acre (new onsite wastewater system)

    “the minimum lot size in which a new system may be installed is one acre [.405 hectares].”
  • Who permits septicMixed (with conditions)

    Onsite wastewater systems inside Jud city limits under statewide North Dakota law.

    • The Department of Environmental Quality has exclusive authority to adopt rules; a permit is authorization from a local public health unit or other political subdivision for the specific site.
    • The source does not identify which local permitting authority serves Jud.
    “Except as otherwise provided by law, the department has the exclusive authority to adopt rules regarding licensing, permitting, and inspections of onsite wastewater treatment systems.”
  • Septic permitRequired

    Construction, alteration, repair, or extension of an onsite wastewater system inside Jud city limits.

    • Regular system maintenance does not require a permit.
    • The permit is issued by the permitting authority within the jurisdictional limits where work occurs.
    • A permit generally may not issue without a valid installer license, except for an individual installing a system on that individual's own premises.
    • A permit is valid for no more than 12 months.
    • The rules took effect October 1, 2026.

    permit validity: <= 12 months

    “any permit is valid for no more than twelve months from date of issuance.”
  • Septic inspectionRequired

    Installation of an onsite wastewater system inside Jud city limits.

    • Inspection must be conducted by the permitting authority or its authorized representative within one business day after receiving the request for inspection.
    • Inspection of existing equipment and system operation may be made at a reasonable time.
    • The rules took effect October 1, 2026.

    inspection timing after request: <= 1 business day

    “Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
  • Off-grid sanitationLimited

    Off-grid onsite wastewater disposal inside Jud city limits.

    • Water from bathrooms, kitchens, laundry fixtures, and other household plumbing must pass through a septic tank or higher treatment before discharge into soil.
    • If underground dispersal is infeasible, the permitting authority may review alternative collection and disposal methods.
    • The rules took effect October 1, 2026.
    “water carried from bathrooms, kitchens, laundry fixtures, and other household plumbing must pass through a septic tank or higher level of treatment prior to its discharge into the soil. if underground dispersal for treatment is not feasible, the permitting authority may review alternative methods of collection and disposal.”
  • Well permitLimited

    Water use from a private well inside Jud city limits.

    • A water-appropriation permit is required for domestic use exceeding 12.5 acre-feet annually.
    • Domestic use under 12.5 acre-feet annually does not require a water-appropriation permit, but constructed-works location and capacity must be reported to DWR.
    • This concerns water appropriation, not a local well-siting permit.

    domestic water use threshold: > 12.5 acre-feet per year (permit required when exceeded)

    “A water appropriation permit is required for: Any industrial water use; Irrigation of 5 acres or more; or Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”
  • Mandatory utility hookupConditional

    Proposed onsite wastewater systems inside Jud city limits where a public sewer is available.

    • This is a statewide onsite-wastewater permit condition, not proof that Jud operates water or sewer utilities.
    • The permitting authority may deny a septic-system permit when public sewer is within 200 feet of the property line, unless written documentation shows the sewer authority denied connection.
    • The rules took effect October 1, 2026.

    public sewer distance from property line: <= 200 feet (written documentation indicates denial of connection from the sewer authority)

    “the permitting authority may deny a permit for the construction of a system if a public sewer system is available within two hundred feet [60.96 meters] of the property line unless written documentation indicates denial of connection from the sewer authority.”
  • Permit feesVariable (with conditions)

    Onsite wastewater permits issued for work inside Jud city limits.

    • The permit fee is set by the applicable permitting authority; no official source identifying Jud's permitting authority or its fee schedule was located.
    • The rules took effect October 1, 2026.
    “The permit must be issued by the permitting authority within the jurisdictional limits where the work is being done. The fee for the permit must be set by the permitting authority. The permitting authority shall maintain records of all permits it has issued for the life of the system.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Jud or LaMoure County directly.

  • Building permit — Residential building construction inside Jud city limits.
  • Owner-builder exemption — Owner-built residences inside Jud city limits.
  • Building code adopted — Building construction inside Jud city limits.
  • Inspections — Residential building inspections inside Jud city limits.
  • Certificate of occupancy — New or altered residential occupancy inside Jud city limits.
15 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Jud publishes no rule on the point, not that none exists. LaMoure County’s page lists the county offices to call.

← All of LaMoure County: county rules, score and offices