LaMoure County, North Dakota
Edgeley is a city in LaMoure County, North Dakota. Edgeley adopts its own zoning, so inside its limits Edgeley’s rules apply, not the county’s. Septic permits inside Edgeley come from Edgeley. 18 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the LaMoure County page.
Buildings or structures erected, added to, or structurally altered inside Edgeley city limits.
building permit fee: 25 USD
“No building or structure shall be erected, added to or structurally altered until a permit therefore has been issued by the zoning administrator.”
Land use and buildings erected, altered, extended, or changed in use inside Edgeley city limits.
certificate issuance period after approved erection or alteration: <= 30 days
“No land shall be occupied or used and no building hereafter erected, altered or extended shall be used or changed in use until a certificate of occupancy shall have been issued by the zoning administrator, stating that the building or proposed use thereof complies with the provisions of this chapter.”
Land inside Edgeley city limits.
“No building, structure or premises shall be use or occupied, and no building or part thereof or other structure shall be erected, raised, moved, placed, reconstructed, extended, enlarged or altered except in conformity with the regulations herein specified for the district, as shown on the official map, in which it is located.”
Zoning districts inside Edgeley city limits.
“The City is hereby divided into the following Use Districts to be known as: R-1 Single Family Residential District R-2 Multi-Family Residential District C Commercial Districts”
Private wastewater disposal systems inside Edgeley city limits where public sewer is unavailable.
“A permit for a private wastewater disposal system shall not become effective until the installation is completed to the satisfaction of the superintendent.”
Private wastewater disposal systems inside Edgeley city limits where public sewer is not available under § 6.0303(4).
“Where a public sanitary or combined sewer is not available under the provisions of Section 6.0303 (4), the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this article. 3. A permit for a private wastewater disposal system shall not become effective until the installation is completed to the satisfaction of the superintendent.”
Permitted private wastewater disposal systems inside Edgeley city limits.
inspection after notice: <= 72 hours
“The superintendent shall be allowed to inspect the work at any stage of construction, and in any event, the applicant for the permit shall notify the superintendent when the work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within 72 hours of the receipt of notice by the superintendent.”
Private wastewater disposal inside Edgeley city limits.
“Where a public sanitary or combined sewer is not available under the provisions of Section 6.0303 (4), the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this article.”
Well water use for yard-water usage inside Edgeley city limits.
“No private water hook ups are to be used. Permits will be issued for well water use for yard water usage.”
Residential premises and occupied properties inside Edgeley city limits.
public sewer availability distance: <= 200 feet (Measured from the property line under the North Dakota plumbing code) · sewer connection deadline after official notice: <= 30 days
“It shall be unlawful for any person to use or occupy or permit to be used or occupied for residence purposes, any premises or building within the corporate limits of this City without first making or causing to be made proper connections with the City’s water facilities and mains.”
Construction, reconstruction, alteration, grading, or repair of a driveway inside Edgeley city limits.
“It shall be unlawful to construct, reconstruct, alter, grade or repair any public street, sidewalk, driveway, curbs or gutters without having first secured a permit therefore, unless said work is performed by the City contractor.”
Chapter 5 building permits inside Edgeley city limits.
building permit fee: 25 USD
“One copy of such layout or plot plan shall be returned when approved by the zoning administrator together with such permit to the applicant upon the payment of a fee of $25.”
Building-permit applications inside Edgeley city limits.
“There shall be submitted with all applications for building permits two copies of a layout or plot drawn to scale showing the actual dimensions of the lot to be built upon, the exact size and location on the lot of the building and accessory buildings to be erected and such other information as may be necessary to determine and provide for the enforcement of this ordinance.”
Edgeley does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential buildings in any Edgeley use district.
one-family minimum lot area: >= 7500 sq ft · two-family minimum lot area: >= 7500 sq ft · multi-family minimum lot area: >= 22500 sq ft
“1. One-family – not less than 7,500 sq. ft. 2. Two-family – not less than 7,500 sq. ft. 3. Multi-family – not less than 22,500 sq. ft.”
One-family, two-family, and multi-family districts inside Edgeley city limits.
“In one-family districts, there shall be: 1. A front yard of not less than 20 feet from the end of the public right-of-way. 2. A side yard on each side of not less than 10 feet. 3. A rear yard of not less than 30 feet.”
Residential buildings in any Edgeley use district.
one-family maximum floor area ratio: <= 50 percent of lot area · two-family maximum floor area ratio: <= 50 percent of lot area · multi-family maximum floor area ratio: <= 40 percent of lot area
“1. One-family not over 50% of the lot area. 2. Two-family not over 50% of the lot area. 3. Multi-family not over 40% of the lot area.”
R-1 Single Family Residential District inside Edgeley city limits.
“Conditional Uses 1. Hospitals and clinics excluding veterinary clinics. 2. Convalescent and nursing homes. 3. Condominiums and single family attached dwelling units. 4. Manufactured home units installed on a permanent foundation or basement.”
“Permitted Uses 1. Single Family detached and two family swelling units. 2. Multi-family swelling units. 3. Condominium and attached single family swelling units. 4. Manufactured homes installed on permanent foundations or basements.”
We looked and could not find an official answer yet. Silence is not permission; ask Edgeley or LaMoure County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Edgeley publishes no rule on the point, not that none exists. LaMoure County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Edgeley means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.