LaMoure County, North Dakota
Dickey is a city in LaMoure County, North Dakota. Septic permits inside Dickey come from the county and state together. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the LaMoure County page.
Dickey does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
An individual installing an onsite wastewater system on that individual's own premises inside Dickey city; this is an installer-license exemption, not evidence of a general building owner-builder exemption.
“An individual installing a system on the individual's premises is exempt from the requirements of this section. The individual shall obtain a permit for the system in accordance with section 33.1-21-01-06.”
Onsite wastewater systems, including septic systems, inside Dickey city when such a system is proposed.
“exclusive authority [...] local public health unit”
Construction, alteration, repair, or extension of an onsite wastewater system inside Dickey city.
permit validity: <= 12 months · public-sewer availability distance: <= 200 feet (Permitting authority may deny a system permit unless written documentation indicates denial of connection from the sewer authority.)
“A person may not construct, alter, repair, or extend any system without first obtaining a permit from the permitting authority. Regular system maintenance does not require a permit.”
Installation of an onsite wastewater system inside Dickey city.
inspection timing after request: <= 1 business day
“Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
Disposal of household wastewater through an onsite wastewater system inside Dickey city.
“Water carried from bathrooms, kitchens, laundry fixtures, and other household plumbing must pass through a septic tank or higher level of treatment prior to its discharge into the soil. If underground dispersal for treatment is not feasible, the permitting authority may review alternative methods of collection and disposal.”
Permit fees for onsite wastewater systems inside Dickey city.
“The permit must be issued by the permitting authority within the jurisdictional limits where the work is being done. The fee for the permit must be set by the permitting authority.”
Onsite wastewater-system permits inside Dickey city.
permit validity: <= 12 months (From date of issuance.)
“The permit must be issued by the permitting authority within the jurisdictional limits where the work is being done. The fee for the permit must be set by the permitting authority. The permitting authority shall maintain records of all permits it has issued for the life of the system.”
We looked and could not find an official answer yet. Silence is not permission; ask Dickey or LaMoure County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Dickey publishes no rule on the point, not that none exists. LaMoure County’s page lists the county offices to call.