Zoning, building permits and septic rules in Gilby, North Dakota

Gilby is a city in Grand Forks County, North Dakota. Gilby adopts its own zoning, so inside its limits Gilby’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Grand Forks County page.

Answers from the rulebook for Gilby

Gilby’s own rules

  • Building code adoptedPartial

    Buildings erected within Gilby's designated fire limits.

    • The cited provision applies only within fire limits; the source gives alternative descriptions of those limits.
    • Outbuildings of other material require a permit from the City governing board, which may grant or refuse it in its discretion.
    “No buildings or parts of any buildings shall be erected within the fire limits unless the construction meets the provisions of the North Dakota State Building Code, which is the official building code of the City.”
  • InspectionsLimited

    Buildings under construction in Gilby's fire limits for which a permit has issued.

    • Inspection is conducted as often as practical.
    • The official may stop work where defective or illegal work makes continued operation contrary to public welfare.
    “The building official, or chief of fire department, or other designated official, shall as often as practical, inspect all buildings or structures during construction for which a permit has been issued”
  • Certificate of occupancyRequired

    Land use and buildings erected, altered, extended, or changed in use within Gilby city limits.

    • The certificate is issued by the zoning administrator and must state compliance with Chapter Six.
    • Applications are concurrent with building-permit applications.
    • A temporary certificate for part of a building may be issued for no more than 30 days under Board of Adjustment rules.
    “No land shall be occupied or used and no building hereafter erected, altered or extended shall be used or changed in use until a certificate of occupancy shall have been issued by the zoning administrator”
  • Local zoningPresent (with conditions)

    Land within Gilby city limits.

    • Chapter Six establishes municipal use districts and zoning enforcement.
    “The City is hereby divided into the following Use Districts to be known as:”
  • Zoning districtsPublished (with conditions)

    Zoning districts within Gilby.

    • The ordinance names R-1, R-2, R-3, commercial, and industrial use districts.
    “R-1 Residential Districts, Single-Family R-2 Residential Districts, Two-Family R-3 Residential Districts, Multi-Family C Commercial Districts I Industrial Districts”
  • Septic permitRequired

    Construction of a private wastewater disposal system within Gilby where public sewer is unavailable under § 7.0303(4).

    • The applicant must use the City form and provide plans, specifications, and other information deemed necessary by the superintendent.
    • The permit is ineffective until installation is completed to the superintendent's satisfaction.
    • No permit may issue unless the system complies with North Dakota State Department of Health recommendations or regulations.
    “Before commencement of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the superintendent.”
  • Septic inspectionRequired

    Permitted private wastewater disposal systems within Gilby.

    • The applicant must notify the superintendent when work is ready for final inspection and before underground portions are covered.
    • The ordinance requires inspection within 72 hours after receipt of that notice.

    inspection timing after notice: <= 72 hours

    “The inspection shall be made within 72 hours of the receipt of notice by the superintendent.”
  • Mandatory utility hookupSewer (with conditions)

    Houses, buildings, or properties in Gilby used for human occupancy, employment, recreation, or other purposes and abutting a public-sewer street, alley, or right-of-way.

    • The public sanitary sewer must be within 200 feet of the property line.
    • Connection is at the owner's expense and must occur within 30 days after official notice.
    • The provision does not expressly impose an equivalent mandatory public-water connection.

    public sewer distance from property line: <= 200 feet · connection deadline after official notice: <= 30 days

    “within 30 days after date of official notice to do so, provided that said public sewer is within 200 feet (61 meters) of the property line according to the North Dakota plumbing code.”
  • Permit processPartial

    Private wastewater-disposal permits and zoning building-permit applications within Gilby.

    • For private wastewater systems, applications are on a City form with information deemed necessary by the superintendent.
    • For zoning building-permit applications, two copies of a scaled layout or plot are required.
    “There shall be submitted with all applications for building permits two copies of a layout or plot drawn to scale”

Rules another office applies inside Gilby

Gilby does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    One-family residential development in Gilby's R-1 single-family district.

    • The text applies to residence buildings erected, established, or altered in any use district.

    minimum lot area: >= 7000 square feet (one-family)

    “1. One-family - not less than 7000 sq. ft.”
  • SetbacksSpecified

    Structures in Gilby's one-family residential district.

    front yard: >= 25 feet · side yard each side: >= 5 feet · rear yard: >= 25 feet

    “In one-family districts there shall be: 1. A front yard of not less than 25 feet. 2. A side yard on each side of not less than 5 feet. 3. A rear yard of not less than 25 feet.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Gilby or Grand Forks County directly.

  • Building permit — General residential construction within Gilby city limits.
  • Owner-builder exemption — Owner-built residences within Gilby city limits.
  • Minimum dwelling size — Dwellings within Gilby.
  • Lot coverage — Lots within Gilby.
  • Building height — Buildings within Gilby.
11 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Gilby publishes no rule on the point, not that none exists. Grand Forks County’s page lists the county offices to call.