Dunn County, North Dakota
Halliday is a city in Dunn County, North Dakota. Halliday adopts its own zoning, so inside its limits Halliday’s rules apply, not the county’s. Septic permits inside Halliday come from Halliday. 8 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Dunn County page.
Construction, moving, additions, and structural alterations of buildings or structures inside Halliday city limits.
labor and materials threshold: >= 1000 USD (New fences, foundation or load-bearing-wall alterations, and concrete work require a permit regardless of cost.)
“No building or other structure shall be erected, moved, added to, or structurally altered wherein the labor and materials total one thousand dollars ($1,000) or more without a permit therefore, issued by the City Building Inspector.”
Buildings and structures in Halliday city.
“That code is hereby adopted and made a part of this chapter by reference with the exception of the following sections affecting local conditions in the City.”
Land inside Halliday city limits.
“The City of Halliday has developed a zoning code as a separate document, which is available from the City Auditor.”
Private wastewater disposal systems inside Halliday city limits.
“signed by the Water and Sewer Utility Superintendent”
Construction of a private wastewater disposal system inside Halliday city limits where public sewer is not available under § 7.0303(4).
“Before commencement of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the Water and Sewer Utility Superintendent.”
Private wastewater disposal systems inside Halliday city limits where public sewer is unavailable under § 7.0303(4).
“Where a public sanitary or combined sewer is not available under the provisions of Section 7.0303 (4), the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this article.”
City building permits for work inside Halliday city limits.
building permit fee for projects below threshold: 10 USD (Projects wherein labor and materials total less than $1,000.) · base building permit fee: 25 USD (Projects wherein labor and materials total $1,000 or more; plus $2 per additional $1,000.) · maximum building permit fee: <= 2023 USD
“For projects wherein labor and materials totals less than one thousand dollars ($1,000), the cost of the permit is ten dollars ($10).”
Construction permits inside Halliday city limits.
“Each application for a construction permit shall be accompanied by a plat in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the size, shape and location of the building to be erected and such other information as may be necessary to provide for the enforcement of this regulation.”
We looked and could not find an official answer yet. Silence is not permission; ask Halliday or Dunn County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Halliday publishes no rule on the point, not that none exists. Dunn County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Halliday means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.