Union County, North Carolina
Village of Marvin is a village in Union County, North Carolina. Village of Marvin adopts its own zoning, so inside its limits Village of Marvin’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Union County page.
Land and structures inside the Village of Marvin and its planning and development regulation jurisdiction.
“The provisions of this Ordinance shall apply to all the territory encompassed in the Village of Marvin, North Carolina, and its planning and development regulation jurisdiction, including any extraterritorial jurisdiction as now or hereafter fixed”
Zoning districts in Marvin village and its planning and development regulation jurisdiction.
“The Village and its planning and development regulation jurisdiction, including any extraterritorial jurisdiction, as now or hereafter fixed, is hereby divided into districts, as established in Article 8 (Zoning Districts) and as shown on the Official Zoning Map”
Structures and lots inside Marvin village under the applicable Article 8 zoning district and Article 9 lot type.
“In issuing special use zoning permits, the Marvin Board of Adjustment may prescribe dimensional requirements (height, setback, etc.) that are different from the requirements of the corresponding general zoning classification”
Manufactured-home parks/courts inside Marvin village.
“The development and/or subdivision of land for the purpose of Manufactured Home Parks/Courts is prohibited in all primary general use districts; including the placement, erection, storage and/or construction of Manufactured Homes in existing non-conforming Manufactured Home Parks. Exception is taken to this regulation where the Manufactured Home Overlay (MHO) District standards and specifications supplement the primary general use district standards and specifications.”
A lot with one principal dwelling and conforming accessory structures in a Marvin single-family zoning district.
maximum ADU gross floor area: <= 900 square feet (Or 40% of principal-structure gross floor area, whichever is less.)
“The maximum gross floor area for the Accessory Dwelling Unit shall be 900 SF or 40% of the gross floor area of the principal structure, whichever is less.”
Principal uses and subdivision lots inside Marvin village that are not served by a public wastewater collection, transport, and treatment system.
“Every principal use and every lot within a subdivision not served by a public wastewater collection, transport and treatment system shall be served by an accepted wastewater system, in accordance with NCGS 130A-335, that is adequate to accommodate the reasonable needs of such use or subdivision lot and that complies with all applicable health regulations.”
New development inside Marvin village.
“All new development shall be connected to an approved potable water supply system and approved wastewater collection and/or treatment system in accordance with Village of Marvin adopted policies.”
Bona fide farms inside Marvin village.
“This Ordinance shall govern the development and use of all land and structures within the Village as provided for by Chapter 160D, except for bona fide farms in accordance with G.S.160D-903(c)-(e).”
Short-term rental of rooms in residential properties inside Marvin village.
short-term rental period: < 30 days
“Tourist/temporary residence. A residential property or any portion thereof, being rented by the owner of said residential property or their agents for vacation, leisure or recreation purposes for periods of fewer than 30 days.”
Village zoning and planning permits inside Marvin village.
“FY 26-27 Fee Schedule (Effective 7/1/26)”
Village zoning permits for construction and listed improvements inside Marvin village.
typical zoning-permit turnaround: 24 to 48 hours
“The typical turnaround time for a zoning permit is twenty-four (24) to forty-eight (48) hours. The Village of Marvin does not issue building permits, this is handled by Union County, however a zoning permit with the Village must be obtained in order to receive a building permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Marvin or Union County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Marvin publishes no rule on the point, not that none exists. Union County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Marvin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.