Union County, North Carolina
Village of Lake Park is a village in Union County, North Carolina. Village of Lake Park adopts its own zoning, so inside its limits Village of Lake Park’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Union County page.
New construction in Lake Park Special Flood Hazard Areas subject to a Floodplain Development Permit.
“A final as-built Elevation Certificate (FEMA Form 81-31) is required after construction is completed and prior to Certificate of Occupancy issuance.”
All public and private lands within Lake Park village corporate limits.
“This Ordinance consolidates the Village’s land use regulatory authority as authorized by the North Carolina General Statutes, and is adopted pursuant to the authority granted to the Village of Lake Park by Chapter 160D, of the North Carolina General Statutes.”
Zoning districts within Lake Park village jurisdiction.
published residential districts: GD, VH, R-6, R-10, R-17, R-25, MF · published nonresidential districts: CS, VC, GB, I
“The Official Zoning Map designates the location and boundaries of the zoning districts established by this Ordinance. The Official Zoning Map, shall be kept on file in the office of the Village Clerk, and is available for public inspection during normal business hours.”
New lots in Lake Park single-family residential districts GD, VH, R-6, R-10, R-17, and R-25.
GD minimum lot size: 3350 square feet · VH minimum lot size: 2000 square feet · R-6 minimum lot size: 6000 square feet · R-10 minimum lot size: 10000 square feet · R-17 minimum lot size: 17000 square feet · R-25 minimum lot size: 25000 square feet
“DISTRICT GD VH R-6 R-10 R-17 R-25 Minimum Lot Size (square feet) 3,350 2,000 6,000 10,000 17,000 25,000”
Development in Lake Park UDO zoning districts.
R-10 street front setback: 30 feet (P indicates prevailing setbacks are required) · R-10 interior side setback: 8 feet · R-10 rear setback: 30 feet
“Street Front Setback (feet) 5/P 10/P 20/P 30/P 40 50 0/P 30 0/P 5 50 Street Side Setback (feet) 5 5 10 15 20 25 10 10 0 5 50 Interior Side Setback (feet) 0 0 5 8 10 12 0 5 0 0 50 Rear Setback (feet) 5 10 20 30 40 40 10 20 0 25 50”
Development in Lake Park UDO zoning districts.
R-10 maximum lot coverage: 40 percent of lot area
“Maximum Lot Coverage (% of lot area) 70 80 50 40 30 30 90 50 100 50 25”
Development in Lake Park UDO zoning districts.
maximum height: 35 feet (Table 7-4 applies to GD, VH, R-6, R-10, R-17, R-25, MF, CS, VC, GB, and I districts)
“Maximum Height (feet) 35 35 35 35 35 35 35 35 35 35 35”
Manufactured homes in Lake Park residential zoning districts where the UDO use table marks the use S.
“An “S” indicates that a use is only allowed if approved through the approval of a Special Use Permit.”
Lots in subdivisions governed by Lake Park UDO Article 11.
“11.6.2 Water and Sewer Connection All lots must be connected to public water and sewer utilities.”
Subdivision final plats in Lake Park village limits.
“A Subdivision Final Plat shall only be approved if the Village Council finds the following: (1) The Final Plat complies fully with the standards in Article 11, Subdivision Regulations;”
Lots in Lake Park subdivisions.
“All lots must have direct access to a public street with sufficient width to accommodate a conforming vehicular access driveway.”
Land-development activities in Lake Park Special Flood Hazard Areas.
“All land development activities proposed for lands which lie within a Special Flood Hazard Area must obtain a Floodplain Development Permit prior to application for a Zoning Permit.”
Zoning permits for development and land-use activity inside Lake Park village jurisdiction.
zoning permit expiry without building permit: 6 months (For development activity that requires a Building Permit)
“No activity subject to regulation by this Ordinance, including any land development, building or construction activity, architectural changes to existing structures, or the change, expansion or enlargement of any use of land or structures, may commence prior to the issuance of a Zoning Permit in accordance with this Section.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Lake Park or Union County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Lake Park publishes no rule on the point, not that none exists. Union County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Lake Park means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.