Pitt County, North Carolina
Town of Farmville is a town in Pitt County, North Carolina. Town of Farmville adopts its own zoning, so inside its limits Town of Farmville’s rules apply, not the county’s. Septic permits inside Town of Farmville come from the county and state together. 18 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Pitt County page.
A building erected, altered, or moved, or land/building undergoing a change of use, inside Farmville town limits.
“A certificate of compliance issued by the Zoning Administrator and certifying that the building and/or premises is ready for occupancy in conformity with this chapter, is required in advance of occupancy or use of a building hereafter erected, altered or moved, or a change of use of any building or land.”
Land inside Farmville town limits.
“all of which shall be known as the “Farmville Zoning Ordinance”. This chapter shall apply to all land within the Town’s planning jurisdiction which includes corporate and extra-territorial jurisdiction, as shown on the official zoning map or described by ordinance.”
Land inside Farmville town limits subject to the Town zoning ordinance and official zoning map.
“R-15 residential district is intended to be a quiet low density neighborhood of single-family residences along with limited private and public community uses. This district is designed for areas with access to public water or sewer. (B) Permitted uses. (1) Single-family dwellings;”
Single-family dwellings in Farmville's R-15 Residential District.
minimum lot area: >= 15000 square feet · minimum lot width: >= 90 feet
“R-15 Residential Single-Family - 30' Front, 12' Side, 22’ Corner Yard, 25' Rear, 90' Lot Width, 15,000 SF Lot Area”
“RA-20 Residential/Agriculture Single-Family - 30' Front, 12' Side, 22’ Corner Yard, 25' Rear, 100' Lot Width, 20,000 SF Lot Area”
Single-family dwellings in Farmville's R-15 Residential District.
front setback: >= 30 feet · side setback: >= 12 feet · corner-yard setback: >= 22 feet · rear setback: >= 25 feet
“R-15 Residential Single-Family - 30' Front, 12' Side, 22’ Corner Yard, 25' Rear, 90' Lot Width, 15,000 SF Lot Area”
“RA-20 Residential/Agriculture Single-Family - 30' Front, 12' Side, 22’ Corner Yard, 25' Rear, 100' Lot Width, 20,000 SF Lot Area”
Zoning districts inside Farmville town limits other than the Central Business District.
maximum permissible lot coverage: <= 50 percent (Central Business District (CBD))
“Maximum permissible lot coverage by the principal building and all accessory buildings shall not exceed 50% of the total lot area, except for the central business district (CBD) which shall have no limitation on lot coverage.”
Single-family manufactured housing on individual lots in Farmville's R-M.H. Residential Manufactured Housing District.
“This district is designed for high-density residential purposes for manufactured housing located on individual lots and in manufactured home parks and other uses which would not be detrimental to the residential nature of the district. (B) Permitted uses. (1) Single-family manufactured housing on individual lots;”
A subdivision inside Farmville town limits where public water or public sewer is available at the subdivision boundary.
“The developer of any subdivision located within the corporate limits which has either public water or public sewer systems, or both, available at the boundary of the subdivision, shall, with prior approval of utility plans and specifications by the Town Board, Planning Board and Town Engineer, connect with available systems in accordance with applicable ordinances and policies of the town before the plat shall be eligible for final approval.”
Subdivision plats inside Farmville town limits.
“The size of all lots shall conform with the Town Zoning Ordinance. Whenever there is a discrepancy between the minimum standards or dimensions noted herein and those contained in the Zoning Ordinance, Building Codes or other official regulations, the more stringent requirements shall apply.”
Farmville planning, zoning, and land-use applications.
residential zoning compliance application fee: 25 USD · commercial zoning compliance application fee: 50 USD
“Planning, Zoning & Land Use Fees: Zoning Compliance Application $25 - Residential”
Farmville building-permit applications.
approximate plan review time: 5 days (approximately)
“Building permits require two sets of plans being turned in along with the permit application form. Plan review time approximately 5 days.”
Town of Farmville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction, reconstruction, alteration, repair, movement, removal, or demolition of a building or structure inside Farmville town limits when covered by G.S. 160D-1110.
“Except as provided in subsection (c) of this section, and subsection (h) of G.S. 160D-1110.1, no person shall commence or proceed with any of the following without first securing all permits required by the North Carolina State Building Code and any other State or local laws applicable to any of the following activities:”
On-site wastewater systems inside Farmville town limits where the site is not served by an approved wastewater system.
“No person shall commence or assist in the installation, construction, or repair of a wastewater system unless an Improvement Permit and a Construction Authorization have been obtained from the Department or the local health department unless that person is acting in accordance with the conditions and criteria of an engineered option permit pursuant to G.S. 130A-336.1 or the Authorized On-Site Wastewater Evaluator permit option pursuant to G.S. 130A-336.2.”
Construction, location, relocation, installation, construction, or repair of an on-site wastewater system for land inside Farmville town limits not served by an approved wastewater system.
“No person shall commence or assist in the installation, construction, or repair of a wastewater system unless an Improvement Permit and a Construction Authorization have been obtained from the Department or the local health department unless that person is acting in accordance with the conditions and criteria of an engineered option permit pursuant to G.S. 130A-336.1 or the Authorized On-Site Wastewater Evaluator permit option pursuant to G.S. 130A-336.2.”
On-site wastewater systems inside Farmville town limits before they are covered or put into use.
“No system of wastewater collection, treatment and disposal shall be covered or placed into use by any person until an inspection by the local health department has determined that the system has been installed or repaired in accordance with any conditions of the Improvement Permit, the rules, and this Article.”
On-site sanitation for a residence, business, or public assembly inside Farmville town limits that is not served by an approved wastewater system.
“A person owning or controlling a residence, place of business or a place of public assembly shall provide an approved wastewater system.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Farmville or Pitt County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Farmville publishes no rule on the point, not that none exists. Pitt County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Farmville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.