Town of Hassell is a town in Martin County, North Carolina. Septic permits inside Town of Hassell come from Town of Hassell. 8 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Martin County page.
Town of Hassell does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction, reconstruction, alteration, repair, movement, removal, or demolition of a building or structure inside Hassell town limits when covered by G.S. 160D-1110.
low-cost work threshold: <= 40000 USD (G.S. 160D-1110(c) exceptions apply)
“no person shall commence or proceed [...] without first securing all permits required”
Work proceeding under a building permit inside Hassell town limits.
“local inspectors shall make as many inspections”
A new, enlarged, altered, or moved building covered by G.S. 160D-1116 inside Hassell town limits.
“no new building or part thereof may be occupied [...] until the inspection department has issued a certificate of compliance”
On-site wastewater systems serving land inside Hassell town limits that is not served by an approved wastewater system.
“No person shall commence or assist in the construction, location, or relocation of a residence, place of business, or place of public assembly in an area not served by an approved wastewater system unless an improvement permit and a construction authorization are obtained from the local health department unless that person is acting in accordance with the conditions and criteria of an engineered option permit pursuant to G.S. 130A-336.1 or the Authorized On-Site Wastewater Evaluator permit option pursuant to G.S. 130A-336.2.”
Construction, location, relocation, installation, construction, or repair of an on-site wastewater system inside Hassell town limits where an approved wastewater system does not serve the site.
“an Improvement Permit and a Construction Authorization”
An on-site wastewater system inside Hassell town limits before it is covered or placed into use.
“until an inspection by the local health department”
Construction or repair of a private drinking-water well inside Hassell town limits.
“Construct or assist in the construction of a private drinking water well unless a construction permit has been obtained from the local health department.”
State statutory permit prerequisites applicable to construction inside Hassell town limits.
“shall be issued until a construction authorization”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Hassell or Martin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Hassell publishes no rule on the point, not that none exists. Martin County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Hassell means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.